If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.425    -0.05 (-2.04%)
Bid:
2.40
Ask:
2.45
Spread: 0.05 (2.083%)
Market Cap: £77.54m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Completion of Drilling Programme at Tjate

18 Feb 2009 09:00

RNS Number : 4995N
Jubilee Platinum PLC
18 February 2009
 



18 February 2009

AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

JUBILEE PLATINUM PLC

("Jubilee" or "the Company")

Completion of Drilling Programme at the Tjate project and Results Update

Jubilee Platinum, the AIM quoted and JSE Limited listed mining exploration and development Company with a focus on platinum group metals (PGM) in South Africa, is pleased to announce the completion of its 42-borehole drilling programme including new preliminary and final results from thirteen boreholes drilled on Jubilee's Tjate platinum project in the eastern Bushveld Complex in South Africa. This drilling programme forms part of Phase two of the feasibility study that commenced in early 2008.

Highlights 

The drilling programme for Phase two of the feasibility study has now been completed;

All 13 boreholes intersected the Merensky Reef (MR), (of which 2 intersected pothole facies), at expected projected depths (from plain elevation), with grades and thicknesses generally in line with the variability expected for this reef; 

Borehole DT35 intersected high assays in the motherhole MR (10.43 g/t 3PGE + Au) (combined platinum, palladium, rhodium and gold)0.35% nickel (Ni) and 0.21% copper (Cu) over 0.99 metres - further results awaited from additional deflection drilling;

Borehole DT40 intersected MR averaging 3.04 metres thick and assaying 6.71 g/t 3PGE+Au with 0.16% Ni and 0.10% Cu - further deflection results awaited; 

Boreholes DT30 and DT33, intersected specifically targeted UG2 chromitite (UG2) reef at projected depths with higher than expected grades of up to 7.8g/t 3PGE+Au; and  

Borehole FF01, which tested continuity of MR in the adjacent down dip farm Fernkloof, intersected MR at approximate target depth (1,597m down hole from collar).

Detailed results are summarised in Table 1 below.

 

Table 1 Summary of Merensky Reef (Optimal ("Mining") Cuts) and UG2 Chromitite reef Intersections 

Borehole

Reef 

Intersected 

 Depth 

(from collar) 

m

Weighted averages

Apparent Thickness m

3PGE+Au 

g/t

Estimated 5PGE+Au

g/t **

Copper 

%

Nickel

%

DT21

MR

1,098

1.04

4.15

4.4

0.12

0.21

DT22

MR

852

1.55 

4.43

4.7

0.12

0.21

DT24

MR

1,025

1.01

5.40

5.8

0.14

0.20

DT28 

MR

1,016

1.02

2.04

2.2

0.09

0.13

DT29 

MR pothole

1384

0.98

4.07

4.3

0.07

0.19

DT30

MR pothole *

1,291

1.13

0.00

0.00

0.00

0.00

DT31 

MR

1,210

1.02

2.04

2.2

0.09

0.13

DT33 

MR

1,344

1.08

2.65

2.8

0.09

0.13

DT35

MR motherhole *

1,252

0.99

10.43

11.1

0.21

0.35

DT36

MR *

705

1.46

4.48

4.8

0.10

0.13

DT38

MR *

1,095

1.19

2.67

3.11

0.13

0.18

DT40

MR

1,314

3.04

6.71

7.1

0.10

0.16

FF01

MR

1,597

2.81

2.72

2.9

0.08

0.13

DT30

UG2

1,602

0.65

7.85

9.2

na

na

DT33

UG2

1,700

0.66

7.74

9.1

na

na

DT36

UG2 pothole

1104

0.55

1.51

1.8

na

na

 

na not assayed/not applicable * deflections awaited ** factor applied to 3PGE+Au values to include ruthenium (Ru) and iridium (Ir) based on average of Ru and Ir analysis of four MR drill core and two UG2 drill core intersections selected.

Colin Bird, CEO of Jubilee and Tjate Project Manager said: "These new results continue to confirm the continuity at depth of the Merensky and UG2 reefs. The lower grades seen in some of the new borehole results correlate generally with a regional pothole within a lower grade area confined to the northwest of the farm Dsjate. The effect of this area will be considered in the options when delineating the resource and defining a resource estimate. The drilling programme for the second phase of the feasibility study was completed this month and the project is now rapidly advancing towards a definitive compliant mineral resource estimate." 

