The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Metals Regulatory News (EUZ)

Share Price Information for Europa Metals (EUZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.15
Bid: 1.10
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.10 (9.091%)
Open: 1.15
High: 1.15
Low: 1.15
Prev. Close: 1.15
EUZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Contract for Lead-Zinc Project, Spain

13 Apr 2017 07:00

RNS Number : 3895C
Ferrum Crescent Ltd
13 April 2017
 

13 April 2017

Ferrum Crescent Limited

("Ferrum Crescent", the "Company", "FCR" or the "Group")(ASX, AIM, JSE: FCR)

 

Drilling Contract Signed for Toral Lead-Zinc Project, Spain

Ferrum Crescent, the ASX, AIM and JSE quoted metals developer, is pleased to announce the signing of a drilling contract for its Toral lead-zinc project, Spain (the "Toral Project"). The planned drill programme will further test mineralisation down to a potential vertical depth of 150m from surface in a series of angled holes up to 250m long. Preparation of the drill sites is already underway and mobilisation of the rig to site is anticipated to occur this month.

Access to all of the drill platforms is via existing roads and tracks. The diamond drilling contract is for a minimum of 1,400m and a maximum of 2,100m and is expected to take up to three months to complete. The drill cost is EUR80 per metre.

The Company is now implementing its planned Phase 1 drill programme at the Toral Project designed to intersect mineralising features at a series of shallow targets which are untested to date. A two kilometre soil geochemistry anomaly at this depth will be targeted in three separate areas. Each of these three zones contains a variety of mineralising styles that will be tested down to depths of approximately 100m below surface. The refined programme has been designed with an expected nine firm hole locations, with an average hole length of 155m for a minimum total to be drilled of 1,400m. Five holes are planned for Zone 1, one 250m hole for Zone 2 (which crosses several separate targets) and three holes for Zone 3. The remaining 700m will be distributed on a discretionary basis during the drilling programme and may be used to test continuity at depths down to 150m below surface.

The drilling contractor for Phase 1, Sondeos y Perforaciones Industriales de Bierzo SA ("SPI"), is based near Toral and is a fully equipped manufacturer of rigs and ancilliary equipment, including drill bits. In 2007, SPI conducted the last known drill campaign at Toral, completing a programme of 4,524m. This included a final deep hole of 1,285m, proving the capability of SPI's rigs. As reported on 10 November 2016, during that historic 2007 programme conducted for Lundin Mining S.L., mineralisation was intersected at depths of c.712m below surface in hole TOR07001 (including a 0.5m interval grading at 13.95% Zn, 6.6% Pb) and c.927m below surface in hole TOR07006 (including a 0.9m interval at 3.4% Zn, 1.6% Pb), demonstrating that mineralisation exists at depth.

Work completed to date by Ferrum Crescent has recently identified mineralisation in multiple sub-vertical, sub-parallel planes and also mineralisation associated with crosscutting faults. In addition, several different styles of mineralisation have been identified, complementing data from the channel samples and soil geochemistry reported on 23 February 2017.

Commenting today Justin Tooth, Executive Chairman of Ferrum Crescent, said:

"We are pleased to be on the cusp of commencing FCR's first drilling campaign for lead-zinc in Spain. The drilling contractor is well-established locally and has previously drilled at Toral, which is a great advantage for this planned campaign. This shallow drilling programme at Toral is targeting new mineralisation at surface to add to the known lead-zinc intersections at depth. Our objective is to define the presence of lead-zinc near to surface similar to the nearby Antonina and Rubiales projects where mineralisation has been mined in the top 200m.

 

"The drill programme marks the start of a new phase of work following our extensive groundwork between November and March. The additional information that we gain from this drill campaign will be an important step in linking the known mineralisation at depth with mineralisation in the upper portions of the Toral hill. We would expect successful campaign results to lead to a Phase II drilling programme. Thereafter FCR would look to progress towards delineating a lead-zinc deposit in this politically stable region, as outlined in our strategic review some twelve months ago. I look forward to providing updates over the coming months."

