The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.45
Bid: 1.40
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.10 (7.143%)
Open: 1.45
High: 1.45
Low: 1.40
Prev. Close: 1.45
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Update - Kola

7 Apr 2010 10:00

RNS Number : 8099J
Eurasia Mining PLC
07 April 2010
 



Eurasia Mining plc

("Eurasia" or the "Company")

 

Exploration Update - Kola

 

Eurasia is pleased to announce the results of its 2009 drilling and exploration programme, comprising a comprehensive analysis and interpretation of its Monchetundra (36.2km2) and Volchetundra (210km2) platinum group metals (PGM) projects, located on the Kola Peninsula in north-west Russia. Both licences are held in Joint Venture with Anglo Platinum as a 40% shareholder.

 

The Licence areas are adjacent to the town of Monchegorsk with excellent access and infrastructure.

 

The projects are on the same geological belt as Fedorova Tundra, (Barrick Gold) and the East Pansky deposits. The Fedorova Deposit is a large, near surface, low grade, bulk minable PGM deposit located near the basal contact of an ultramafic intrusive complex. Exploration at East Pansky has identified a deeper, higher grade, underground mineable PGM occurrence. Eurasia is incorporating both these deposit models as a conceptual targeting mechanism to refine exploration efforts on its licences.

 

Monchetundra

 

To date, 16,121m of drilling have been completed on the licence, with most of the intersections from the last phases of drilling having been previously announced in early 2009 as a table of results, without accompanying geological comment. Subsequent work during 2009 focused on an interpreted ore structure in the Loipishnyun sub-area, stemming from recent drilling, but also included several previously unreported intersections.

 

PGM mineralisation occurs within two NNW striking lodes, the northernmost lode is cut by a 50m wide tectonic zone and is interpreted to occur as parallel bodies. To the south, mineralisation is interpreted to only occur as a single elongated body. Intersections within Lode 1 are tabulated in the Table below:

 

MONCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

 

WESTERN OREBODY LODE L1

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ÌÒ-39

7528902.04

489759.09

42 o

-60o

96.1

7.3

1.1

ÌÒ-71

7528823.33

489685.44

42 o

-60o

219.1

3.9

1.85

ÌÒ-11

7529037.20

489742.72

42 o

-60o

19.1

6.9

2.42

ÌÒ-38*

7528541.35

 489954.62

42 o

-65 o

131.7

15

3.58

ÌÒ-70

7528957.96

489661.92

42 o

-60 o

229.3

4.2

1.51

ÌÒ-68

7529048.08

489624.13

42 o

-60 o

117

13.8

1.98

ÌÒ-69

7529005.33

489584.06

42 o

-60 o

243

6.3

2.47

ÞÌ-7

7529166.50

489586.78

42 o

-65 o

83

6.7

1.8

 including

112.7

15.3

2.2

ÌÒ-72

7529112.99

489535.83

42 o

-65 o

254.7

10.05

2.37

ÌÒ-73

7529212.11

489498.10

42 o

-60 o

141.9

7.8

1.79

* Denotes previously unreported Intersection

 

 

MONCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

 

