Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

Share Price is delayed by 15 minutes
Get Live Data
2.10    0.00 (0.00%)
Bid:
2.00
Ask:
2.20
Spread: 0.20 (10.00%)
Market Cap: £49.48m
CASP Live PriceLast checked at - London Stock Exchange

Intraday Caspian Sunrise Share Chart

Operational Update

14 Nov 2013 07:00

RNS Number : 9840S
Roxi Petroleum Plc
14 November 2013
 



 

 

Roxi Petroleum plc

("Roxi" or "the Company")

Operational update

 

Roxi, the Central Asian oil and gas company with a focus on Kazakhstan, is pleased to update the market with progress at its flagship asset BNG.

 

Background

 

Contract Area

 

Roxi has a 58.41% interest in the BNG Contract Area, which is located in the west of Kazakhstan 40 kilometres southeast of Tengiz on the edge of the Mangistau Oblast. The Contract Area covers 1,561 square kilometres of which 1,376 square kilometres has 3D seismic coverage acquired in 2009 and 2010. Roxi resumed full control of BNG Ltd LLP in the second quarter of 2011.

 

The Contract Area has both shallow and deep prospects, which Roxi is funded to explore and develop following the US$40 million equity funding commitment in January 2013.

 

2013 Development activity

 

In previous periods Roxi developed a number of the shallow prospects to the point of testing in the South Yelemes portion of the BNG Contract Area. In March and April 2013, testing took place at Wells 54 and 805 at gross rates of 219 bopd and 120 bopd respectively.

 

Pilot production from these wells will commence on receipt of the relevant permits, which are expected before the end of the year.

 

Deep Wells

 

As previously announced, BNG Ltd LLP plans to drill 5 deep wells before the expiry of the existing licence in June 2015, with the locations of the first two deep wells already identified.

 

The first deep well, designated Well A5, is to be drilled to an estimated depth of 4,700 meters. It was spudded in July 2013 and is targeting the Permian formation at 4,120 meters and the Carboniferous formation at 4,390 meters. From seismic analysis the salt layer, which is expected to be some 100 meters thick will be encountered at around 3,800 meters.

 

As of 3 November Well A5 had reached a depth of 3,060 meters without material incident. It has been logged to that depth and intermediate casing was run. Once the cementing work has been completed drilling will resume. Based on progress to date it is now expected that Total Depth will be reached early in the New Year.

 

As BNG has a turn-key drilling contract for Well A5 and will therefore not be subject to any cost overruns stemming from drilling delays.

 

Shallow wells

 

Well 143

 

Well 143 was spudded on 1 April 2013, on the MJ-F structure located towards the North of South Yelemes field at BNG. The total depth of the well was planned to be 2,500 metres.

This exploration initially targeted Jurassic Callovian sands at a depth of 2,170 metres with a secondary objective in the Cretaceous Valanginian limestone at a depth of 1,935 metres.

 

As the middle Jurassic section is also expected to be within 4-way dip closure in the MJ-F structure as well as the top Jurassic section, Roxi decided to drill continuously to 2,750 meters, 250 meters deeper than the original planned depth. The well reached the total depth of 2,750 meters in June 2013, and at that time wireline logging was run.

 

Interpretation of these results has been encouraging with three main intervals of interest were identified, between 2,193, 2,216 and 2,692 meters. Additionally, a fourth interval of interest at 2,088 meters has been identified from the core samples and will now be tested.

 

Testing on all four intervals is set to commence once the rig currently testing Well 806 has been released.

 

Well 805

 

In 2010 Well 805 was drilled to a total depth of 2,505 meters and tested two hydrocarbon-bearing zones between 1,965 meters and 2,230 meters at the rate of 150 bopd and 226 bopd respectively. In April 2013, testing took place at Well 805 at gross rates of 120 bopd.

 

Well 806

 

In 2010 Well 806 was spudded and drilled to a total depth of 2,557 meters. The well tested oil at three different intervals at 1,985, 1,998 and 2,022 meters at rates up to 130 bopd. A 90-day test of this well is planned to commence later this month. Once completed the work-over rig testing rig will be moved to Well 413 to conduct a further 90-day test.

 

Well 807

 

Well 807, which is to be drilled to a Total Depth of 2,500 meters targeting Cretaceous Limestone and Jurassic Sandstone, was spudded in September 2013 and as of 12 November had reached a depth of 1,900 meters without material incident. Drilling has paused to allow core samples to be taken. It is now expected that the well will reach Total Depth early in the New Year.