Note to Editors

The Tjate Project comprises three contiguous farms, totalling 5,143 hectares in the eastern Bushveld: Dsjate, Fernkloof and Quartz Hill. The farms are downdip of Impala Platinum's operating Marula platinum mine and of Anglo Platinum's developing Twickenham platinum mine. Jubilee is advancing the Project to feasibility study (FS).

SGS Lakefield Research Africa in Johannesburg carried out the analyses of the borehole core samples. This laboratory is SNAS TO169 accredited.

For further information please contact:

Colin Bird Nick Rome/Michael Kinirons

Jubilee Platinum plc Bishopsgate Communications Ltd 

Tel: +44 (0) 20 7584 2155 Tel +44 (0) 20 7562 3350

Gerard Kisbey-Green

Investec Bank plc

Tel +44 (0)20 7597 5000

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUWSWRKURUARR
Date   Source Headline
5th Nov 20208:00 amRNSExecution of further copper tailings transactions
12th Oct 20207:00 amRNSQuarterly Operations Update Q3 2020
14th Sep 202012:30 pmRNSKabwe Mining Licence Renewed & Board Appointment
24th Aug 20207:00 amRNSNew Processing Agreement: Ore Beneficiation Plant
13th Aug 20207:00 amRNSChrome Operations Update
6th Aug 20207:00 amRNSFurther Copper Tailings Resource Secured in Zambia
13th Jul 20207:00 amRNSSix Month Operations Update
18th Jun 20207:00 amRNSLarge Copper Tailings Resources in Zambia Secured
19th May 202011:30 amRNSRelocation of chrome plant to maximise earnings
7th May 20202:00 pmRNSOperations Update in South Africa and Zambia
17th Apr 20209:15 amRNSUpdate: Operations during lockdown in South Africa
26th Mar 202010:10 amRNSUnaudited interim results
24th Mar 202011:33 amRNSSOUTH AFRICAN 21-DAY LOCKDOWN UPDATE
23rd Mar 20204:41 pmRNSSecond Price Monitoring Extn
23rd Mar 20204:37 pmRNSPrice Monitoring Extension
20th Mar 20204:47 pmRNSSecond Price Monitoring Extn
20th Mar 20204:42 pmRNSPrice Monitoring Extension
20th Mar 20202:05 pmRNSSecond Price Monitoring Extn
20th Mar 20202:00 pmRNSPrice Monitoring Extension
16th Mar 20204:42 pmRNSSecond Price Monitoring Extn
16th Mar 20204:37 pmRNSPrice Monitoring Extension
21st Feb 202010:10 amRNSDirector Dealing
28th Jan 20208:15 amRNSSix Monthly Operations Update
6th Dec 201912:45 pmRNSResults of AGM
3rd Dec 20197:00 amRNSDirector Dealing
25th Nov 20192:24 pmRNSTR-1: notification of major holdings
14th Nov 20191:15 pmRNSEquity Placing to Support Targeted Growth
14th Nov 20197:36 amRNSResults for year ended 30 June 2019 & AGM Notice
5th Nov 20198:30 amRNSAcquisition of all chrome rights at Hernic
24th Oct 20193:11 pmRNSAcquisition at Hernic: Transforming Operations
24th Sep 20197:00 amRNSNew Corporate Presentation
17th Sep 20197:00 amRNSKabwe Multi-Metal Processing Project Update
5th Sep 20198:00 amRNSWindsor PGM Project - Full Operational Status
23rd Aug 201910:15 amRNSCompletion of Acquisition in Kabwe & Joint Broker
5th Aug 20199:00 amRNSSix Monthly Operations Update
11th Jul 20197:00 amRNSProjects Update
5th Jun 20191:45 pmRNSProjects Update
9th May 20197:00 amRNSQuarterly Operations Update Q1 2019
3rd May 201912:30 pmRNSTR-1: notification of major holdings
23rd Apr 20197:00 amRNSPrice Monitoring Extension
5th Apr 20192:05 pmRNSSecond Price Monitoring Extn
5th Apr 20192:00 pmRNSPrice Monitoring Extension
4th Apr 20194:41 pmRNSTR-1: notification of major holdings
3rd Apr 20192:26 pmRNSTR-1 NOTIFICATION OF CHANGE IN MAJOR HOLDINGS
2nd Apr 20194:40 pmRNSSecond Price Monitoring Extn
2nd Apr 20194:35 pmRNSPrice Monitoring Extension
29th Mar 20191:35 pmRNSVoting Rights and Capital
29th Mar 201910:38 amRNSTR-1: Form for notification of major holdings
28th Mar 20197:00 amRNSUnaudited interim results
21st Mar 201910:58 amRNSFunding secured for Kabwe Project and Acquisition

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.