Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Metals Regulatory News (EUZ)

Share Price Information for Europa Metals (EUZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.15
Bid: 1.10
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.10 (9.091%)
Open: 1.15
High: 1.15
Low: 1.15
Prev. Close: 1.15
EUZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Contract for Lead-Zinc Project, Spain

13 Apr 2017 07:00

RNS Number : 3895C
Ferrum Crescent Ltd
13 April 2017
 

13 April 2017

Ferrum Crescent Limited

("Ferrum Crescent", the "Company", "FCR" or the "Group")(ASX, AIM, JSE: FCR)

 

Drilling Contract Signed for Toral Lead-Zinc Project, Spain

Ferrum Crescent, the ASX, AIM and JSE quoted metals developer, is pleased to announce the signing of a drilling contract for its Toral lead-zinc project, Spain (the "Toral Project"). The planned drill programme will further test mineralisation down to a potential vertical depth of 150m from surface in a series of angled holes up to 250m long. Preparation of the drill sites is already underway and mobilisation of the rig to site is anticipated to occur this month.

Access to all of the drill platforms is via existing roads and tracks. The diamond drilling contract is for a minimum of 1,400m and a maximum of 2,100m and is expected to take up to three months to complete. The drill cost is EUR80 per metre.

The Company is now implementing its planned Phase 1 drill programme at the Toral Project designed to intersect mineralising features at a series of shallow targets which are untested to date. A two kilometre soil geochemistry anomaly at this depth will be targeted in three separate areas. Each of these three zones contains a variety of mineralising styles that will be tested down to depths of approximately 100m below surface. The refined programme has been designed with an expected nine firm hole locations, with an average hole length of 155m for a minimum total to be drilled of 1,400m. Five holes are planned for Zone 1, one 250m hole for Zone 2 (which crosses several separate targets) and three holes for Zone 3. The remaining 700m will be distributed on a discretionary basis during the drilling programme and may be used to test continuity at depths down to 150m below surface.

The drilling contractor for Phase 1, Sondeos y Perforaciones Industriales de Bierzo SA ("SPI"), is based near Toral and is a fully equipped manufacturer of rigs and ancilliary equipment, including drill bits. In 2007, SPI conducted the last known drill campaign at Toral, completing a programme of 4,524m. This included a final deep hole of 1,285m, proving the capability of SPI's rigs. As reported on 10 November 2016, during that historic 2007 programme conducted for Lundin Mining S.L., mineralisation was intersected at depths of c.712m below surface in hole TOR07001 (including a 0.5m interval grading at 13.95% Zn, 6.6% Pb) and c.927m below surface in hole TOR07006 (including a 0.9m interval at 3.4% Zn, 1.6% Pb), demonstrating that mineralisation exists at depth.

Work completed to date by Ferrum Crescent has recently identified mineralisation in multiple sub-vertical, sub-parallel planes and also mineralisation associated with crosscutting faults. In addition, several different styles of mineralisation have been identified, complementing data from the channel samples and soil geochemistry reported on 23 February 2017.

Commenting today Justin Tooth, Executive Chairman of Ferrum Crescent, said:

"We are pleased to be on the cusp of commencing FCR's first drilling campaign for lead-zinc in Spain. The drilling contractor is well-established locally and has previously drilled at Toral, which is a great advantage for this planned campaign. This shallow drilling programme at Toral is targeting new mineralisation at surface to add to the known lead-zinc intersections at depth. Our objective is to define the presence of lead-zinc near to surface similar to the nearby Antonina and Rubiales projects where mineralisation has been mined in the top 200m.

 

"The drill programme marks the start of a new phase of work following our extensive groundwork between November and March. The additional information that we gain from this drill campaign will be an important step in linking the known mineralisation at depth with mineralisation in the upper portions of the Toral hill. We would expect successful campaign results to lead to a Phase II drilling programme. Thereafter FCR would look to progress towards delineating a lead-zinc deposit in this politically stable region, as outlined in our strategic review some twelve months ago. I look forward to providing updates over the coming months."

