The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.525
Bid: 1.45
Ask: 1.60
Change: 0.15 (10.91%)
Spread: 0.15 (10.345%)
Open: 1.375
High: 1.55
Low: 1.375
Prev. Close: 1.375
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

New Gold-Silver Intersections at the Jelai Project

17 Sep 2012 07:00

Kalimantan Gold Corporation ("KLG") is pleased to announce new gold-silver results returned from recent drilling by Tigers Realm Metals ("TRM") as part of their first stage exploration activities on the Jelai Epithermal Project. The northwest quadrant of the Jelai IUP license hosts at least three discrete, sub-parallel, north-south trending epithermal structures, the Mewet, Sembawang and Nyabi vein systems.

A program of 11 holes (all drilled towards the East), for 3,129.4m of drilling, has been completed. Drill holes targeted high grade shoots at deeper levels of the epithermal gold - silver vein systems at north Mewet, north Sembawang, south Sembawang and along the untested central and southern extensions of the Nyabi vein system.

Mewet

A total of eight TRM holes have tested 400 meters of strike length along the North Mewet vein system, to depths of up to 300 meters. All assays have been received assays have been received for the Mewet (MEW series) drill holes.

Sembawang

Two holes have been drilled along the Sembawang vein system to date. A single hole drilled at the northern end of the Sembawang vein, near the summit of Bukit Cinta, and the second hole tested the southern limits of the mapped portion of the vein. Assays have been received for north Sembawang DDH (SEM6700-01), and pending for south Sembawang DDH (SEM5700-01).

Nyabi

The first hole targeted a strong gold in soil geochemical anomaly defined at the poorly exposed southern strike extension of the Nyabi vein. A second hole is currently underway, targeting the central portions of the Nyabi structure where three interpreted veins (i.e. linear ridges) intersect. Assay results from the first hole are pending.

Results from TRM drilling are listed in Table 1, and are now being analyzed by KLG's consulting geologist and conclusions will be released as soon as they are available.

Table 1. Significant assays for TRM drill holes

Hole Dip From (m) To (m) Interval (m) Au(g/t) Ag(g/t)
MEW6300-01 -67 No Significant Assays
MEW6400-01 -61 226.0 228.6 2.60 0.51 n/a
MEW6500-01 -61 198.0 203.5 5.50 2.73 6.3
incl. 199.0 202.1 3.10 4.02 10.2
incl. 201.5 202.1 0.60 12.80 40.1
MEW6500-02 -74 249.0 250.0 1.00 1.47 1.3
MEW6600-01 -56 61.8 66.5 4.70 1.72 18.4
incl. 63.8 65.9 2.10 2.42 30.0
MEW6600-01 -56 72.0 77.0 5.00 0.69 1.4
MEW6600-02 -50 161.4 164.3 2.90 5.16 12.3
incl. 162.8 164.3 1.50 8.43 21.7
MEW6600-02 -50 176.0 180.0 4.00 0.92 0.8
MEW6600-02 -50 185.0 186.0 1.00 1.36 0.8
MEW6600-02 -50 200.0 215.0 15.00 0.37 0.4
incl. 209.0 213.0 4.00 0.83 0.5
MEW6600-03 -70 No Significant Assays
MEW6700-01 -65 No Significant Assays
SEM6700-01 -45 No Significant Assays
SEM5700-01 -45 Assays Pending
NYA5900-01 -45 Assays Pending
NYA6225-01 Drilling in Progress

Drill intercept lengths only are reported in the tabulations; it is estimated that true width will be less than the reported drill intercept length.

Figure 1: Jelai IUP, showing TRM drill hole locations

To view Figure 1, click onto the link below or copy and paste into your browser:http://www.usetdas.com/maps/kalimantan/klgsept17003.jpg

Figure 2: Jelai IUP, showing prospect locations

To view Figure 2, click onto the link below or copy and paste into your browser:http://www.usetdas.com/maps/kalimantan/klgsept17004.jpg

Community Programs

The current Corporate & Social Responsibility ("CSR") livelihood activities of KLG include three main activities - vegetable gardens, fish ponds and rubber seedling nurseries - for which interest groups have been established. These are based in the villages of Bunau and Terindak. Each village has made an annual development plan and elected a management group to implement the plan.

The vegetable group has been harvesting produce from the plot and selling into the local market. The success of this is attracting others to join in the activity. The ponds have been stocked with catfish fingerlings that are growing well and being managed by each village. The two rubber groups in each village have established a nursery plot and planted rootstock for grafting. Experts from this village have begun providing training to the rubber groups.

In Mewet village, close to the exploration camp, the CSR program is also supporting the provision of mother and child care by the subdistrict health clinic. Malnutrition and tuberculosis are serious concerns and this is the first time they have had access to professional health care.

All data, as disclosed in this press release, has been reviewed and verified by the Company's Qualified Person for the Jelai Project, Dr. Peter Pollard, who acts as a technical consultant to KLG and is a consulting economic geologist with over 20 years experience.

