Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Ambodilafa Drilling Update

21 Feb 2008 07:00

Jubilee Platinum PLC21 February 2008 21 February 2008 AIM: JLPJSE: JBL JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Madagascar - Ambodilafa Drilling Update Borehole ALF008 Intersects Further Nickel-Copper Sulphide Mineralisation in Ambodilafa Jubilee is pleased to announce that borehole ALF008 has intersectednickel-copper sulphide mineralization on the Ambodilafa prospect at 101 metreswith higher grade intersections assaying 0.45% nickel (Ni) and 0.16% copper (Cu)over an intersected width of 13.9 metres from 243 metres down-hole, whichincludes 8.0 metres assaying 0.57% Ni and 0.20% Cu. Further significant sulphidemineralization was intersected at 260.6 metres downhole, which included 3.8metres assaying 0.67% Ni and 0.25% Cu. Sulphide mineralization mainly of adisseminated nature with lesser net textured and massive forms. Borehole ALF008 was collared in the western portions of the intrusion some 88metres northwest of and drilled through the vertical borehole ALF003, which aspreviously announced (22 February, 2007) intersected good nickel-copper sulphidemineralization. Highlights: • Borehole ALF008 intersected disseminated sulphide mineralization at101 metres down-hole, which is largely persistent to 303 metres down-hole andincludes wide intersected widths of up to 14 metres of mineralization • The intersections (cut-off grade 0.2% Ni) include: • 13.9 metres grading 0.45% Ni and 0.16% Cu (gross metal value ("GMV") US$138/t rock at current prices*) including 8.0 metres of 0.57% Ni and 0.20% Cu (GMV: US$175/t); • 7.6 metres of 0.47% Ni and 0.19%Cu (GMV: US146$/t) including 3.8 metres of 0.67% Ni and 0.25% Cu (GMV:US$207/t); and • 10.5 metres of 0.35% Ni and 0.16% Cu (GMV: US$110/t) *Prices US$/t: Ni 28 000; Cu 7 800 Selected mineralized intersections are summarised in the table below Table 1 Borehole ALF 008 Selected results Intersection From to Interval Ni Cu 3E m m m % % g/t Total 243.4 257.3 13.9 0.45 0.16 0.08 including 243.3 251.3 8.0 0.57 0.20 0.10 Total 260.6 268.2 7.6 0.47 0.19 0.09 including 261.5 265.3 3.8 0.67 0.25 0.11 Total 275.9 279.1 3.2 0.42 0.18 0.08Total 281.3 290.8 10.5 0.35 0.16 0.06 including 285.9 287.3 1.4 0.44 0.19 0.07 Total 298.2 303.3 5.1 0.35 0.16 0.09 3E: platinum, palladium and gold Colin Bird, CEO of Jubilee commented, "This is another good borehole result fromthe base-metal sulphide mineralized area on the western margin of theprospective Ambodilafa property. Our 2008 programme, which will include asignificant amount of drilling, is planning to focus aggressively on this areaas well as on the platinum discovery some 2000 metres to the east of boreholeALF008 that was previously announced on 13 December 2007". Borehole ALF008Location: 207017.568E 77366.27.395STotal Depth 347.47 mAzimuth 135degrees, dip -60degrees The mineralization is hosted in a medium to coarse-grained pyroxenite and occursas disseminated to net-textured Ni and Cu sulphides. Disseminated sulphides wereintersected from 101 metres, and although not continuous, are generallypersistent to a depth of 347.5 metres (end of hole). ALF008 represents part of a3-hole fence some 197 metres long along a NW direction, which targets part of aCu-Ni-Cr soil anomaly associated with the southern part of the Ambodilafaultramafic-mafic intrusion. Assay results from ALF009 are not yet available. About Ambodilafa The Ambodilafa project lies within the extensive Vohipaha ultramafic-maficintrusive, itself some 4 kilometres wide by 17 kilometres long. The Ambodilafalicence of property is located 160 kilometres southeast