Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

Share Price is delayed by 15 minutes
Get Live Data
2.40    -0.20 (-7.69%)
Bid:
2.30
Ask:
2.50
Spread: 0.20 (8.696%)
Market Cap: £70.83m
EUA Live PriceLast checked at - London Stock Exchange

Intraday Eurasia Mining Share Chart

West Kytlim Mining Update

24 Sep 2018 07:00

RNS Number : 6190B
Eurasia Mining PLC
24 September 2018
 

RNS Announcement: The information communicated in this announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

 

Eurasia Mining plc (AIM: EUA)

("Eurasia" or the "Company")

West Kytlim Mining update Sept 2018

 

Eurasia Mining, the PGM and gold production company, here provides a further update from its West Kytlim Mine, the second largest alluvial platinum mine in the world (after Konder in Russia) which the company brought to industrial scale production in May of this year. The mine continues to exceed Directors' expectations in terms of daily production targets and run of mine grades. Shipments of the mine product, a raw platinum concentrate, to the Ekaterinburg precious metals refinery are ongoing, commensurate with payments from sale of Platinum, Palladium, Rhodium, Iridium and Gold.

Eurasia's subsidiary Kosvinsky Kamen, and the mine's contractor Techstroy, have also jointly decided to progress with the much larger Kluchiki open pit, 2 kilometres to the south west of Malaya Sosnovka open pit. Forestry clearing began at Kluchiki in July 2018. Machinery and equipment were deployed to the site in August 2018, with full production following directly.

Overview:

· Total production now stands at 141.5 kg (4,549 ounces total raw platinum from 3 May to 19 September 2018).

· Monthly production averaging greater than 30kg raw platinum.

· Mining ongoing at Kluchki open pit, with current state approved reserves of 893,000m3 of platinum and gold bearing gravels.

· The nature of platinum bearing gravels, sedimentary units, clay and boulder content and the general mining scheme are largely similar at Kluchiki Open Pit.

· Grades continuing to exceed reserve grades by a considerable margin. Total average grade from production to date circa 1g/m3 raw platinum.

 

Christian Schaffalitzky, company Chairman has highlighted: "We are pleased to provide some further details on the production performance at our West Kytlim Mine, which we believe has been a great success story this year. We are clearly well ahead of our internal target revenue for the year, and with two months of production remaining in the season. Commencing work early on at Kluchiki open pit means we believe we are in an excellent position to ramp up to full scale production in 2019. Our contractor Techstroy in cooperation with our own direct staff at site have operated an efficient and safe worksite throughout the year.

The mining license application at the Monchetundra Project has now reached the very final stage, and we now look to a successful conclusion to the mine permit application. No administrative or technical issues have been highlighted to the Company".

 

Kluchiki open pit - further details

Kluchiki open pit occurs within a few kilometres of Malaya Sosnovka open pit, downstream in the Tylai river system and within the West Kytlim mining license awarded to Eurasia's subsidiary Kosvinsky Kamen, and which is valid until 2040. Reserves and resources were identified in the area and achieved state approvals as part of the feasibility study approved in early 2014 (see RNS dated 22 April 2014). As per the 2014 feasibility study and reserves report a total of 319kg raw platinum has been identified at Kluchiki.

Further infill drilling was undertaken at Kluchiki in 2017 and 2018 as part of a broader and continuing reserves drilling program at Kluchiki and also Bolshaya Sosnovka, an area targeted for development after Kluchiki. A report on the drilling program will follow shortly.

Russian standard C1 and C2 Reserves were recalculated for the Kluchiki Area following the 2018 drilling program. In accordance with the applicable laws and regulations complete reserves statement will be provided on receipt of confirmation of the reserves from the subsoil agency.

A further video blog is in process at Kluchiki site for release in the week following this announcement.

Our shareholders are again directed to the company's media outlets where coverage of the mine operation is ongoing. This includes: twitter.com/eurasiamining and the company's Vimeo channel at https://vimeo.com/user71951711

Enquiries:

 

Eurasia Mining Plc

Christian Schaffalitzky

+44 (0)207 932 0418

 

First Equity Limited (Joint Broker)

Jason Robertson

Tel: +44 (0)20 7374 2212

 

Optiva Securities (Joint Broker)

Christian Dennis

Tel: +44 (0) 20 3137 1902

 

WH Ireland Limited (Nomad and Joint Broker)

Katy Mitchell / James Sinclair-Ford

+44 (0)161 832 2174

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLLLFIDALILFIT
Date   Source Headline
30th Jun 201011:42 amRNSResult of AGM
30th Jun 20109:15 amRNSTotal Voting Rights
17th Jun 20104:57 pmRNSIssue of Equity
16th Jun 20101:03 pmRNSExploration Update
7th Jun 201010:38 amRNSFinal Results
30th Apr 201012:07 pmRNSTotal Voting Rights
22nd Apr 20101:12 pmRNSIssue of Equity
15th Apr 201012:00 pmRNSExploration Update - West Kytlim
7th Apr 201010:00 amRNSExploration Update - Kola
2nd Mar 20103:28 pmRNSIssue of Equity
9th Feb 20107:57 amRNSHolding(s) in Company
3rd Feb 20104:54 pmRNSIssue of Equity
18th Dec 20091:09 pmRNSIssue of Equity
25th Nov 200910:48 amRNSHolding(s) in Company
5th Nov 20093:48 pmRNSIssue of Equity
30th Oct 200911:25 amRNSTotal Voting Rights
7th Oct 20093:15 pmRNSIssue of Equity
30th Sep 20097:00 amRNSTotal Voting Rights
28th Sep 20097:00 amRNSInterim results
14th Sep 200910:00 amRNSIssue of Equity
3rd Sep 200912:07 pmRNSIssue of Equity
28th Aug 20097:00 amRNSIssue of Equity
26th Aug 20094:21 pmRNSIssue of Equity
30th Jul 200910:31 amRNSTotal Voting Rights
23rd Jul 200912:58 pmRNSResult of AGM
14th Jul 20093:40 pmRNSHolding(s) in Company
14th Jul 20093:15 pmRNSIssue of Equity
29th Jun 20094:26 pmRNSResult of General Meeting
29th Jun 20091:34 pmRNSFinal Results
16th Jun 20094:18 pmRNSWarrant Update
12th Jun 20092:40 pmRNSIssue of Equity
10th Jun 20094:09 pmRNSNotice of EGM
6th May 20095:06 pmRNSHolding(s) in Company
1st Apr 20097:00 amRNSDrilling Report
31st Oct 200812:33 pmRNSHolding(s) in Company
31st Oct 20087:00 amRNSTotal Voting Rights
15th Oct 20087:00 amRNSDirector/PDMR Shareholding
10th Oct 20083:01 pmRNSIssue of Equity
8th Oct 200811:06 amRNSExtension to Licence
20th Aug 20084:31 pmRNSHolding(s) in Company
19th Aug 20085:19 pmRNSHolding(s) in Company
13th Aug 200810:53 amRNSHolding(s) in Company
23rd Jul 200811:36 amRNSResult of AGM
9th Jul 200812:51 pmRNSDirector/PDMR Shareholding
25th Jun 20087:00 amRNSFinal Results
17th Jun 20087:00 amRNSDirectorate Change
28th May 20087:00 amRNSConvertible loan note agreeme
3rd Apr 20087:01 amRNSDrilling Report
31st Mar 20083:11 pmRNSExtension of Loan Notes
30th Nov 200711:09 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.