If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.35    0.00 (0.00%)
Bid:
2.30
Ask:
2.40
Spread: 0.10 (4.348%)
Market Cap: £77.54m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Completion of Drilling Programme at Tjate

18 Feb 2009 09:00

RNS Number : 4995N
Jubilee Platinum PLC
18 February 2009
 



18 February 2009

AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

JUBILEE PLATINUM PLC

("Jubilee" or "the Company")

Completion of Drilling Programme at the Tjate project and Results Update

Jubilee Platinum, the AIM quoted and JSE Limited listed mining exploration and development Company with a focus on platinum group metals (PGM) in South Africa, is pleased to announce the completion of its 42-borehole drilling programme including new preliminary and final results from thirteen boreholes drilled on Jubilee's Tjate platinum project in the eastern Bushveld Complex in South Africa. This drilling programme forms part of Phase two of the feasibility study that commenced in early 2008.

Highlights 

The drilling programme for Phase two of the feasibility study has now been completed;

All 13 boreholes intersected the Merensky Reef (MR), (of which 2 intersected pothole facies), at expected projected depths (from plain elevation), with grades and thicknesses generally in line with the variability expected for this reef; 

Borehole DT35 intersected high assays in the motherhole MR (10.43 g/t 3PGE + Au) (combined platinum, palladium, rhodium and gold)0.35% nickel (Ni) and 0.21% copper (Cu) over 0.99 metres - further results awaited from additional deflection drilling;

Borehole DT40 intersected MR averaging 3.04 metres thick and assaying 6.71 g/t 3PGE+Au with 0.16% Ni and 0.10% Cu - further deflection results awaited; 

Boreholes DT30 and DT33, intersected specifically targeted UG2 chromitite (UG2) reef at projected depths with higher than expected grades of up to 7.8g/t 3PGE+Au; and  

Borehole FF01, which tested continuity of MR in the adjacent down dip farm Fernkloof, intersected MR at approximate target depth (1,597m down hole from collar).

Detailed results are summarised in Table 1 below.

 

Table 1 Summary of Merensky Reef (Optimal ("Mining") Cuts) and UG2 Chromitite reef Intersections 

Borehole

Reef 

Intersected 

 Depth 

(from collar) 

m

Weighted averages

Apparent Thickness m

3PGE+Au 

g/t

Estimated 5PGE+Au

g/t **

Copper 

%

Nickel

%

DT21

MR

1,098

1.04

4.15

4.4

0.12

0.21

DT22

MR

852

1.55 

4.43

4.7

0.12

0.21

DT24

MR

1,025

1.01

5.40

5.8

0.14

0.20

DT28 

MR

1,016

1.02

2.04

2.2

0.09

0.13

DT29 

MR pothole

1384

0.98

4.07

4.3

0.07

0.19

DT30

MR pothole *

1,291

1.13

0.00

0.00

0.00

0.00

DT31 

MR

1,210

1.02

2.04

2.2

0.09

0.13

DT33 

MR

1,344

1.08

2.65

2.8

0.09

0.13

DT35

MR motherhole *

1,252

0.99

10.43

11.1

0.21

0.35

DT36

MR *

705

1.46

4.48

4.8

0.10

0.13

DT38

MR *

1,095

1.19

2.67

3.11

0.13

0.18

DT40

MR

1,314

3.04

6.71

7.1

0.10

0.16

FF01

MR

1,597

2.81

2.72

2.9

0.08

0.13

DT30

UG2

1,602

0.65

7.85

9.2

na

na

DT33

UG2

1,700

0.66

7.74

9.1

na

na

DT36

UG2 pothole

1104

0.55

1.51

1.8

na

na

 

na not assayed/not applicable * deflections awaited ** factor applied to 3PGE+Au values to include ruthenium (Ru) and iridium (Ir) based on average of Ru and Ir analysis of four MR drill core and two UG2 drill core intersections selected.

Colin Bird, CEO of Jubilee and Tjate Project Manager said: "These new results continue to confirm the continuity at depth of the Merensky and UG2 reefs. The lower grades seen in some of the new borehole results correlate generally with a regional pothole within a lower grade area confined to the northwest of the farm Dsjate. The effect of this area will be considered in the options when delineating the resource and defining a resource estimate. The drilling programme for the second phase of the feasibility study was completed this month and the project is now rapidly advancing towards a definitive compliant mineral resource estimate." 

