Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Ambodilafa Drilling Update

21 Feb 2008 07:00

Jubilee Platinum PLC21 February 2008 21 February 2008 AIM: JLPJSE: JBL JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Madagascar - Ambodilafa Drilling Update Borehole ALF008 Intersects Further Nickel-Copper Sulphide Mineralisation in Ambodilafa Jubilee is pleased to announce that borehole ALF008 has intersectednickel-copper sulphide mineralization on the Ambodilafa prospect at 101 metreswith higher grade intersections assaying 0.45% nickel (Ni) and 0.16% copper (Cu)over an intersected width of 13.9 metres from 243 metres down-hole, whichincludes 8.0 metres assaying 0.57% Ni and 0.20% Cu. Further significant sulphidemineralization was intersected at 260.6 metres downhole, which included 3.8metres assaying 0.67% Ni and 0.25% Cu. Sulphide mineralization mainly of adisseminated nature with lesser net textured and massive forms. Borehole ALF008 was collared in the western portions of the intrusion some 88metres northwest of and drilled through the vertical borehole ALF003, which aspreviously announced (22 February, 2007) intersected good nickel-copper sulphidemineralization. Highlights: • Borehole ALF008 intersected disseminated sulphide mineralization at101 metres down-hole, which is largely persistent to 303 metres down-hole andincludes wide intersected widths of up to 14 metres of mineralization • The intersections (cut-off grade 0.2% Ni) include: • 13.9 metres grading 0.45% Ni and 0.16% Cu (gross metal value ("GMV") US$138/t rock at current prices*) including 8.0 metres of 0.57% Ni and 0.20% Cu (GMV: US$175/t); • 7.6 metres of 0.47% Ni and 0.19%Cu (GMV: US146$/t) including 3.8 metres of 0.67% Ni and 0.25% Cu (GMV:US$207/t); and • 10.5 metres of 0.35% Ni and 0.16% Cu (GMV: US$110/t) *Prices US$/t: Ni 28 000; Cu 7 800 Selected mineralized intersections are summarised in the table below Table 1 Borehole ALF 008 Selected results Intersection From to Interval Ni Cu 3E m m m % % g/t Total 243.4 257.3 13.9 0.45 0.16 0.08 including 243.3 251.3 8.0 0.57 0.20 0.10 Total 260.6 268.2 7.6 0.47 0.19 0.09 including 261.5 265.3 3.8 0.67 0.25 0.11 Total 275.9 279.1 3.2 0.42 0.18 0.08Total 281.3 290.8 10.5 0.35 0.16 0.06 including 285.9 287.3 1.4 0.44 0.19 0.07 Total 298.2 303.3 5.1 0.35 0.16 0.09 3E: platinum, palladium and gold Colin Bird, CEO of Jubilee commented, "This is another good borehole result fromthe base-metal sulphide mineralized area on the western margin of theprospective Ambodilafa property. Our 2008 programme, which will include asignificant amount of drilling, is planning to focus aggressively on this areaas well as on the platinum discovery some 2000 metres to the east of boreholeALF008 that was previously announced on 13 December 2007". Borehole ALF008Location: 207017.568E 77366.27.395STotal Depth 347.47 mAzimuth 135degrees, dip -60degrees The mineralization is hosted in a medium to coarse-grained pyroxenite and occursas disseminated to net-textured Ni and Cu sulphides. Disseminated sulphides wereintersected from 101 metres, and although not continuous, are generallypersistent to a depth of 347.5 metres (end of hole). ALF008 represents part of a3-hole fence some 197 metres long along a NW direction, which targets part of aCu-Ni-Cr soil anomaly associated with the southern part of the Ambodilafaultramafic-mafic intrusion. Assay results from ALF009 are not yet available. About Ambodilafa The Ambodilafa project lies within the extensive Vohipaha ultramafic-maficintrusive, itself some 4 kilometres wide by 17 kilometres long. The Ambodilafalicence of property is located 160 kilometres southeast of the Madagascancapital Antananarivo. The 