If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

Share Price is delayed by 15 minutes
Get Live Data
2.425    0.00 (0.00%)
Bid:
2.35
Ask:
2.50
Spread: 0.15 (6.383%)
Market Cap: £71.57m
EUA Live PriceLast checked at - London Stock Exchange

Intraday Eurasia Mining Share Chart

Exploration Update - Kola

7 Apr 2010 10:00

RNS Number : 8099J
Eurasia Mining PLC
07 April 2010
Β 

ο»Ώ

Eurasia Mining plc

("Eurasia" or the "Company")

Β 

Exploration Update - Kola

Β 

Eurasia is pleased to announce the results of its 2009 drilling and exploration programme, comprising a comprehensive analysis and interpretation of its Monchetundra (36.2km2) and Volchetundra (210km2) platinum group metals (PGM) projects, located on the Kola Peninsula in north-west Russia. Both licences are held in Joint Venture with Anglo Platinum as a 40% shareholder.

Β 

The Licence areas are adjacent to the town of Monchegorsk with excellent access and infrastructure.

Β 

The projects are on the same geological belt as Fedorova Tundra, (Barrick Gold) and the East Pansky deposits. The Fedorova Deposit is a large, near surface, low grade, bulk minable PGM deposit located near the basal contact of an ultramafic intrusive complex. Exploration at East Pansky has identified a deeper, higher grade, underground mineable PGM occurrence. Eurasia is incorporating both these deposit models as a conceptual targeting mechanism to refine exploration efforts on its licences.

Β 

Monchetundra

Β 

To date, 16,121m of drilling have been completed on the licence, with most of the intersections from the last phases of drilling having been previously announced in early 2009 as a table of results, without accompanying geological comment. Subsequent work during 2009 focused on an interpreted ore structure in the Loipishnyun sub-area, stemming from recent drilling, but also included several previously unreported intersections.

Β 

PGM mineralisation occurs within two NNW striking lodes, the northernmost lode is cut by a 50m wide tectonic zone and is interpreted to occur as parallel bodies. To the south, mineralisation is interpreted to only occur as a single elongated body. Intersections within Lode 1 are tabulated in the Table below:

