The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.425
Bid: 1.40
Ask: 1.45
Change: 0.00 (0.00%)
Spread: 0.05 (3.571%)
Open: 1.425
High: 1.425
Low: 1.40
Prev. Close: 1.425
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Update - Kola

7 Apr 2010 10:00

RNS Number : 8099J
Eurasia Mining PLC
07 April 2010
 



Eurasia Mining plc

("Eurasia" or the "Company")

 

Exploration Update - Kola

 

Eurasia is pleased to announce the results of its 2009 drilling and exploration programme, comprising a comprehensive analysis and interpretation of its Monchetundra (36.2km2) and Volchetundra (210km2) platinum group metals (PGM) projects, located on the Kola Peninsula in north-west Russia. Both licences are held in Joint Venture with Anglo Platinum as a 40% shareholder.

 

The Licence areas are adjacent to the town of Monchegorsk with excellent access and infrastructure.

 

The projects are on the same geological belt as Fedorova Tundra, (Barrick Gold) and the East Pansky deposits. The Fedorova Deposit is a large, near surface, low grade, bulk minable PGM deposit located near the basal contact of an ultramafic intrusive complex. Exploration at East Pansky has identified a deeper, higher grade, underground mineable PGM occurrence. Eurasia is incorporating both these deposit models as a conceptual targeting mechanism to refine exploration efforts on its licences.

 

Monchetundra

 

To date, 16,121m of drilling have been completed on the licence, with most of the intersections from the last phases of drilling having been previously announced in early 2009 as a table of results, without accompanying geological comment. Subsequent work during 2009 focused on an interpreted ore structure in the Loipishnyun sub-area, stemming from recent drilling, but also included several previously unreported intersections.

 

PGM mineralisation occurs within two NNW striking lodes, the northernmost lode is cut by a 50m wide tectonic zone and is interpreted to occur as parallel bodies. To the south, mineralisation is interpreted to only occur as a single elongated body. Intersections within Lode 1 are tabulated in the Table below:

 

MONCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

 

WESTERN OREBODY LODE L1

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ÌÒ-39

7528902.04

489759.09

42 o

-60o

96.1

7.3

1.1

ÌÒ-71

7528823.33

489685.44

42 o

-60o

219.1

3.9

1.85

ÌÒ-11

7529037.20

489742.72

42 o

-60o

19.1

6.9

2.42

ÌÒ-38*

7528541.35

 489954.62

42 o

-65 o

131.7

15

3.58

ÌÒ-70

7528957.96

489661.92

42 o

-60 o

229.3

4.2

1.51

ÌÒ-68

7529048.08

489624.13

42 o

-60 o

117

13.8

1.98

ÌÒ-69

7529005.33

489584.06

42 o

-60 o

243

6.3

2.47

ÞÌ-7

7529166.50

489586.78

42 o

-65 o

83

6.7

1.8

 including

112.7

15.3

2.2

ÌÒ-72

7529112.99

489535.83

42 o

-65 o

254.7

10.05

2.37

ÌÒ-73

7529212.11

489498.10

42 o

-60 o

141.9

7.8

1.79

* Denotes previously unreported Intersection

 

 

MONCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

 

EASTERN OREBODY LODE L1

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ÌÒ-11

7529037.20

489742.72

42 o

-60 o

53.6

15.6

1.9

ÌÒ-38*

7528541.35

 489954.62

42 o

-65 o

163.4

3.5

1.33

ÌÒ-70*

7528957.96

489661.92

42 o

-60 o

258.75

0.75

1.43

ÌÒ-68*

7529048.08

489624.13

42 o

-60 o

134

1

2.04

ÌÒ-69

7529005.33

489584.06

42 o

-60 o

243

24.9

1.35

 including*

254.1

9.7

1.28

ÞÌ-7

7529166.50

489586.78

42 o

-65 o

112.7

15.3

2.2

ÌÒ-72

7529112.99

489535.83

42 o

-65 o

272.3

8.8

2.63

ÌÒ-73

7529212.11

489498.10

42 o

-60 o

276.4

1.3

3.18

ÌÒ-74

7529260.04

489542.87

42 o

-60 o

123.6

13.4

2.33

 including*

123.6

7.1

3.49

SOUTHERN BLOCK LODE L1

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ÌÒ-18

7528542.67

489959.08

42 o

-60 o

24.9

10.7

1.37

ÌÒ-55

7528473.74

489900.32

42 o

-60 o

133.7

2.35

1.1

ÌÒ-6

7528660.87

489921.06

42 o

-65 o

43.7

18

1.67

ÌÒ-60

7528726.47

489861.69

42 o

-60 o

71.9

9.1

1.07

ÌÒ-65

7528684.25

489822.98

42 o

-60 o

134.25

2.05

1.77

ÌÒ-66

7528619.72

489779.79

42 o

-60 o

207.35

1.95

1.41

* Denotes previously unreported Intersection

 

The average Pd:Pt ratio for Monchetundra is 2.36:1.