About Kalimantan Gold

Kalimantan Gold Corporation Limited is a junior exploration company listed on both the TSX Venture Exchange in Canada and on AIM in London. The Company has two exploration projects in Kalimantan: the Jelai epithermal gold project in East Kalimantan (which is optioned to Tigers Realm Metals Pty Ltd) and the KSK Contract of Work in Central Kalimantan with multiple porphyry copper and gold prospects. For further information please visit www.kalimantan.com

To view Figure 3, click onto the link below or copy and paste into your browser:http://www.usetdas.com/maps/kalimantan/klgsept17005.jpg

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

Kalimantan GoldFaldi IsmailDeputy Chairman and CEOMobile: +61 (0) 423 206 324faldi.ismail@kalimantan.com\orCorporate Development (UK)Gerald Cheyne, +44 (0) 2077311806Mobile: +44 (0) 7717473168gerald.cheyne@kalimantan.comorVSA Capital LimitedNick Redfern / Peter Damouni, +44 20 3005 5005 / +44 20 3005 5007pdamouni@vsacapital.comorKLG's Nominated AdviserRFC Ambrian LimitedStuart Laing, +61 8 9480 2506stuart.laing@rfcambrian.com

Copyright Business Wire 2012

Date   Source Headline
10th Dec 20194:40 pmRNSSecond Price Monitoring Extn
10th Dec 20194:35 pmRNSPrice Monitoring Extension
10th Dec 20197:00 amRNSCompany Update
26th Nov 20197:00 amRNSKSK Exploration Update
13th Nov 201910:00 amRNSIssue of Shares to Consultant
12th Nov 20197:00 amRNSDirector Purchase of Shares
14th Oct 201911:50 amRNSManagement Update Call
10th Oct 201912:20 pmRNSExercise of Options
23rd Sep 201912:20 pmRNSDirector Purchase of Shares
19th Sep 201910:01 amRNSExercise of Options
19th Sep 20197:00 amRNSPublic infrastructure upgrades improve BKM project
13th Sep 20197:00 amRNS2019 Interim Financial Statements
21st Aug 20197:00 amRNSsigns MoU with China Nonferrous Metals
20th Aug 20197:20 amRNSSuccessful Placing of US$ 2.1 million
17th Jul 20197:00 amRNSReceives Environmental Approval for BKM Project
10th Jul 20197:05 amRNSDirector Appointment
1st Jul 20194:00 pmRNSIssue of Director Performance Rights
27th Jun 20197:00 amRNSNew Corporate Presentation
25th Jun 20191:30 pmRNSResults of AGM
14th Jun 20194:40 pmRNSSecond Price Monitoring Extn
14th Jun 20194:35 pmRNSPrice Monitoring Extension
14th Jun 20191:30 pmRNSIssue of Warrants
14th Jun 20197:00 amRNSFeasibility Study Confirms Robust Copper Project
14th Jun 20197:00 amRNSBKM Maiden Ore Reserve
14th Jun 20197:00 amRNSUpdates BKM Copper Resource
30th May 20194:30 pmRNSNotice of Annual General Meeting
28th May 20199:05 amRNSSecond Price Monitoring Extn
28th May 20199:00 amRNSPrice Monitoring Extension
28th May 20197:15 amRNS2018 Annual Report & Financial Statements
28th May 20197:14 amRNSPrivate Placement to Strategic Investor
29th Apr 20194:00 pmRNSExercise of Options
16th Apr 201911:45 amRNSExercise of Warrants
16th Apr 20197:00 amRNSStrong Copper Results from BKM Drilling
2nd Apr 20198:35 amRNSParticipates at Mines and Money Asia Conference
25th Mar 20197:06 amRNSUpdates Beutong Copper-Gold Resource
20th Mar 20197:00 amRNSBFS drilling results strengthen BKM Resource
11th Mar 201910:45 amRNSExercise of Options
7th Mar 20197:00 amRNSReceives Key Approvals for BKM Copper Project
19th Feb 20197:00 amRNSBKM Project - BFS Drilling Advances to Plan
13th Feb 20199:36 amRNSHolding in Company - JP Morgan Asset Management
25th Jan 20197:14 amRNSBFS Drilling Progressing To Schedule
2nd Jan 20195:45 pmRNSExercise of Broker Warrants
18th Dec 20188:13 amRNSBKM Copper Project BFS Update
29th Nov 20187:00 amRNSSuccessful Placing of approximately US$3.3 Million
28th Nov 20182:00 pmRNSProposed Placing to raise up to US$3.3 million
23rd Nov 20187:39 amRNSAsiamet Exhibition Details for Mines and Money
14th Nov 20187:00 amRNSAsiamet Initiates Additional BKM Feasibility Works
31st Oct 20183:48 pmPRNCorrection : Form 8.3 - Barrick Gold Corporation
31st Oct 20187:00 amPRNForm 8.3 - Barrick Gold Corporation
18th Oct 20181:40 pmRNSResponse to social media article

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.