The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksChina Nonferr Regulatory News (CNG)

  • This share is currently suspended. It was suspended at a price of 0.94

Share Price Information for China Nonferr (CNG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.94
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.94
CNG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

12 Apr 2006 13:04

Kryso Resources PLC12 April 2006 12 April 2006 KRYSO RESOURCES plc DRILLING REPORT Kryso Resources plc ("Kryso" or "the Company") is pleased to announce the firstset of drill results from its exploration diamond drill programme on its 100%owned Pakrut Gold Deposit ("Pakrut") located in the Republic of Tajikistan. Thedeposit is located within the 63sq.km Pakrut Licensed Area within which are theEastern Pakrut, Sulphidnoye and Rufigar prospects. During 2006, Kryso plans to complete its underground drilling programme forfurther evaluation of the Pakrut Gold Deposit and reporting using the guidelinesof the JORC Code. Previously the Soviets had evaluated the deposit and reportedthe tonnes and grade using the Soviet Resource Classification. Three surface holes (PKDD-1, PKDD-2 and PKDD-3) were completed by the end of2005. Subsequently, the Company was able to operate throughout the winter and todate has completed over 1,800m of drilling and over 270m of underground aditdevelopment. This has resulted in the redefinition of the mineralised zones anda better understanding of the structural and geological controls to themineralization. The style of the mineralization at Pakrut appears to beanalogous to other gold deposits found in the region. The three holes drilled from surface were targeted to intersect mineralizationon the edge of the ore zones, while the first series of holes drilled fromunderground were drilled to target the mineralization between the ore zones.Both the initial surface and underground drilling locations were selected toavoid any delay whilst waiting for underground development. As undergrounddevelopment continues, new drill stations will be established so that drillingcan concentrate on the main known ore zones. The Company currently has its twoOnram drill rigs underground and plans are underway to relocate its Longyear rigunderground. As there is difficulty in visually determining the ore zones in the drill core,the Company has set up its own sample preparation and atomic absorptionspectroscopy (AAS) laboratory in Dushanbe, the capital city. Here the entirecore from each hole is prepared and assayed. From these AAS results, theprepared core samples from the identified mineralised zones are currently beingmade ready for shipping to an internationally recognised laboratory where theywill be fire assayed. These assays will then be used for the grade model thatwill be prepared once the drill programme has been completed. The AAS method foranalysing gold is generally accepted as being one of the quickest, but wherecoarse gold is encountered, such as is present at Pakrut, it oftenunderestimates the gold content. To date, the AAS laboratory in Dushanbe hasanalysed over 1000 core samples for gold and silver. Kryso has engaged Snowden Mining Industry Consultants to complete a FeasibilityStudy of the Pakrut deposit and, in addition, a local consultant is currentlyworking on an Environmental Base Line Study of the area. During 2006 the Companyis planning to undertake an extensive surface-trenching programme along with there-sampling of the new and existing underground workings. All references to exploration results have been approved for release by TrevorDavenport, B.Sc, M.Sc, Ph.D, MIMM, C.Eng, Chairman of Kryso, who has more than30 years experience in the mining industry. He has consented to the inclusion ofthe material in the form and context in which it appears. For further information please contact: Kryso Resources plc. Dr. Trevor DavenportTelephone 01481 822972 Vassilios CarellasMobile 07970 756352 The mineralised intersections are listed below. Highlights include: 52.8m @ 1.99 g/t Au in Drillhole