The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksChina Nonferr Regulatory News (CNG)

  • This share is currently suspended. It was suspended at a price of 0.94

Share Price Information for China Nonferr (CNG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.94
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.94
CNG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

12 Apr 2006 13:04

Kryso Resources PLC12 April 2006 12 April 2006 KRYSO RESOURCES plc DRILLING REPORT Kryso Resources plc ("Kryso" or "the Company") is pleased to announce the firstset of drill results from its exploration diamond drill programme on its 100%owned Pakrut Gold Deposit ("Pakrut") located in the Republic of Tajikistan. Thedeposit is located within the 63sq.km Pakrut Licensed Area within which are theEastern Pakrut, Sulphidnoye and Rufigar prospects. During 2006, Kryso plans to complete its underground drilling programme forfurther evaluation of the Pakrut Gold Deposit and reporting using the guidelinesof the JORC Code. Previously the Soviets had evaluated the deposit and reportedthe tonnes and grade using the Soviet Resource Classification. Three surface holes (PKDD-1, PKDD-2 and PKDD-3) were completed by the end of2005. Subsequently, the Company was able to operate throughout the winter and todate has completed over 1,800m of drilling and over 270m of underground aditdevelopment. This has resulted in the redefinition of the mineralised zones anda better understanding of the structural and geological controls to themineralization. The style of the mineralization at Pakrut appears to beanalogous to other gold deposits found in the region. The three holes drilled from surface were targeted to intersect mineralizationon the edge of the ore zones, while the first series of holes drilled fromunderground were drilled to target the mineralization between the ore zones.Both the initial surface and underground drilling locations were selected toavoid any delay whilst waiting for underground development. As undergrounddevelopment continues, new drill stations will be established so that drillingcan concentrate on the main known ore zones. The Company currently has its twoOnram drill rigs underground and plans are underway to relocate its Longyear rigunderground. As there is difficulty in visually determining the ore zones in the drill core,the Company has set up its own sample preparation and atomic absorptionspectroscopy (AAS) laboratory in Dushanbe, the capital city. Here the entirecore from each hole is prepared and assayed. From these AAS results, theprepared core samples from the identified mineralised zones are currently beingmade ready for shipping to an internationally recognised laboratory where theywill be fire assayed. These assays will then be used for the grade model thatwill be prepared once the drill programme has been completed. The AAS method foranalysing gold is generally accepted as being one of the quickest, but wherecoarse gold is encountered, such as is present at Pakrut, it oftenunderestimates the gold content. To date, the AAS laboratory in Dushanbe hasanalysed over 1000 core samples for gold and silver. Kryso has engaged Snowden Mining Industry Consultants to complete a FeasibilityStudy of the Pakrut deposit and, in addition, a local consultant is currentlyworking on an Environmental Base Line Study of the area. During 2006 the Companyis planning to undertake an extensive surface-trenching programme along with there-sampling of the new and existing underground workings. All references to exploration results have been approved for release by TrevorDavenport, B.Sc, M.Sc, Ph.D, MIMM, C.Eng, Chairman of Kryso, who has more than30 years experience in the mining industry. He has consented to the inclusion ofthe material in the form and context in which it appears. For further information please contact: Kryso Resources plc. Dr. Trevor DavenportTelephone 01481 822972 Vassilios CarellasMobile 07970 756352 The mineralised