The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksChina Nonferr Regulatory News (CNG)

  • This share is currently suspended. It was suspended at a price of 0.94

Share Price Information for China Nonferr (CNG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.94
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.94
CNG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

12 Apr 2006 13:04

Kryso Resources PLC12 April 2006 12 April 2006 KRYSO RESOURCES plc DRILLING REPORT Kryso Resources plc ("Kryso" or "the Company") is pleased to announce the firstset of drill results from its exploration diamond drill programme on its 100%owned Pakrut Gold Deposit ("Pakrut") located in the Republic of Tajikistan. Thedeposit is located within the 63sq.km Pakrut Licensed Area within which are theEastern Pakrut, Sulphidnoye and Rufigar prospects. During 2006, Kryso plans to complete its underground drilling programme forfurther evaluation of the Pakrut Gold Deposit and reporting using the guidelinesof the JORC Code. Previously the Soviets had evaluated the deposit and reportedthe tonnes and grade using the Soviet Resource Classification. Three surface holes (PKDD-1, PKDD-2 and PKDD-3) were completed by the end of2005. Subsequently, the Company was able to operate throughout the winter and todate has completed over 1,800m of drilling and over 270m of underground aditdevelopment. This has resulted in the redefinition of the mineralised zones anda better understanding of the structural and geological controls to themineralization. The style of the mineralization at Pakrut appears to beanalogous to other gold deposits found in the region. The three holes drilled from surface were targeted to intersect mineralizationon the edge of the ore zones, while the first series of holes drilled fromunderground were drilled to target the mineralization between the ore zones.Both the initial surface and underground drilling locations were selected toavoid any delay whilst waiting for underground development. As undergrounddevelopment continues, new drill stations will be established so that drillingcan concentrate on the main known ore zones. The Company currently has its twoOnram drill rigs underground and plans are underway to relocate its Longyear rigunderground. As there is difficulty in visually determining the ore zones in the drill core,the Company has set up its own sample preparation and atomic absorptionspectroscopy (AAS) laboratory in Dushanbe, the capital city. Here the entirecore from each hole is prepared and assayed. From these AAS results, theprepared core samples from the identified mineralised zones are currently beingmade ready for shipping to an internationally recognised laboratory where theywill be fire assayed. These assays will then be used for the grade model thatwill be prepared once the drill programme has been completed. The AAS method foranalysing gold is generally accepted as being one of the quickest, but wherecoarse gold is encountered, such as is present at Pakrut, it oftenunderestimates the gold content. To date, the AAS laboratory in Dushanbe hasanalysed over 1000 core samples for gold and silver. Kryso has engaged Snowden Mining Industry Consultants to complete a FeasibilityStudy of the Pakrut deposit and, in addition, a local consultant is currentlyworking on an Environmental Base Line Study of the area. During 2006 the Companyis planning to undertake an extensive surface-trenching programme along with there-sampling of the new and existing underground workings. All references to exploration results have been approved for release by TrevorDavenport, B.Sc, M.Sc, Ph.D, MIMM, C.Eng, Chairman of Kryso, who has more than30 years experience in the mining industry. He has consented to the inclusion ofthe material in the form and context in which it appears. For further information please contact: Kryso Resources plc. Dr. Trevor DavenportTelephone 01481 822972 Vassilios CarellasMobile 07970 756352 The mineralised intersections are listed below. Highlights include: 52.8m @ 1.99 g/t Au in Drillhole PKDD-18.5m @ 3.24 g/t Au in Drillhole PKDD-47.8m @ 6.46 g/t Au in Drillhole PKDD-620m @ 2.65 g/t Au in Drillhole PKDD-11 Mineralised Drillhole Intersections, Pakrut Gold Deposit (AAS analyses from Kryso