10-year exploration licence is held by MineralResources of Madagascar Sarl, 100% owned by Jubilee. Impala Platinum Holdingshave an option agreement with Jubilee to earn in a 51% interest in the project. Set Point Laboratories (ISO 17025 and SANAS Accredited) in Johannesburg, SouthAfrica, carried out the analyses of the borehole samples. Quality control andassurance currently in place comprises standards, blanks and check samplesmaking between 10% and 20% of samples submitted. For further information please contact: Colin Bird Louise GoodeveJubilee Platinum plc Parkgreen Communications LtdTel: +44 7768 397 627 Tel +44 20 7851 7480 Jan Bosch/Paul BrettInvestec Bank (UK) LimitedTel + 44 (0) 20 7597 5000 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
29th May 20267:00 amRNSNotice of General Meeting
28th May 20262:10 pmRNSStrategic Investment to Support Copper Growth
6th May 20267:00 amRNSOperational and Production Update 9m FY2026
29th Apr 20267:00 amRNSCapital Reduction Court Approval
20th Apr 20264:05 pmRNSHolding(s) in Company
8th Apr 20262:57 pmRNSResults of GM & Proposed Capital Reduction
31st Mar 20267:01 amRNSImplementation of Mine Plan at Molefe
31st Mar 20267:00 amRNSFinancial report for 6 months to end-December 2025
25th Mar 20267:05 amRNSMolefe Mine Phase 1 Drilling Results
24th Mar 20267:00 amRNSMolefe Mine Phase 1 Drilling Results delayed
23rd Mar 202610:05 amRNSReduction of Share Premium Account & Notice of GM
23rd Mar 20267:00 amRNSReduction of Share Premium Account & Notice of GM
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
27th Feb 20267:00 amRNSShareholder update and Dealing in securities
19th Feb 20267:00 amRNSOperational and Projects update H1 FY2026
23rd Jan 20267:00 amRNSChanges to the Board
14th Jan 20262:19 pmRNSResults of Annual General Meeting
6th Jan 20267:00 amRNSReceipt of US$10 million in funds from SA sale
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
17th Dec 20257:00 amRNSAudited Results for FY2025 & Notice of AGM
28th Nov 20257:00 amRNSMolefe Mine Co-Operation and Development Agreement
21st Nov 20257:00 amRNSOperational Update Zambia Q1 FY2026
17th Nov 20257:00 amRNSCompetition Tribunal Approval
17th Oct 20257:00 amRNSOperational Update South Africa Q1 FY2026
6th Oct 20256:06 pmRNSTR-1: notification of major holdings
6th Oct 20257:00 amRNSZambia Copper Strategy and SA Disposal Update
8th Sep 20257:00 amRNSDealing in securities
28th Aug 20252:05 pmRNSResults of General Meeting
12th Aug 20257:00 amRNSPosting of Circular & Notice of General Meeting
6th Aug 20257:00 amRNSZambia Copper and SA Business Proposed Sale Update
21st Jul 20257:00 amRNSQ4 Operational Update - South Africa
10th Jul 20257:00 amRNSChange of Broker and Proposed Disposal Update
19th Jun 20257:00 amRNSDirectorate Change
5th Jun 20257:00 amRNSProposed Disposal of Chrome and PGM Operations
28th May 20257:02 amRNSZambia Projects Update & Issue of equity
30th Apr 20257:40 amRNSZambia Progress Update
16th Apr 20257:00 amRNSOperational Update Q3 FY2025
14th Apr 20257:00 amRNSDirectorate Change
9th Apr 20257:00 amRNSTransaction on Surplus PGM Feed Material
3rd Apr 20257:00 amRNSJubilee Transaction on Large Waste Project
31st Mar 20257:00 amRNSInterim Financial Report 6 Months to December 2024
14th Feb 20257:00 amRNSRoan Commences High Grade Copper Production
6th Feb 20257:00 amRNSZambia Projects Update
21st Jan 20257:00 amRNSAdditional power supply secured for Roan re-start
13th Jan 20257:00 amRNSOperational Update H1 FY2025
24th Dec 20247:00 amRNSHolding(s) in Company
16th Dec 20247:00 amRNSZambia Operations Update and Exercise of Options
21st Nov 20247:00 amRNSTR-1: notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.