Note to Editors

The Tjate Project comprises three contiguous farms, totalling 5,143 hectares in the eastern Bushveld: Dsjate, Fernkloof and Quartz Hill. The farms are downdip of Impala Platinum's operating Marula platinum mine and of Anglo Platinum's developing Twickenham platinum mine. Jubilee is advancing the Project to feasibility study (FS).

SGS Lakefield Research Africa in Johannesburg carried out the analyses of the borehole core samples. This laboratory is SNAS TO169 accredited.

For further information please contact:

Colin Bird Nick Rome/Michael Kinirons

Jubilee Platinum plc Bishopsgate Communications Ltd 

Tel: +44 (0) 20 7584 2155 Tel +44 (0) 20 7562 3350

Gerard Kisbey-Green

Investec Bank plc

Tel +44 (0)20 7597 5000

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUWSWRKURUARR
Date   Source Headline
25th Mar 20087:01 amRNSShare Acquisition in NewPlats
13th Mar 20087:00 amRNSInterim Results
5th Mar 20087:00 amRNSDrilling Update - Madagascar
21st Feb 20087:00 amRNSAmbodilafa Drilling Update
16th Jan 20087:00 amRNSDrilling Update at Tjate
13th Dec 20077:00 amRNSMadagascar Drilling Update
27th Nov 20077:00 amRNSResult of AGM
22nd Nov 20077:01 amRNSMadagascar Drilling Update
19th Nov 20074:26 pmRNSCompletion of Placing
14th Nov 20079:00 amRNSMadagascar Drilling Update
14th Nov 20077:01 amRNSHolding(s) in Company
7th Nov 20077:01 amRNSPlacing of New Shares
6th Nov 20079:22 amRNSNotice of AGM & Final Results
11th Oct 20077:30 amRNSDrilling Update at Tjate
3rd Oct 20078:00 amRNSMadagascar Drilling Update
1st Oct 20072:42 pmRNSIssue of Shares-Replacement
28th Sep 20073:00 pmRNSIssue of Shares
20th Sep 20077:01 amRNSTjate - Optimisation Review
17th Sep 20077:01 amRNSFinal Results
17th Aug 20076:24 pmRNSAIM Rule 26 Compliance
6th Aug 20077:00 amRNSFunding for Ambodilafa
31st Jul 20079:00 amRNSDirector/PDMR Shareholding
19th Jul 20077:00 amRNSIncrease in Tjate Holding
22nd Jun 20077:01 amRNSIssue of Shares
13th Jun 20074:44 pmRNSIssue of Shares
7th Jun 20077:01 amRNSExercise of Options
6th Jun 20079:59 amRNSCompletion of Scoping Study
4th May 200712:00 pmRNSAdditional Listing
29th Mar 200712:07 pmRNSAdditional Listing
26th Mar 20077:01 amRNSInterim Results
26th Feb 20078:00 amRNSNan Tin Agreement
23rd Feb 20078:00 amRNSHolding in Company
22nd Feb 20077:01 amRNSUpdate from Ambodilafa
5th Feb 20077:01 amRNSLavatrafo Update
22nd Dec 200612:24 pmRNSTotal Voting Rights
13th Dec 200612:01 pmRNSAgreement with Mitsubishi
12th Dec 20068:00 amRNSIncrease in Tjate Holding
6th Dec 20068:00 amRNSSecondary Listing on JSE
4th Dec 20061:38 pmRNSResult of AGM
1st Dec 20066:48 pmRNSHolding in Company
21st Nov 20069:20 amRNSDirector/PDMR Shareholding
20th Nov 20067:02 amRNSComment re. media article
3rd Nov 20067:01 amRNSFinal Results
24th Oct 20064:15 pmRNSSubscription of Shares
16th Oct 20068:56 amRNSJV with TransAsia Minerals
20th Sep 200612:35 pmRNSLavatrafo Project Update
15th Sep 200611:19 amRNSAmbodilafa Update
16th Aug 20065:05 pmRNSHolding(s) in Company
30th Jun 20069:29 amRNSGrant of Share Options
23rd May 20067:02 amRNSTjate Drill Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.