If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.35    0.00 (0.00%)
Bid:
2.30
Ask:
2.40
Spread: 0.10 (4.348%)
Market Cap: £77.54m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Completion of Drilling Programme at Tjate

18 Feb 2009 09:00

RNS Number : 4995N
Jubilee Platinum PLC
18 February 2009
 



18 February 2009

AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

JUBILEE PLATINUM PLC

("Jubilee" or "the Company")

Completion of Drilling Programme at the Tjate project and Results Update

Jubilee Platinum, the AIM quoted and JSE Limited listed mining exploration and development Company with a focus on platinum group metals (PGM) in South Africa, is pleased to announce the completion of its 42-borehole drilling programme including new preliminary and final results from thirteen boreholes drilled on Jubilee's Tjate platinum project in the eastern Bushveld Complex in South Africa. This drilling programme forms part of Phase two of the feasibility study that commenced in early 2008.

Highlights 

The drilling programme for Phase two of the feasibility study has now been completed;

All 13 boreholes intersected the Merensky Reef (MR), (of which 2 intersected pothole facies), at expected projected depths (from plain elevation), with grades and thicknesses generally in line with the variability expected for this reef; 

Borehole DT35 intersected high assays in the motherhole MR (10.43 g/t 3PGE + Au) (combined platinum, palladium, rhodium and gold)0.35% nickel (Ni) and 0.21% copper (Cu) over 0.99 metres - further results awaited from additional deflection drilling;

Borehole DT40 intersected MR averaging 3.04 metres thick and assaying 6.71 g/t 3PGE+Au with 0.16% Ni and 0.10% Cu - further deflection results awaited; 

Boreholes DT30 and DT33, intersected specifically targeted UG2 chromitite (UG2) reef at projected depths with higher than expected grades of up to 7.8g/t 3PGE+Au; and  

Borehole FF01, which tested continuity of MR in the adjacent down dip farm Fernkloof, intersected MR at approximate target depth (1,597m down hole from collar).

Detailed results are summarised in Table 1 below.

 

Table 1 Summary of Merensky Reef (Optimal ("Mining") Cuts) and UG2 Chromitite reef Intersections 

Borehole

Reef 

Intersected 

 Depth 

(from collar) 

m

Weighted averages

Apparent Thickness m

3PGE+Au 

g/t

Estimated 5PGE+Au

g/t **

Copper 

%

Nickel

%

DT21

MR

1,098

1.04

4.15

4.4

0.12

0.21

DT22

MR

852

1.55 

4.43

4.7

0.12

0.21

DT24

MR

1,025

1.01

5.40

5.8

0.14

0.20

DT28 

MR

1,016

1.02

2.04

2.2

0.09

0.13

DT29 

MR pothole

1384

0.98

4.07

4.3

0.07

0.19

DT30

MR pothole *

1,291

1.13

0.00

0.00

0.00

0.00

DT31 

MR

1,210

1.02

2.04

2.2

0.09

0.13

DT33 

MR

1,344

1.08

2.65

2.8

0.09

0.13

DT35

MR motherhole *

1,252

0.99

10.43

11.1

0.21

0.35

DT36

MR *

705

1.46

4.48

4.8

0.10

0.13

DT38

MR *

1,095

1.19

2.67

3.11

0.13

0.18

DT40

MR

1,314

3.04

6.71

7.1

0.10

0.16

FF01

MR

1,597

2.81

2.72

2.9

0.08

0.13

DT30

UG2

1,602

0.65

7.85

9.2

na

na

DT33

UG2

1,700

0.66

7.74

9.1

na

na

DT36

UG2 pothole

1104

0.55

1.51

1.8

na

na

 

na not assayed/not applicable * deflections awaited ** factor applied to 3PGE+Au values to include ruthenium (Ru) and iridium (Ir) based on average of Ru and Ir analysis of four MR drill core and two UG2 drill core intersections selected.

Colin Bird, CEO of Jubilee and Tjate Project Manager said: "These new results continue to confirm the continuity at depth of the Merensky and UG2 reefs. The lower grades seen in some of the new borehole results correlate generally with a regional pothole within a lower grade area confined to the northwest of the farm Dsjate. The effect of this area will be considered in the options when delineating the resource and defining a resource estimate. The drilling programme for the second phase of the feasibility study was completed this month and the project is now rapidly advancing towards a definitive compliant mineral resource estimate." 