PKDD-18.5m @ 3.24 g/t Au in Drillhole PKDD-47.8m @ 6.46 g/t Au in Drillhole PKDD-620m @ 2.65 g/t Au in Drillhole PKDD-11 Mineralised Drillhole Intersections, Pakrut Gold Deposit (AAS analyses from Kryso Laboratory, Dushanbe) PKDD-1: 52.8m @ 1.99g/t Au from 0m (incl. 11.2m @ 4.81g/t Au from 6.8m)terminated in mineralization at 52.8m due to the ground conditions. PKDD-2: 76.1 m @ 0.90g/t Au from 27.4m (incl. 15m @ 1.53g/t Au from 48m and 16m@ 1.35g/t Au from 69m). Length of Hole - 108.5m. PKDD-3: 15.6m @ 1.67g/t Au from 23.5m (incl. 8.1m @ 2.83g/t Au from 31m) and 18m@ 1.25g/t Au from 86.5m (incl. 6.4m @ 1.76g/t Au from 92.1m). Length of Hole -137.5m. PKDD-4: 4.5m @ 2.55g/t Au from 29.5m (incl. 3m @ 3.6g/t from 29.5) and 8.5m @3.24g/t Au from 62.5m (incl. 4.5m @ 5.83g/t Au from 64m). Length of Hole -80.5m. PKDD-5: 12m @ 1.27g/t Au from 28m (incl. 3m @ 3.62g/t Au from 37m). Length ofHole -100m. PKDD-6: 3m @ 1.02g/t Au from 43m and 7.8m @ 6.46g/t Au from 54m (incl. 2.8m @15.42g/t Au from 59m). Length of Hole - 85m. PKDD-7: 1m @ 3.76g/t from 61m and 2m @1.96g/t from 77m. Length of Hole - 85m. PKDD-8: 1m @ 5.63g/t from 12m and 1m @2.20g/t from 36m. Length of Hole - 89m. PKDD-9: 16.5m @ 0.96g/t Au (incl. 3.5m @ 1.14g/t Au from 56.5m and 6m @ 1.57g/tAu from 63m) terminated in mineralization at 69m due to the ground conditions. PKDD-10: 4m @ 1.99g/t Au. Length of Hole - 82m. PKDD-11: 20m @ 2.65g/t Au (incl. 10m @ 4.4g/t Au from 45m, or 4.5m @ 7.12g/t Aufrom 50.5m). Length of Hole - 71.5m. PKDD-12: 3m @ 5.81 g/t Au from 18m (incl. 2m 8.38 g/t Au from 18m). Length ofHole - 62.5m. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
18th Feb 20137:00 amBUSUPDATE ON CONSTRUCTION OF PAKRUT GOLD PROJECT
8th Feb 20137:00 amBUSIssue of Equity
3rd Jan 201310:53 amBUSIssue of Shares
25th Oct 20126:13 pmBUSIssue of Shares
28th Sep 20122:27 pmBUSIssue of Shares
28th Sep 20122:01 pmBUSIssue of Shares
28th Sep 201212:23 pmBUSIssue of Options
19th Sep 20127:00 amBUSHalf-yearly Report
13th Sep 20124:29 pmBUSIssue of Shares
24th Aug 201211:20 amBUSMINE CONSTRUCTION AGREEMENT AWARDED
8th Aug 20126:00 pmBUSIssue of Equity
18th Jul 201212:14 pmBUSIssue of Equity
29th Jun 201211:22 amBUSResults of AGM, Changes to Directors' Offices
7th Jun 20127:00 amBUSFinal Results and Notice of AGM
25th May 20127:00 amBUSConfirmation of Debt Financing and Takeover Code
9th May 20127:00 amBUSTotal JORC Mineral Resource passes 5,000,000 oz Au
2nd Apr 20127:00 amBUSFurther Positive Drilling Results from the Pakrut Licensed Area
29th Mar 20121:53 pmBUSChange of Name of Nominated Advisor
2nd Mar 201210:58 amBUSIssue of Shares
14th Feb 20121:47 pmBUSPakrut Project Debt Financing Approved by Export - Import Bank of China
9th Jan 20127:00 amBUSIssue of Licence/Issue of Shares
23rd Dec 20117:00 amBUSIssue of Shares/Directors Dealing
11th Nov 20114:50 pmBUSIssue of Shares
10th Nov 20117:00 amBUSGovernment Approves Issue of Pakrut Mining Licence
9th Nov 20112:42 pmBUSIssue of Equity
8th Nov 20117:00 amBUSChange of Adviser
27th Oct 201111:57 amBUSHolding(s) in Company
19th Oct 201112:10 pmBUSHolding(s) in Company
18th Oct 201110:18 amBUSHolding(s) in Company
17th Oct 20117:00 amBUSIssue of Shares
14th Oct 201111:58 amBUSHolding(s) in Company
27th Sep 201111:10 amBUSHalf-yearly Report
1st Sep 201112:16 pmBUSOperational Update
9th Aug 201110:40 amBUSIssue of Equity
8th Jul 201112:37 pmBUSIssue of Shares
8th Jul 201111:41 amBUSIssue of Incentive Options
4th Jul 201111:39 amBUSChange of Registered Office
30th Jun 20111:21 pmBUSResult of AGM
24th Jun 20111:17 pmBUSIssue of Equity
9th Jun 20117:00 amBUSFinal Results
5th May 20112:27 pmBUSIssue of Equity
15th Apr 20117:00 amBUSTotal JORC Resources Increased
8th Apr 20117:00 amBUSChange of Nomad
31st Mar 20112:46 pmBUSTotal Voting Rights
24th Mar 20117:00 amBUSUpdate on progress and appointment of COO
22nd Mar 20117:00 amBUSDrilling Report
15th Mar 201112:42 pmBUSIssue of Shares
8th Mar 20117:00 amBUSOffer of Finance
4th Mar 20113:14 pmBUSIssue of Equity
4th Feb 20112:51 pmBUSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.