intersections are listed below. Highlights include: 52.8m @ 1.99 g/t Au in Drillhole PKDD-18.5m @ 3.24 g/t Au in Drillhole PKDD-47.8m @ 6.46 g/t Au in Drillhole PKDD-620m @ 2.65 g/t Au in Drillhole PKDD-11 Mineralised Drillhole Intersections, Pakrut Gold Deposit (AAS analyses from Kryso Laboratory, Dushanbe) PKDD-1: 52.8m @ 1.99g/t Au from 0m (incl. 11.2m @ 4.81g/t Au from 6.8m)terminated in mineralization at 52.8m due to the ground conditions. PKDD-2: 76.1 m @ 0.90g/t Au from 27.4m (incl. 15m @ 1.53g/t Au from 48m and 16m@ 1.35g/t Au from 69m). Length of Hole - 108.5m. PKDD-3: 15.6m @ 1.67g/t Au from 23.5m (incl. 8.1m @ 2.83g/t Au from 31m) and 18m@ 1.25g/t Au from 86.5m (incl. 6.4m @ 1.76g/t Au from 92.1m). Length of Hole -137.5m. PKDD-4: 4.5m @ 2.55g/t Au from 29.5m (incl. 3m @ 3.6g/t from 29.5) and 8.5m @3.24g/t Au from 62.5m (incl. 4.5m @ 5.83g/t Au from 64m). Length of Hole -80.5m. PKDD-5: 12m @ 1.27g/t Au from 28m (incl. 3m @ 3.62g/t Au from 37m). Length ofHole -100m. PKDD-6: 3m @ 1.02g/t Au from 43m and 7.8m @ 6.46g/t Au from 54m (incl. 2.8m @15.42g/t Au from 59m). Length of Hole - 85m. PKDD-7: 1m @ 3.76g/t from 61m and 2m @1.96g/t from 77m. Length of Hole - 85m. PKDD-8: 1m @ 5.63g/t from 12m and 1m @2.20g/t from 36m. Length of Hole - 89m. PKDD-9: 16.5m @ 0.96g/t Au (incl. 3.5m @ 1.14g/t Au from 56.5m and 6m @ 1.57g/tAu from 63m) terminated in mineralization at 69m due to the ground conditions. PKDD-10: 4m @ 1.99g/t Au. Length of Hole - 82m. PKDD-11: 20m @ 2.65g/t Au (incl. 10m @ 4.4g/t Au from 45m, or 4.5m @ 7.12g/t Aufrom 50.5m). Length of Hole - 71.5m. PKDD-12: 3m @ 5.81 g/t Au from 18m (incl. 2m 8.38 g/t Au from 18m). Length ofHole - 62.5m. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
24th Jul 20087:00 amPRNDrilling Report
23rd Jul 200812:45 pmPRNResult of AGM
7th Jul 20087:00 amPRNDrilling Report
27th Jun 20082:15 pmPRNAnnual Report and Accounts
27th Jun 200811:51 amPRNNotice of AGM
27th Jun 200811:33 amPRNFinal Results
25th Apr 200811:21 amPRNConvertible Loan Agreement
27th Mar 20081:39 pmPRNHolding(s) in Company
13th Feb 20087:01 amRNSPre-Feasibility Study Results
31st Jan 20087:00 amPRNChange of Adviser
11th Dec 20077:00 amPRNHukas Geophysical Survey Results
20th Nov 20077:00 amPRNUpdate of Resource Estimate
15th Nov 20072:08 pmPRNHolding(s) in Company
14th Nov 200711:37 amPRNHolding(s) in Company
13th Nov 20077:00 amPRNDrilling Update
31st Oct 200710:30 amPRNTotal Voting Rights
19th Oct 20079:35 amPRNHolding(s) in Company
8th Oct 20071:52 pmPRNIssue of Equity
3rd Oct 200710:41 amPRNIssue of Equity
1st Oct 20072:41 pmPRNIssue of Equity
27th Sep 200712:25 pmPRNChange of Registered Office
27th Sep 200712:09 pmPRNHolding(s) in Company
25th Sep 200711:35 amPRNHalf-yearly Report
14th Aug 200711:18 amPRNCompany Website
7th Aug 20079:44 amPRNHolding(s) in Company
9th Jul 20077:00 amPRNResult of AGM
2nd Jul 200710:09 amPRNDrilling Report
14th Jun 200710:11 amPRNCorrection : Notice of AGM
14th Jun 200710:02 amPRNCorrection : Final Results
14th Jun 20077:01 amPRNNotice of AGM
14th Jun 20077:01 amPRNMailing of Report & Accounts
14th Jun 20077:00 amPRNFinal Results
21st May 20078:00 amPRNKryso shares trade on PLUS
25th Apr 20079:30 amPRNDirectorate Change
20th Apr 200710:17 amPRNDirector/PDMR Shareholding
16th Apr 20079:30 amPRNGeophysical Survey to commence in May
23rd Mar 20072:09 pmPRNProgress Update
19th Mar 20077:00 amPRNPakrut Resource Estimate
14th Mar 200710:25 amPRNChange of Adviser
19th Feb 20077:00 amPRNDrilling Report
29th Dec 20068:45 amPRNTotal Voting Rights
21st Dec 200611:55 amPRNAdmission of new shares
20th Dec 20063:00 pmPRNPlacing of shares and warrants
26th Sep 20067:00 amPRNNotice of Results
25th Sep 20067:00 amPRNDrilling Report
4th Sep 200611:51 amPRNHolding(s) in Company
14th Aug 20069:28 amPRNNew Nickel Copper Licence
12th Apr 20061:04 pmRNSDrilling Report
9th Sep 200512:35 pmRNSHolding(s) in Company
8th Sep 200512:55 pmRNSExploration Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.