Note to Editors

The Tjate Project comprises three contiguous farms, totalling 5,143 hectares in the eastern Bushveld: Dsjate, Fernkloof and Quartz Hill. The farms are downdip of Impala Platinum's operating Marula platinum mine and of Anglo Platinum's developing Twickenham platinum mine. Jubilee is advancing the Project to feasibility study (FS).

SGS Lakefield Research Africa in Johannesburg carried out the analyses of the borehole core samples. This laboratory is SNAS TO169 accredited.

For further information please contact:

Colin Bird Nick Rome/Michael Kinirons

Jubilee Platinum plc Bishopsgate Communications Ltd 

Tel: +44 (0) 20 7584 2155 Tel +44 (0) 20 7562 3350

Gerard Kisbey-Green

Investec Bank plc

Tel +44 (0)20 7597 5000

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUWSWRKURUARR
Date   Source Headline
16th May 201412:00 pmRNSHolding(s) in Company
6th May 20148:04 amRNS3rd ARC Furnace Commissioned and Operational
24th Apr 20149:31 amRNSHolding(s) in Company
24th Apr 20149:30 amRNSHolding(s) in Company
22nd Apr 20143:01 pmRNSHolding(s) in Company
22nd Apr 20143:00 pmRNSHolding(s) in Company
14th Apr 20147:00 amRNS3rd ARC furnace and update on Tjate project
26th Mar 201410:45 amRNSInterim Results
13th Mar 20147:00 amRNSPLA Update
24th Feb 20147:00 amRNSFunding Update
20th Feb 20142:00 pmRNSPower sales contract reinstated
14th Feb 201412:00 pmRNSShare issue
5th Feb 201410:20 amRNSConversion of Loan Notes to equity
30th Jan 20148:28 amRNSOperations Update
2nd Jan 20147:00 amRNSProduction and Financing Update
30th Dec 201311:32 amRNSHolding(s) in Company
30th Dec 201311:30 amRNSHolding(s) in Company
23rd Dec 20131:02 pmRNSAdditional Funding Secured
18th Dec 20138:00 amRNSTrading on ALTx and resignation of director
5th Dec 20137:10 amRNSOperations Update
29th Nov 20131:45 pmRNSResult of AGM
7th Nov 20132:30 pmRNSNotice of AGM and Posting of Report and Accounts
28th Oct 20137:00 amRNSFunding
15th Oct 20132:00 pmRNSDirector Dealing
2nd Oct 20137:00 amRNSTjate Update and Issue of Equity
27th Sep 20133:01 pmRNSFinal Results
28th Aug 201310:00 amRNSDisclosure of decrease in holdings below 5%
20th Aug 20139:30 amRNSIssue of Equity
2nd Aug 20137:00 amRNSUpdate on Disposal
30th Jul 20137:00 amRNSMarket Update
10th Jul 20137:00 amRNSMarket Update
21st Jun 20137:00 amRNSAcquisition of PLA market update
19th Jun 20131:45 pmRNSAcquisition of PLA update
19th Jun 20137:30 amRNSUPDATE ON THE DISPOSAL OF NON-CORE ASSETS
13th Jun 20137:00 amRNSTransaction Update
11th Jun 20139:30 amRNSAcquisition of PLA market update
3rd Jun 201312:30 pmRNSPRO FORMA FINANCIAL EFFECTS
30th May 201311:00 amRNSIssue of shares
28th May 20132:15 pmRNSResults of General Meeting
28th May 20138:45 amRNSDisposal of non-core asset
22nd May 20137:00 amRNSOperations Update
14th May 20134:15 pmRNSDirector's Dealing
3rd May 20137:00 amRNSMerger Update
26th Apr 20132:30 pmRNSCircular and notice of general meeting
25th Apr 20137:00 amRNSDirector Dealing
16th Apr 201311:00 amRNSDirector Dealing
12th Apr 20137:00 amRNSAmendment re Pro forma financial effects
11th Apr 201311:30 amRNSPRO FORMA FINANCIAL EFFECTS
2nd Apr 20137:30 amRNSRestoration - Jubilee Platinum Plc
28th Mar 20136:26 pmRNSInterim Results ended 31 December 2012

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.