Β 

MONCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

Β 

WESTERN OREBODY LODE L1

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ΓŒΓ’-39

7528902.04

489759.09

42 o

-60o

96.1

7.3

1.1

ΓŒΓ’-71

7528823.33

489685.44

42 o

-60o

219.1

3.9

1.85

ΓŒΓ’-11

7529037.20

489742.72

42 o

-60o

19.1

6.9

2.42

ΓŒΓ’-38*

7528541.35

Β 489954.62

42 o

-65 o

131.7

15

3.58

ΓŒΓ’-70

7528957.96

489661.92

42 o

-60 o

229.3

4.2

1.51

ΓŒΓ’-68

7529048.08

489624.13

42 o

-60 o

117

13.8

1.98

ΓŒΓ’-69

7529005.33

489584.06

42 o

-60 o

243

6.3

2.47

ÞÌ-7

7529166.50

489586.78

42 o

-65 o

83

6.7

1.8

Β including

112.7

15.3

2.2

ΓŒΓ’-72

7529112.99

489535.83

42 o

-65 o

254.7

10.05

2.37

ΓŒΓ’-73

7529212.11

489498.10

42 o

-60 o

141.9

7.8

1.79

* Denotes previously unreported Intersection

Β 

Β 

MONCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

Β 

EASTERN OREBODY LODE L1

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ΓŒΓ’-11

7529037.20

489742.72

42 o

-60 o

53.6

15.6

1.9

ΓŒΓ’-38*

7528541.35

Β 489954.62

42 o

-65 o

163.4

3.5

1.33

ΓŒΓ’-70*

7528957.96

489661.92

42 o

-60 o

258.75

0.75

1.43

ΓŒΓ’-68*

7529048.08

489624.13

42 o

-60 o

134

1

2.04

ΓŒΓ’-69

7529005.33

489584.06

42 o

-60 o

243

24.9

1.35

Β including*

254.1

9.7

1.28

ÞÌ-7

7529166.50

489586.78

42 o

-65 o

112.7

15.3

2.2

ΓŒΓ’-72

7529112.99

489535.83

42 o

-65 o

272.3

8.8

2.63

ΓŒΓ’-73

7529212.11

489498.10

42 o

-60 o

276.4

1.3

3.18

ΓŒΓ’-74

7529260.04

489542.87

42 o

-60 o

123.6

13.4

2.33

Β including*

123.6

7.1

3.49

SOUTHERN BLOCK LODE L1

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ΓŒΓ’-18

7528542.67

489959.08

42 o

-60 o

24.9

10.7

1.37

ΓŒΓ’-55

7528473.74

489900.32

42 o

-60 o

133.7

2.35

1.1

ΓŒΓ’-6

7528660.87

489921.06

42 o

-65 o

43.7

18

1.67

ΓŒΓ’-60

7528726.47

489861.69

42 o

-60 o

71.9

9.1

1.07

ΓŒΓ’-65

7528684.25

489822.98

42 o

-60 o

134.25

2.05

1.77

ΓŒΓ’-66

7528619.72

489779.79

42 o

-60 o

207.35

1.95

1.41

* Denotes previously unreported Intersection

Β 

The average Pd:Pt ratio for Monchetundra is 2.36:1.

Β 

The strike length drilled to date for Lode 1 is 400 and 350m for the Northern and Southern sections, respectively. The lodes extend from the surface and have currently been drill tested to a vertical depth of approximately 200m. The more southern Lode 2 is located close to the eastern boundary of the licence; the drilled strike length to date is approximately 420m. Intersections within Lode 2 are tabulated in the Table below:

Β 

MONCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

Β 

LODE L2

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

ΓŒΓ’-13

7528493.29

490581.95

42 o

-60 o

121.6

7.65

1.48

ΓŒΓ’-14

7528464.65

490555.37

42 o

-60 o

163.5

11.3

2.93

ÞÌ-9

7528631.50

490461.91

42 o

-65 o

46.6

21.3

1.92

ΓŒΓ’-12

Β 7528598.30

490430.63

42 o

-65 o

121

21.1

1.01

Β 

In parallel with this interpretation, work is continuing on identifying additional PGM occurrences resulting in the identification of a new target ready for drill testing, scheduled to commence in 2Q10.

Β 

With inclusion of work planned for 2010 we believe exploration on the Monchetundra Licence will advance the project to the stage that will support an application for a licence time extension, with the objective of eventually converting the exploration licence to a production licence. Further updates on this work, including a resource update, will be provided as soon as they become available.

Β 

Volchetundra

To date, 12,192m of drilling have been completed on the Volchetundra Licence. The focus has been on two areas of mineralized contact, Olche and Yukspor, located approximately 3.5km apart. Recent drilling tested 2.6km strike length at the more northern Olche prospect, whilst only 2km of strike-length was drill-tested at Yukspor. The total strike length of prospective contact zone within the licence area is interpreted to exceed 40kms.

Β 

All intersections at Olche and Yukspor, other than those deemed to be immaterial by the Company's Competent Person, are tabulated in the Table below. They include a number of wide, low grade values near contact intersections, which provide the best indication to date of the potential for near surface bulk mineable ore zones on the licence area. Narrow deep intersections include:

Β 

VOLCHETUNDRA : MAIN INTERSECTIONS DRILLED TO DATE

Β 

OLCHE AREA

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

23

7568703.29

473686.94

262 o

-65 o

24.5

23.9

1.17

17

7568721.16

473733.64

262 o

-65 o

68.4

44.6

1.76

144.9

18.5

1.9

including

144.9

4.4

3.59

including

156.1

7.3

2.55

170.2

2

5.86

27

7568118.01

473774.93

262 o

-65 o

1

16.6

0.72

25.9

33.1

1.36

including

25.9

3.1

0.83

including

31.3

27.7

1.6

62.9

3

0.94

59

7568086.52

473609.98

82 o

-60 o

30.6

24

1.31

69

7567706.83

473787.79

262 o

-60 o

89.9

2.5

1.83

106.8

5.2

1.49

66

7567724.31

473894.94

262 o

-60 o

230.9

7.8

5.48

62

7567338.76

474041.70

262 o

-60 o

140.6

16.8

1.34

YUKSPOR AREA

Hole ID

Easting

Northing

Azimuth

Declination

From (m)

Thickness (m)

Pt+Pd g/t

36*

7565511.96

474601.03

262 o

-60 o

196.1

1.2

3.68

40

7565397.14

474624.06

264 o

-65 o

217.4

3.2

5.22

219.6

1

14.27

47*

7564062.73

474888.41

262 o

-60 o

60

2

2.22

79

1

3.4

53*

7564892.98

474554.58

-90 o

29.5

1.3

3.38

* Denotes previously unreported Intersection

Β 

Β 

The average Pd:Pt ratio for Volchetundra is 2.93:1.