 

For further information on the Company, please visit www.ferrumcrescent.com or contact:

 

Ferrum Crescent Limited

Justin Tooth, Executive Chairman

Grant Button, Director and Company Secretary T: +61 8 9474 2995

 

UK enquiries:

Laurence Read, Non-Executive Director (UK representative) T: +44 7557 672 432

 

Strand Hanson Limited (Nominated Adviser)

Rory Murphy/Matthew Chandler T: +44 (0)20 7409 3494

 

Beaufort Securities Limited (Broker)

Elliot Hance T: +44 (0)20 7382 8300

 

Bravura Capital (Pty) Ltd (JSE Sponsor)

Doné Hattingh T (direct): +27 11 459 5037

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFLLLFDZFFBBB
Date   Source Headline
30th Apr 20137:00 amRNSQuarterly Activities and Cashflow Report
3rd Apr 201312:30 pmRNSDirector/PDMR Shareholding
12th Mar 201312:00 pmRNSHalf Yearly Report
27th Feb 20137:00 amRNSProcess Engineering Agreement Signed With Danieli
8th Feb 20137:00 amRNSInfrastructure & Beneficiation Route Presentation
31st Jan 20139:00 amRNSQuarterly Activities and Cashflow Report
19th Dec 20128:01 amRNSDirector/PDMR Shareholding
19th Dec 20127:00 amRNSOperational Summary 2012
14th Dec 20127:00 amRNSIssue of Equity
30th Nov 20128:30 amRNSAGM Statement
27th Nov 20127:00 amRNSIssue of Equity
31st Oct 20127:00 amRNSQuarterly Activities and cash flow report
30th Oct 20127:00 amRNSNotice of AGM and Explanatory Memorandum
27th Sep 20127:00 amRNSFinal Results
26th Sep 20127:00 amRNSAeromagnetic Survey
16th Aug 20127:00 amRNSSubstantial shareholder notice
13th Aug 20127:00 amRNSSubstantial shareholder notice
8th Aug 20127:00 amRNSResults of General Meeting
2nd Aug 201210:00 amRNSSubstantial Shareholder Notice
30th Jul 20127:00 amRNSQuarterly Activities and Appendix 5B
20th Jul 20127:00 amRNSCancellation of Options
11th Jul 20127:00 amRNSMoonlight Iron Ore Project - Exploration Update
6th Jul 20127:00 amRNSNotice of General Meeting & Explanatory Memorandum
20th Jun 20129:00 amRNSReceipt of ASX Waiver
6th Jun 20127:00 amRNSMoonlight Iron Ore Project Mining Right Granted
16th May 20127:00 amRNSCompletion of JORC Compliant Resource Estimate
30th Apr 20127:00 amRNSQuarterly activities and cashflow report
30th Apr 20127:00 amRNSAppendix 5B
15th Mar 20128:30 amRNSInterim Results
24th Feb 20127:00 amRNSIssue of Shares
31st Jan 20127:00 amRNSQuarterly Activities and Cashflow Report
13th Jan 20127:00 amRNSAmendment to Constitution of the Company
15th Dec 20117:00 amRNSMoonlight Iron Ore Project Update, South Africa
7th Dec 20118:54 amRNSAmendment to Annual Report
25th Nov 201112:00 pmRNSResult of AGM
11th Nov 20117:00 amRNSListing on the Johannesburg Stock Exchange
10th Nov 201110:23 amRNSDirector/PDMR Shareholding
7th Nov 20113:20 pmRNSDirector/PDMR Shareholding
4th Nov 201110:47 amRNSAdmission to Johannesburg Stock Exchange
4th Nov 201110:12 amRNSAppointment of Finance Director
31st Oct 20117:00 amRNSQuarterly Activities and Cashflow Report
25th Oct 201110:33 amRNSNotice of AGM and Explanatory Memorandum
8th Sep 201112:30 pmRNSFinal Results
18th Aug 20117:00 amRNSTotal Voting Rights
29th Jul 20117:00 amRNSQuarterly Activities and Cashflow Report
13th Jul 20117:00 amRNSAppointment of Managing Director
28th Jun 20117:00 amRNSAssayed Drilling Results at Moonlight Iron Ore
22nd Jun 20117:00 amRNSOfftake Agreement - Duferco SA
20th May 20117:00 amRNSResignation of Company Secretary
20th May 20117:00 amRNSPresentation on website

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.