EASTERN OREBODY LODE L1

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ÌÒ-11

7529037.20

489742.72

42 o

-60 o

53.6

15.6

1.9

ÌÒ-38*

7528541.35

 489954.62

42 o

-65 o

163.4

3.5

1.33

ÌÒ-70*

7528957.96

489661.92

42 o

-60 o

258.75

0.75

1.43

ÌÒ-68*

7529048.08

489624.13

42 o

-60 o

134

1

2.04

ÌÒ-69

7529005.33

489584.06

42 o

-60 o

243

24.9

1.35

 including*

254.1

9.7

1.28

ÞÌ-7

7529166.50

489586.78

42 o

-65 o

112.7

15.3

2.2

ÌÒ-72

7529112.99

489535.83

42 o

-65 o

272.3

8.8

2.63

ÌÒ-73

7529212.11

489498.10

42 o

-60 o

276.4

1.3

3.18

ÌÒ-74

7529260.04

489542.87

42 o

-60 o

123.6

13.4

2.33

 including*

123.6

7.1

3.49

SOUTHERN BLOCK LODE L1

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ÌÒ-18

7528542.67

489959.08

42 o

-60 o

24.9

10.7

1.37

ÌÒ-55

7528473.74

489900.32

42 o

-60 o

133.7

2.35

1.1

ÌÒ-6

7528660.87

489921.06

42 o

-65 o

43.7

18

1.67

ÌÒ-60

7528726.47

489861.69

42 o

-60 o

71.9

9.1

1.07

ÌÒ-65

7528684.25

489822.98

42 o

-60 o

134.25

2.05

1.77

ÌÒ-66

7528619.72

489779.79

42 o

-60 o

207.35

1.95

1.41

* Denotes previously unreported Intersection

 

The average Pd:Pt ratio for Monchetundra is 2.36:1.

 

The strike length drilled to date for Lode 1 is 400 and 350m for the Northern and Southern sections, respectively. The lodes extend from the surface and have currently been drill tested to a vertical depth of approximately 200m. The more southern Lode 2 is located close to the eastern boundary of the licence; the drilled strike length to date is approximately 420m. Intersections within Lode 2 are tabulated in the Table below:

 

MONCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

 

LODE L2

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ÌÒ-13

7528493.29

490581.95

42 o

-60 o

121.6

7.65

1.48

ÌÒ-14

7528464.65

490555.37

42 o

-60 o

163.5

11.3

2.93

ÞÌ-9

7528631.50

490461.91

42 o

-65 o

46.6

21.3

1.92

ÌÒ-12

 7528598.30

490430.63

42 o

-65 o

121

21.1

1.01

 

In parallel with this interpretation, work is continuing on identifying additional PGM occurrences resulting in the identification of a new target ready for drill testing, scheduled to commence in 2Q10.

 

With inclusion of work planned for 2010 we believe exploration on the Monchetundra Licence will advance the project to the stage that will support an application for a licence time extension, with the objective of eventually converting the exploration licence to a production licence. Further updates on this work, including a resource update, will be provided as soon as they become available.

 

Volchetundra

To date, 12,192m of drilling have been completed on the Volchetundra Licence. The focus has been on two areas of mineralized contact, Olche and Yukspor, located approximately 3.5km apart. Recent drilling tested 2.6km strike length at the more northern Olche prospect, whilst only 2km of strike-length was drill-tested at Yukspor. The total strike length of prospective contact zone within the licence area is interpreted to exceed 40kms.

 

All intersections at Olche and Yukspor, other than those deemed to be immaterial by the Company's Competent Person, are tabulated in the Table below. They include a number of wide, low grade values near contact intersections, which provide the best indication to date of the potential for near surface bulk mineable ore zones on the licence area. Narrow deep intersections include:

 

VOLCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

 

OLCHE AREA

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

23

7568703.29

473686.94

262 o

-65 o

24.5

23.9

1.17

17

7568721.16

473733.64

262 o

-65 o

68.4

44.6

1.76

144.9

18.5

1.9

including

144.9

4.4

3.59

including

156.1

7.3

2.55

170.2

2

5.86

27

7568118.01

473774.93

262 o

-65 o

1

16.6

0.72

25.9

33.1

1.36

including

25.9

3.1

0.83

including

31.3

27.7

1.6

62.9

3

0.94

59

7568086.52

473609.98

82 o

-60 o

30.6

24

1.31

69

7567706.83

473787.79

262 o

-60 o

89.9

2.5

1.83

106.8

5.2

1.49

66

7567724.31

473894.94

262 o

-60 o

230.9

7.8

5.48

62

7567338.76

474041.70

262 o

-60 o

140.6

16.8

1.34

YUKSPOR AREA

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

36*

7565511.96

474601.03

262 o

-60 o

196.1

1.2

3.68

40

7565397.14

474624.06

264 o

-65 o

217.4

3.2

5.22

219.6

1

14.27

47*

7564062.73

474888.41

262 o

-60 o

60

2

2.22

79

1

3.4

53*

7564892.98

474554.58

-90 o

29.5

1.3

3.38

* Denotes previously unreported Intersection

 

 

The average Pd:Pt ratio for Volchetundra is 2.93:1.