Β 

As with Monchetundra, work has advanced to the stage for carrying out detailed exploration at Olche; in continuing with exploration along the remainder of the prospective contact zone.

Β 

For more information please contact:

Eurasia Mining

Christian Schaffalitzky / Michael de Villiers

Β 

Tel: +44 (0) 207 932 0418

Katy Mitchell, WH Ireland Limited

Tel: +44 (0) 161 832 2174

Β 

Β 

Consent for release

Β 

Christian Schaffalitzky, FIMMM, PGeo, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the reporting of these results.

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLSSISAWFSSEIL
Date   Source Headline
25th Nov 201912:30 pmRNSClarification of Understanding with CITIC & VTB
15th Nov 20194:26 pmRNSExercise of Warrants
14th Nov 201912:35 pmRNSAmendment: Exercise of Options, Warrants & Clause
13th Nov 20196:06 pmRNSExercise of Options, Warrants & Accelerator Clause
11th Nov 20194:40 pmRNSSecond Price Monitoring Extn
11th Nov 20194:35 pmRNSPrice Monitoring Extension
11th Nov 20192:28 pmRNSAlexander Sushchev Appointed as Strategic Advisor
8th Nov 20195:34 pmRNSExercise of Warrants
5th Nov 20195:20 pmRNSExercise of Options and Warrants
4th Nov 20194:41 pmRNSSecond Price Monitoring Extn
4th Nov 20194:35 pmRNSPrice Monitoring Extension
4th Nov 20192:05 pmRNSSecond Price Monitoring Extn
4th Nov 20192:00 pmRNSPrice Monitoring Extension
30th Oct 20194:45 pmRNSExercise of Warrants
30th Oct 20192:05 pmRNSSecond Price Monitoring Extn
30th Oct 20192:00 pmRNSPrice Monitoring Extension
30th Oct 201911:05 amRNSSecond Price Monitoring Extn
30th Oct 201911:00 amRNSPrice Monitoring Extension
29th Oct 20194:22 pmRNSExercise of Warrants
29th Oct 201911:05 amRNSSecond Price Monitoring Extn
29th Oct 201911:00 amRNSPrice Monitoring Extension
29th Oct 20199:05 amRNSSecond Price Monitoring Extn
29th Oct 20199:00 amRNSPrice Monitoring Extension
28th Oct 20195:36 pmRNSExercise of Warrants
28th Oct 20194:41 pmRNSSecond Price Monitoring Extn
28th Oct 20194:35 pmRNSPrice Monitoring Extension
28th Oct 201911:05 amRNSSecond Price Monitoring Extn
28th Oct 201911:00 amRNSPrice Monitoring Extension
28th Oct 20199:05 amRNSSecond Price Monitoring Extn
28th Oct 20199:00 amRNSPrice Monitoring Extension
25th Oct 20194:36 pmRNSExercise of Warrants & Trading Update
25th Oct 20192:00 pmRNSPrice Monitoring Extension
24th Oct 201911:05 amRNSSecond Price Monitoring Extn
24th Oct 201911:00 amRNSPrice Monitoring Extension
24th Oct 20199:53 amRNSEngagement with CITIC and VTB Capital
26th Sep 20197:05 amRNSInterim Report
26th Sep 20197:00 amRNSMonchetundra Flanks Application Submitted
16th Sep 20197:00 amRNSSenior Management Team Appointment
13th Aug 20197:00 amRNSMonchetundra Update Sinosteel EPC H1 2019
24th Jun 201911:12 amRNSIssue of Equity & Directors' Holdings
20th Jun 20192:12 pmRNSResult of AGM
17th Jun 20197:00 amRNSApplication for Tipil license lodged
10th Jun 20197:00 amRNSWest Kytlim Update
3rd Jun 20197:00 amRNSWest Kytlim Production Update
15th May 20197:00 amRNSAnnual Report and Accounts
10th May 201912:36 pmRNSChange of Registered Address
29th Apr 20197:00 amRNSWest Kytlim Update April 2019
18th Apr 20191:44 pmRNSStrategic Placing - Issue of Equity
26th Mar 201911:26 amRNSMonchetundra Update Sinosteel EPC Q1 2019
28th Jan 20197:00 amRNSWest Kytlim Production 2019

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.