of the Madagascancapital Antananarivo. The 10-year exploration licence is held by MineralResources of Madagascar Sarl, 100% owned by Jubilee. Impala Platinum Holdingshave an option agreement with Jubilee to earn in a 51% interest in the project. Set Point Laboratories (ISO 17025 and SANAS Accredited) in Johannesburg, SouthAfrica, carried out the analyses of the borehole samples. Quality control andassurance currently in place comprises standards, blanks and check samplesmaking between 10% and 20% of samples submitted. For further information please contact: Colin Bird Louise GoodeveJubilee Platinum plc Parkgreen Communications LtdTel: +44 7768 397 627 Tel +44 20 7851 7480 Jan Bosch/Paul BrettInvestec Bank (UK) LimitedTel + 44 (0) 20 7597 5000 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
31st Jul 201711:52 amRNSPlatinum Projects Quarterly Update - Q2 2017
22nd Jun 20173:00 pmRNSDirector Dealing
15th Jun 20171:30 pmRNSHernic Project Reaches Full Production
19th May 201710:30 amRNSHernic Project Ramping-Up and Live Webcast
9th May 20179:00 amRNSMarket Update
30th Mar 20173:18 pmRNSInterim Results - replacement
30th Mar 201712:15 pmRNSInterim Results
29th Mar 20172:15 pmRNSJubilee commences platinum production
17th Mar 20177:00 amRNSExecution of Platinum Tailings Agreement
14th Mar 20171:15 pmRNSFinal proceeds from Middelburg and DCM update
9th Mar 20177:00 amRNSJubilee Executes Surface Tailings Transaction
6th Mar 20179:45 amRNSDCM Operations update and Exercise of warrants
2nd Mar 20178:30 amRNSTjate Executes Mining Right
21st Feb 20173:15 pmRNSExercise of last warrants at specific issue price
15th Feb 20173:31 pmRNSExercise of Last Warrants at Specific Issue Price
13th Feb 201711:45 amRNSExercise of Warrants
8th Feb 20178:45 amRNSExercise of Warrants
6th Feb 20172:45 pmRNSHernic Project in Production
3rd Feb 20179:30 amRNSExercise of Warrants
30th Jan 20179:00 amRNSHernic Tailings Project update
25th Jan 20172:00 pmRNSExercise of Warrants
17th Jan 20171:00 pmRNSUpdate notification and Exercise of Warrants
6th Dec 20161:31 pmRNSResults of AGM and Change of Registered Office
28th Nov 20161:15 pmRNSJubilee Live Interactive Webcast
14th Nov 20168:00 amRNSAudited results for the year ended 30 June 2016
11th Nov 20161:15 pmRNSExercise of Warrants & Dealing in Securities
9th Nov 201612:30 pmRNSBraemore Tailings Project
21st Oct 20168:45 amRNSPlatinum Projects quarterly update
15th Sep 20167:00 amRNSPlatinum Projects update
19th Aug 201612:00 pmRNSJubilee Live Interactive Webcast
18th Aug 20167:00 amRNSPlatinum Projects update
11th Jul 20168:00 amRNSPlatinum Projects Quarterly Update
7th Jun 201611:30 amRNSJubilee Processing Operational Update
27th May 201612:00 pmRNSExercise of Warrants
20th May 201612:30 pmRNSDealing in securities
12th May 20161:30 pmRNSJubilee Processing Operational Update
29th Apr 201612:30 pmRNSResults of General Meeting
28th Apr 201612:30 pmRNSTailings Projects Further Update
19th Apr 201611:00 amRNSTailings Projects Update
8th Apr 20167:00 amRNSNotice of General Meeting
31st Mar 20167:00 amRNSInterim Results
22nd Mar 20167:00 amRNSProject Funding for Surface Platinum Processing
14th Mar 201611:15 amRNSUpdate on Platinum Surface Processing Operations
1st Mar 20162:30 pmRNSExercise of Warrants
22nd Feb 20167:00 amRNSShareholder update
12th Jan 20167:00 amRNSJubilee Live Interactive Webcast
15th Dec 201510:30 amRNSFinal Agreement for Surface platinum project
8th Dec 20151:30 pmRNSCompletion of acquisition in DCM Platinum Project
2nd Dec 20153:30 pmRNSResults of Annual General Meeting
12th Nov 20152:00 pmRNSExercise of Warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.