Laboratory, Dushanbe) PKDD-1: 52.8m @ 1.99g/t Au from 0m (incl. 11.2m @ 4.81g/t Au from 6.8m)terminated in mineralization at 52.8m due to the ground conditions. PKDD-2: 76.1 m @ 0.90g/t Au from 27.4m (incl. 15m @ 1.53g/t Au from 48m and 16m@ 1.35g/t Au from 69m). Length of Hole - 108.5m. PKDD-3: 15.6m @ 1.67g/t Au from 23.5m (incl. 8.1m @ 2.83g/t Au from 31m) and 18m@ 1.25g/t Au from 86.5m (incl. 6.4m @ 1.76g/t Au from 92.1m). Length of Hole -137.5m. PKDD-4: 4.5m @ 2.55g/t Au from 29.5m (incl. 3m @ 3.6g/t from 29.5) and 8.5m @3.24g/t Au from 62.5m (incl. 4.5m @ 5.83g/t Au from 64m). Length of Hole -80.5m. PKDD-5: 12m @ 1.27g/t Au from 28m (incl. 3m @ 3.62g/t Au from 37m). Length ofHole -100m. PKDD-6: 3m @ 1.02g/t Au from 43m and 7.8m @ 6.46g/t Au from 54m (incl. 2.8m @15.42g/t Au from 59m). Length of Hole - 85m. PKDD-7: 1m @ 3.76g/t from 61m and 2m @1.96g/t from 77m. Length of Hole - 85m. PKDD-8: 1m @ 5.63g/t from 12m and 1m @2.20g/t from 36m. Length of Hole - 89m. PKDD-9: 16.5m @ 0.96g/t Au (incl. 3.5m @ 1.14g/t Au from 56.5m and 6m @ 1.57g/tAu from 63m) terminated in mineralization at 69m due to the ground conditions. PKDD-10: 4m @ 1.99g/t Au. Length of Hole - 82m. PKDD-11: 20m @ 2.65g/t Au (incl. 10m @ 4.4g/t Au from 45m, or 4.5m @ 7.12g/t Aufrom 50.5m). Length of Hole - 71.5m. PKDD-12: 3m @ 5.81 g/t Au from 18m (incl. 2m 8.38 g/t Au from 18m). Length ofHole - 62.5m. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
20th Apr 20153:28 pmBUSResignation of Non-Executive Chairman and Director
16th Apr 20157:00 amBUSOperational Update
31st Mar 20155:13 pmBUSChange of Adviser
19th Mar 20157:00 amBUSIssue of Equity
18th Feb 20157:00 amBUSDirectors' Dealings
17th Feb 20157:00 amBUSDirectors' Dealings
9th Feb 20157:00 amBUSOperational Update
28th Jan 20152:06 pmBUSHong Kong Listing Update
19th Jan 20157:00 amBUSDirectors' Dealings
6th Jan 20151:04 pmBUSHong Kong Listing Update
6th Nov 20144:40 pmRNSSecond Price Monitoring Extn
6th Nov 20144:35 pmRNSPrice Monitoring Extension
28th Oct 20141:13 pmBUSResult of AGM
6th Oct 20147:00 amBUSChina Nonferrous Gold Limited Notice of AGM, Proposals in Relation to Hong Kong Listing and Posting of Delisting Circular
2nd Oct 20143:55 pmBUSIssue of Equity
10th Sep 20142:11 pmBUSInterim Results for the Six-Month Period Ended 30 June 2014
10th Sep 20141:38 pmBUSFiling of Application Proof Prospectus and Update
2nd Sep 20143:23 pmBUSAward of Consultancy Contracts
7th Aug 20141:57 pmBUSHKEx Listing Update
30th Jun 20147:00 amBUSFinal Results
27th Jun 20149:10 amBUSExternal Power Supply Construction Contract
24th Jun 20141:59 pmBUSMine Construction Agreement
13th Jun 20149:43 amBUSDirectorate Change
12th May 20141:54 pmBUSTermination of Option
17th Apr 201411:59 amBUSExploration Licence
9th Apr 20147:00 amBUSIssue of Shares
11th Mar 20147:00 amBUSOperational Update
7th Mar 201412:15 pmBUSResult of Meeting
17th Feb 20147:00 amBUSPosting of Circular
18th Dec 20137:00 amBUSGrant of Options
21st Nov 20137:00 amBUSChange of Name Update
1st Nov 20137:00 amBUSChange of Name Update
29th Oct 20131:27 pmBUSResult of General Meeting and Change of Name
28th Oct 20137:00 amBUSAppointment of Sponsor for Proposed Hong Kong Listing
11th Oct 20139:19 amBUSChange of Name, Notice of General Meeting
30th Sep 20132:55 pmBUSProposed Change of Name and Board Changes
27th Sep 20137:00 amBUSInterim Results for the Six-Month Period Ended 30 June 2013
14th Aug 201310:43 amBUSAWARD OF CONTRACTS FOR FLOTATION CELLS, CRUSHERS AND BALL MILLS - Replacement
14th Aug 20139:35 amBUSMiscellaneous
8th Aug 201310:13 amBUSAWARD OF EXTERNAL POWER SUPPLY CONSTRUCTION CONTRACT
31st Jul 20138:00 amBUSAdmission to Trading on AIM
30th Jul 201312:56 pmBUSCourt Sanction of Scheme
30th Jul 20137:30 amRNSSuspension - Kryso Resources Plc
29th Jul 20139:53 amBUSTemporary Suspension
1st Jul 20137:00 amBUSResult of AGM
17th Jun 20137:00 amBUSSRK’s Independent Technical Report Endorses Updated BFS Compiled by BGRIMM
7th Jun 20135:10 pmBUSFinal Results
24th May 20131:18 pmBUSResults of Voting at Court Meeting and General Meeting
20th May 20131:55 pmBUSHolding(s) in Company
8th May 20137:36 amBUSIntroduction of a New Aim-Listed Holding Company, Incorporated in the Cayman Islands

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.