Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Tjate Drill Results

23 May 2006 07:02

Jubilee Platinum PLC23 May 2006 JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Borehole DT6 Intersects High-Grade Merensky Reef on the Tjate Project Jubilee announces excellent results for its borehole DT6 on the Dsjate farm ("Tjate Project") in the Bushveld Complex of South Africa. The borehole wassignificantly stepped out along strike some 500m south of previous borehole DT5and approximately midway 500 metres up and downdip of boreholes DT3 and DT2respectively. Drilling has commenced on Borehole DT7 which is positioned andstepped out updip of the most westerly boreholes DT2 and DT4. Highlights • The borehole intersected Merensky reef at the depth of 812m with higher than average platinum group metal plus gold grade over higher than average reef thickness • The reef showed a weighted average (motherhole plus two deflections) grade of 11.24g/t 4E (platinum, palladium, rhodium and gold) over 1.3m reef thickness • The motherhole showed a maximum grade of 13.32g/t 4E over a 1.0m reef thickness • Continuity of reef dip and extension of reef horizon confirmed • Valuable average nickel and copper values of 0.39% nickel and 0.24% copper • Scoping study near completion The results for borehole DT6, which intersected the Merensky reef at 812m, areshown in table 1 below: Table 1 DT6 Results for Merensky Reef Intercepts Apparent 4E Pt Pd Rh Au Ni Cu Pt:Pd thickness g/t g/t g/t g/t g/t % % ratio (cm)Motherhole 100 13.32 7.72 4.30 0.34 0.95 0.47 0.35 1.8Deflection1 183 11.47 6.27 3.78 0.27 1.15 0.40 0.35 1.7Deflection 2 120 9.15 5.20 2.82 0.19 0.95 0.30 0.17 1.8Weighted average 134 11.24 6.31 3.62 0.27 1.04 0.39 0.24 1.7 Colin Bird, CEO of Jubilee and Tjate Project Manager, said: "These latestresults confirm reef dip and the grades are excellent. We are pleased with ourability now to predict Merensky reef extension and continuity with confidenceand have commenced drilling our seventh borehole stepped out to the east. Workcontinues apace and our scoping study is near completion." The Dsjate farm is one of three contiguous farms in the Tjate project, whichcomprises a total 5,143 hectares with an inferred resource of 282 milliontonnes containing 66 million ounces 5 PGE (platinum group elements: platinum,palladium, rhodium, iridium and ruthenium) and gold, of which 22.8 millionounces are attributable to Jubilee. Jubilee has a 25% stake in Tjate, with and is currently earring in a further 10%interest by expending ZAR14 million towards a bankable feasibility study. SGS Lakefield Research Africa in Johannesburg carried out the analyses of theborehole core samples. This laboratory is SNAS TO169 accredited. For further information please contact: Colin Bird Justine Howarth / Annabel LeatherJubilee Platinum plc Parkgreen Communications LtdTel: +44 (0)20 7584 2155 Tel +44 (0)20 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
29th May 20267:00 amRNSNotice of General Meeting
28th May 20262:10 pmRNSStrategic Investment to Support Copper Growth
6th May 20267:00 amRNSOperational and Production Update 9m FY2026
29th Apr 20267:00 amRNSCapital Reduction Court Approval
20th Apr 20264:05 pmRNSHolding(s) in Company
8th Apr 20262:57 pmRNSResults of GM & Proposed Capital Reduction
31st Mar 20267:01 amRNSImplementation of Mine Plan at Molefe
31st Mar 20267:00 amRNSFinancial report for 6 months to end-December 2025
25th Mar 20267:05 amRNSMolefe Mine Phase 1 Drilling Results
24th Mar 20267:00 amRNSMolefe Mine Phase 1 Drilling Results delayed
23rd Mar 202610:05 amRNSReduction of Share Premium Account & Notice of GM
23rd Mar 20267:00 amRNSReduction of Share Premium Account & Notice of GM
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
27th Feb 20267:00 amRNSShareholder update and Dealing in securities
19th Feb 20267:00 amRNSOperational and Projects update H1 FY2026
23rd Jan 20267:00 amRNSChanges to the Board
14th Jan 20262:19 pmRNSResults of Annual General Meeting
6th Jan 20267:00 amRNSReceipt of US$10 million in funds from SA sale
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
17th Dec 20257:00 amRNSAudited Results for FY2025 & Notice of AGM
28th Nov 20257:00 amRNSMolefe Mine Co-Operation and Development Agreement
21st Nov 20257:00 amRNSOperational Update Zambia Q1 FY2026
17th Nov 20257:00 amRNSCompetition Tribunal Approval
17th Oct 20257:00 amRNSOperational Update South Africa Q1 FY2026
6th Oct 20256:06 pmRNSTR-1: notification of major holdings
6th Oct 20257:00 amRNSZambia Copper Strategy and SA Disposal Update
8th Sep 20257:00 amRNSDealing in securities
28th Aug 20252:05 pmRNSResults of General Meeting
12th Aug 20257:00 amRNSPosting of Circular & Notice of General Meeting
6th Aug 20257:00 amRNSZambia Copper and SA Business Proposed Sale Update
21st Jul 20257:00 amRNSQ4 Operational Update - South Africa
10th Jul 20257:00 amRNSChange of Broker and Proposed Disposal Update
19th Jun 20257:00 amRNSDirectorate Change
5th Jun 20257:00 amRNSProposed Disposal of Chrome and PGM Operations
28th May 20257:02 amRNSZambia Projects Update & Issue of equity
30th Apr 20257:40 amRNSZambia Progress Update
16th Apr 20257:00 amRNSOperational Update Q3 FY2025
14th Apr 20257:00 amRNSDirectorate Change
9th Apr 20257:00 amRNSTransaction on Surplus PGM Feed Material
3rd Apr 20257:00 amRNSJubilee Transaction on Large Waste Project
31st Mar 20257:00 amRNSInterim Financial Report 6 Months to December 2024
14th Feb 20257:00 amRNSRoan Commences High Grade Copper Production
6th Feb 20257:00 amRNSZambia Projects Update
21st Jan 20257:00 amRNSAdditional power supply secured for Roan re-start
13th Jan 20257:00 amRNSOperational Update H1 FY2025
24th Dec 20247:00 amRNSHolding(s) in Company
16th Dec 20247:00 amRNSZambia Operations Update and Exercise of Options
21st Nov 20247:00 amRNSTR-1: notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.