 

 

Summary

 

While progress at both the deep and shallow wells has been slower than originally expected significant progress has been made without material difficulties.

 

In recent months Roxi has been funding development costs from pre sales of oil and it also has $22.5 million of funds remaining from its $40 equity facility issuable at a price of 7.41p per share .

 

The potentially value transforming results from the first of Roxi's deep wells are now expected early in the New Year.

 

 

Comments:

 

Clive Carver, Chairman said

 

"While progress has been slower than expected we are pleased that there has been no material issues with the first deep well and we now expect to reach Total Depth early in the New Year. The Company is well funded to continue with its ambitious drilling programme and looks forward to updating the market early in the New Year with drilling results. The key determinant of the true value of this field will be the results from the deep wells."

 

Enquiries

 

Roxi Petroleum PLC

Clive Carver, Chairman +7 727 3750 202

 

WH Ireland plc

James Joyce / James Bavister +44 (0) 20 7220 1666

 

 

Qualified Person

 

Mr. Hyunsik Jang, Chief Operating Officer of the Company, has reviewed and approved the technical disclosures in this announcement. He holds a BSc in Geology and has 25 years of international experience of exploration, appraisal and development of oilfields in a variety of environments.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBIBDBCBBBGXX
Date   Source Headline
4th Nov 200911:27 amRNSGalaz Update
3rd Nov 20092:50 pmRNSIssue of equity
30th Oct 20098:32 amRNSOperations Update
29th Oct 200912:12 pmRNSNotice of GM & Part Disposal
5th Oct 20092:00 pmRNSExtension of MOU
28th Sep 20097:00 amRNSInterim Results
22nd Sep 20095:01 pmRNSIssue of Equity
22nd Sep 20097:00 amRNSDirectorate Change
19th Aug 20093:45 pmRNSShareholder Notification
17th Aug 20093:30 pmRNSGrant of Options
12th Aug 200911:22 amRNSResult of General Meeting
3rd Aug 20097:00 amRNSChange of Nominated Adviser and Broker
31st Jul 200910:05 amRNSChange of Registered Address
29th Jul 200911:21 amRNSResult of AGM
29th Jul 20099:43 amRNSAGM Presentation
27th Jul 20097:00 amRNSShareholder Circular
17th Jul 200910:15 amRNSCorporate update
2nd Jul 20096:05 pmRNSHolding(s) in Company
2nd Jul 20096:00 pmRNSTotal Voting Rights
2nd Jul 20095:49 pmRNSDirector's Dealings
29th Jun 20097:00 amRNSFinal Results
25th Jun 200911:00 amRNSHolding(s) in Company
18th Jun 20092:30 pmRNSUS$5 million additional funding from Arawak
3rd Jun 20097:00 amRNSFunding & Operational Update
28th May 200912:30 pmRNSResult of General Meeting
19th May 20097:00 amRNSFunding and License Update
12th May 20098:46 amRNSOperational Update
14th Apr 20097:04 amRNSFunding and Operational Update
12th Feb 20099:00 amRNSFunding Update
9th Feb 20097:00 amRNSFunding and Operational Update
19th Jan 20097:00 amRNSFarm Out and Operational Update
22nd Dec 200811:00 amRNSResult of General Meeting
19th Dec 200810:30 amRNSDrilling success
4th Dec 20089:00 amRNSNotice of General Meeting
28th Nov 20083:01 pmRNSTotal Voting Rights
19th Nov 200811:30 amRNSFunding and Operations Update
13th Oct 20082:12 pmRNSHolding(s) in Company
8th Oct 20085:30 pmRNSHolding(s) in Company
29th Sep 20087:00 amRNSInterim Results
26th Sep 20087:00 amRNSFarm out update
2nd Sep 20082:35 pmRNSDirectorate Change
28th Aug 20087:00 amRNSFunding and Operational Updat
18th Jul 20081:00 pmRNSResult of AGM
18th Jul 20089:45 amRNSAGM Statement
24th Jun 20085:44 pmRNSPosting of Annual Report
17th Jun 20087:00 amRNSFinal Results
9th Jun 200810:40 amRNSHolding(s) in Company
28th May 20083:18 pmRNSHolding(s) in Company
19th May 20087:01 amRNSOperations Update
7th May 20087:18 amRNSExtension of Contract

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.