 

As with Monchetundra, work has advanced to the stage for carrying out detailed exploration at Olche; in continuing with exploration along the remainder of the prospective contact zone.

 

For more information please contact:

Eurasia Mining

Christian Schaffalitzky / Michael de Villiers

 

Tel: +44 (0) 207 932 0418

Katy Mitchell, WH Ireland Limited

Tel: +44 (0) 161 832 2174

 

 

Consent for release

 

Christian Schaffalitzky, FIMMM, PGeo, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the reporting of these results.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSISAWFSSEIL
Date   Source Headline
22nd Mar 20249:26 amRNSReplacement of Queeld & Mispare share certificates
6th Mar 20247:55 amRNSUpdate re Queeld & Mispare share certificates
11th Jan 202410:19 amRNSSupreme Court Tax Litigation Win
14th Dec 20237:00 amRNSLegal Matters - Update
7th Dec 20237:00 amRNSCorporate Update
15th Nov 202312:51 pmRNSReplacement of Queeld & Mispare share certificates
3rd Nov 20234:47 pmRNSResponse to speculation
3rd Nov 20237:05 amRNSExercise of Options
19th Sep 20237:00 amRNSInterim Results for the six months ended 30 June
26th Jul 20233:16 pmRNSResult of AGM
3rd Jul 20237:00 amRNSApproval of DFS and management changes
3rd Jul 20237:00 amRNSAnnual Results and Notice of AGM
10th May 202311:30 amRNSResponse to media comment
2nd May 202311:32 amRNSExtension of Company Options
11th Apr 202311:00 amRNSCorporate and Operational Update
6th Mar 20234:35 pmRNSPrice Monitoring Extension
2nd Feb 202310:02 amRNSExercise of Options
24th Jan 20232:24 pmRNSUpdate with respect to the Rosgeo Agreement
21st Dec 202210:05 amRNSCorporate Update
24th Nov 20224:41 pmRNSSecond Price Monitoring Extn
24th Nov 20224:35 pmRNSPrice Monitoring Extension
4th Nov 20222:06 pmRNSSecond Price Monitoring Extn
4th Nov 20222:00 pmRNSPrice Monitoring Extension
2nd Nov 20222:41 pmRNSExtension of Company Options
30th Sep 20227:00 amRNSInterim Results for the six months ended 30 June
21st Sep 202211:06 amRNSSecond Price Monitoring Extn
21st Sep 202211:00 amRNSPrice Monitoring Extension
14th Sep 20224:36 pmRNSPrice Monitoring Extension
14th Sep 20222:06 pmRNSSecond Price Monitoring Extn
14th Sep 20222:00 pmRNSPrice Monitoring Extension
9th Aug 20224:41 pmRNSSecond Price Monitoring Extn
9th Aug 20224:35 pmRNSPrice Monitoring Extension
8th Aug 20224:41 pmRNSSecond Price Monitoring Extn
8th Aug 20224:36 pmRNSPrice Monitoring Extension
28th Jul 20223:12 pmRNSResult of AGM
12th Jul 20229:00 amRNSPrice Monitoring Extension
7th Jul 20224:41 pmRNSSecond Price Monitoring Extn
7th Jul 20224:35 pmRNSPrice Monitoring Extension
7th Jul 20229:05 amRNSSecond Price Monitoring Extn
7th Jul 20229:00 amRNSPrice Monitoring Extension
6th Jul 20224:40 pmRNSSecond Price Monitoring Extn
6th Jul 20224:35 pmRNSPrice Monitoring Extension
30th Jun 202211:00 amRNSPrice Monitoring Extension
29th Jun 20227:00 amRNSAnnual Results and Notice of AGM
7th Jun 20227:00 amRNSAnnual audited accounts and AGM timing
31st May 20224:41 pmRNSSecond Price Monitoring Extn
31st May 20224:35 pmRNSPrice Monitoring Extension
18th May 20227:30 amRNSRestoration - Eurasia Mining Plc
18th May 20227:00 amRNSNew Director Appointed
17th May 20226:18 pmRNSRestoration of Trading

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.