 

For further information on the Company, please visit www.ferrumcrescent.com or contact:

 

Ferrum Crescent Limited

Justin Tooth, Executive Chairman

Grant Button, Director and Company Secretary T: +61 8 9474 2995

 

UK enquiries:

Laurence Read, Non-Executive Director (UK representative) T: +44 7557 672 432

 

Strand Hanson Limited (Nominated Adviser)

Rory Murphy/Matthew Chandler T: +44 (0)20 7409 3494

 

Beaufort Securities Limited (Broker)

Elliot Hance T: +44 (0)20 7382 8300

 

Bravura Capital (Pty) Ltd (JSE Sponsor)

Doné Hattingh T (direct): +27 11 459 5037

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFLLLFDZFFBBB
Date   Source Headline
8th Dec 20147:00 amRNSStudy Manager Appointment and Workstream Update
27th Nov 20147:00 amRNSResult of AGM
17th Nov 20147:00 amRNSSubstantial Shareholder Notice
17th Nov 20147:00 amRNSIssue of Shares and Change in Directors' Interests
10th Nov 20143:11 pmRNSIssue of Shares under Entitlements Offer
6th Nov 20147:00 amRNSResults of Entitlements Offer
28th Oct 20147:00 amRNSQuarterly Activities and Cashflow Report
23rd Oct 20147:00 amRNSNotice of AGM
23rd Oct 20147:00 amRNSMail-out of Entitlements Offer Booklet
14th Oct 20148:37 amRNSEntitlements Offer Booklet
10th Oct 20149:14 amRNSPlacing Notice in Compliance with ASX Listing
9th Oct 20149:50 amRNSRights Issue for funding of BFS
9th Oct 20148:30 amRNSASX Voluntary Suspension
7th Oct 20148:23 amRNSASX Trading Halt
1st Oct 20147:00 amRNSFinal Results
30th Jul 20147:00 amRNSQuarterly Activities and Cashflow Report
11th Jun 20147:00 amRNSIndependent US$33m Mineral Asset Valuation Report
11th Jun 20147:00 amRNSASX and JSE Trading Resumes
13th May 20147:00 amRNSChange of Registered Office
8th May 20147:00 amRNSAAI Second Payment Update
2nd May 201412:30 pmRNSThe Moonlight Project - BFS Updates
29th Apr 20148:13 amRNSUpdated Mineral Resource estimate
28th Apr 20147:00 amRNSQuarterly Activities and Cashflow Report
28th Mar 201412:00 pmRNSUS$500,000 First Payment Received from AAI
18th Mar 201410:00 amRNSFinal Investment Agreement Signed with AAI
13th Mar 20142:00 pmRNSHalf Yearly Report
19th Feb 20141:00 pmRNSManaging Director Appointed
19th Feb 20141:00 pmRNSAAI Staggered Payment Agreement
11th Feb 20147:00 amRNSQuarterly Activities and Cashflow Report (Amended)
31st Jan 20147:00 amRNSQuarterly Activities and Cashflow Report
15th Jan 20147:00 amRNSAnvwar Asian Investment ("AAI") Payment Schedule
8th Jan 20147:00 amRNSExpiry of Options
19th Dec 20137:00 amRNSIssue of Equity
29th Nov 201310:06 amRNSAGM Statement
29th Nov 20137:00 amRNSAAI Due Diligence Concluded
25th Nov 20131:39 pmRNSSubstantial Shareholder Notice
21st Nov 20137:00 amRNSIssue of Equity
31st Oct 20137:00 amRNSQuarterly Activities and Cashflow Report
29th Oct 20137:00 amRNSNotice of AGM
9th Oct 20138:03 amRNSIssue of Equity
9th Oct 20138:01 amRNSCleansing Notice
2nd Oct 20133:00 pmRNSReplacement-Private Placing
2nd Oct 20139:40 amRNSPrivate Placing
1st Oct 20137:00 amRNSFinal Results
26th Sep 20132:00 pmRNSHolding(s) in Company
23rd Sep 20134:43 pmRNSUS$13.5m Investment Agreement with Anvwar
13th Sep 20131:00 pmRNSHolding(s) in Company
6th Sep 20137:00 amRNSCancellation of Share Options
5th Sep 20137:00 amRNSStatement re Share Price Movement
30th Jul 20133:22 pmRNSQuarterly Activities and Cashflow Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.