 

The strike length drilled to date for Lode 1 is 400 and 350m for the Northern and Southern sections, respectively. The lodes extend from the surface and have currently been drill tested to a vertical depth of approximately 200m. The more southern Lode 2 is located close to the eastern boundary of the licence; the drilled strike length to date is approximately 420m. Intersections within Lode 2 are tabulated in the Table below:

 

MONCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

 

LODE L2

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ÌÒ-13

7528493.29

490581.95

42 o

-60 o

121.6

7.65

1.48

ÌÒ-14

7528464.65

490555.37

42 o

-60 o

163.5

11.3

2.93

ÞÌ-9

7528631.50

490461.91

42 o

-65 o

46.6

21.3

1.92

ÌÒ-12

 7528598.30

490430.63

42 o

-65 o

121

21.1

1.01

 

In parallel with this interpretation, work is continuing on identifying additional PGM occurrences resulting in the identification of a new target ready for drill testing, scheduled to commence in 2Q10.

 

With inclusion of work planned for 2010 we believe exploration on the Monchetundra Licence will advance the project to the stage that will support an application for a licence time extension, with the objective of eventually converting the exploration licence to a production licence. Further updates on this work, including a resource update, will be provided as soon as they become available.

 

Volchetundra

To date, 12,192m of drilling have been completed on the Volchetundra Licence. The focus has been on two areas of mineralized contact, Olche and Yukspor, located approximately 3.5km apart. Recent drilling tested 2.6km strike length at the more northern Olche prospect, whilst only 2km of strike-length was drill-tested at Yukspor. The total strike length of prospective contact zone within the licence area is interpreted to exceed 40kms.

 

All intersections at Olche and Yukspor, other than those deemed to be immaterial by the Company's Competent Person, are tabulated in the Table below. They include a number of wide, low grade values near contact intersections, which provide the best indication to date of the potential for near surface bulk mineable ore zones on the licence area. Narrow deep intersections include:

 

VOLCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

 

OLCHE AREA

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

23

7568703.29

473686.94

262 o

-65 o

24.5

23.9

1.17

17

7568721.16

473733.64

262 o

-65 o

68.4

44.6

1.76

144.9

18.5

1.9

including

144.9

4.4

3.59

including

156.1

7.3

2.55

170.2

2

5.86

27

7568118.01

473774.93

262 o

-65 o

1

16.6

0.72

25.9

33.1

1.36

including

25.9

3.1

0.83

including

31.3

27.7

1.6

62.9

3

0.94

59

7568086.52

473609.98

82 o

-60 o

30.6

24

1.31

69

7567706.83

473787.79

262 o

-60 o

89.9

2.5

1.83

106.8

5.2

1.49

66

7567724.31

473894.94

262 o

-60 o

230.9

7.8

5.48

62

7567338.76

474041.70

262 o

-60 o

140.6

16.8

1.34

YUKSPOR AREA

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

36*

7565511.96

474601.03

262 o

-60 o

196.1

1.2

3.68

40

7565397.14

474624.06

264 o

-65 o

217.4

3.2

5.22

219.6

1

14.27

47*

7564062.73

474888.41

262 o

-60 o

60

2

2.22

79

1

3.4

53*

7564892.98

474554.58

-90 o

29.5

1.3

3.38

* Denotes previously unreported Intersection

 

 

The average Pd:Pt ratio for Volchetundra is 2.93:1.

 

As with Monchetundra, work has advanced to the stage for carrying out detailed exploration at Olche; in continuing with exploration along the remainder of the prospective contact zone.

 

For more information please contact:

Eurasia Mining

Christian Schaffalitzky / Michael de Villiers

 

Tel: +44 (0) 207 932 0418

Katy Mitchell, WH Ireland Limited

Tel: +44 (0) 161 832 2174

 

 

Consent for release

 

Christian Schaffalitzky, FIMMM, PGeo, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the reporting of these results.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSISAWFSSEIL
Date   Source Headline
5th Jan 202111:51 amRNSForm 8.5 (EPT/RI) - Eurasia Mining
4th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
31st Dec 20201:00 pmRNSForm 8.3 - Eurasia Mining plc
31st Dec 202011:55 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
30th Dec 202011:08 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
29th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
29th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
24th Dec 20201:00 pmRNSForm 8.3 - Eurasia Mining plc
24th Dec 202012:44 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining
23rd Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
23rd Dec 202012:20 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
22nd Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
22nd Dec 202011:11 amRNSForm 8.5 (EPT/RI)Eurasia Mining PLC
22nd Dec 20208:48 amRNSForm 8.3 - Eurasia Mining
21st Dec 20203:52 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
21st Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
21st Dec 202012:06 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
18th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
18th Dec 202011:43 amRNSForm 8.5 (EPT/RI) Eurasia Mining PLC
17th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
16th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
16th Dec 202011:58 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
15th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
15th Dec 202011:58 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
15th Dec 20209:02 amRNSForm 8.3 - Eurasia Mining
14th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
14th Dec 202011:06 amRNSForm 8.5 (EPT/RI) - Eurasia Mining PLC
11th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
11th Dec 202011:13 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
10th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
9th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
9th Dec 202011:53 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
8th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
8th Dec 202011:40 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
7th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
7th Dec 202011:56 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
3rd Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
3rd Dec 202011:58 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
3rd Dec 20207:00 amRNSWest Kytlim DFS update
2nd Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
2nd Dec 202012:10 pmRNSRule 2.9 Announcement
2nd Dec 202011:54 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc Replacement
2nd Dec 202011:46 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
1st Dec 202011:30 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
30th Nov 20204:41 pmRNSSecond Price Monitoring Extn
30th Nov 20204:36 pmRNSPrice Monitoring Extension
30th Nov 202011:56 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
25th Nov 202011:15 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
18th Nov 202011:47 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
17th Nov 202011:57 amRNSForm 8.5 (EPT/RI) - Eurasia Mining PLC

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.