The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.10 (8.333%)
Open: 1.25
High: 1.275
Low: 1.25
Prev. Close: 1.25
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

New Gold-Silver Intersections at the Jelai Project

17 Sep 2012 07:00

Kalimantan Gold Corporation ("KLG") is pleased to announce new gold-silver results returned from recent drilling by Tigers Realm Metals ("TRM") as part of their first stage exploration activities on the Jelai Epithermal Project. The northwest quadrant of the Jelai IUP license hosts at least three discrete, sub-parallel, north-south trending epithermal structures, the Mewet, Sembawang and Nyabi vein systems.

A program of 11 holes (all drilled towards the East), for 3,129.4m of drilling, has been completed. Drill holes targeted high grade shoots at deeper levels of the epithermal gold - silver vein systems at north Mewet, north Sembawang, south Sembawang and along the untested central and southern extensions of the Nyabi vein system.

Mewet

A total of eight TRM holes have tested 400 meters of strike length along the North Mewet vein system, to depths of up to 300 meters. All assays have been received assays have been received for the Mewet (MEW series) drill holes.

Sembawang

Two holes have been drilled along the Sembawang vein system to date. A single hole drilled at the northern end of the Sembawang vein, near the summit of Bukit Cinta, and the second hole tested the southern limits of the mapped portion of the vein. Assays have been received for north Sembawang DDH (SEM6700-01), and pending for south Sembawang DDH (SEM5700-01).

Nyabi

The first hole targeted a strong gold in soil geochemical anomaly defined at the poorly exposed southern strike extension of the Nyabi vein. A second hole is currently underway, targeting the central portions of the Nyabi structure where three interpreted veins (i.e. linear ridges) intersect. Assay results from the first hole are pending.

Results from TRM drilling are listed in Table 1, and are now being analyzed by KLG's consulting geologist and conclusions will be released as soon as they are available.

Table 1. Significant assays for TRM drill holes

Hole Dip From (m) To (m) Interval (m) Au(g/t) Ag(g/t)
MEW6300-01 -67 No Significant Assays
MEW6400-01 -61 226.0 228.6 2.60 0.51 n/a
MEW6500-01 -61 198.0 203.5 5.50 2.73 6.3
incl. 199.0 202.1 3.10 4.02 10.2
incl. 201.5 202.1 0.60 12.80 40.1
MEW6500-02 -74 249.0 250.0 1.00 1.47 1.3
MEW6600-01 -56 61.8 66.5 4.70 1.72 18.4
incl. 63.8 65.9 2.10 2.42 30.0
MEW6600-01 -56 72.0 77.0 5.00 0.69 1.4
MEW6600-02 -50 161.4 164.3 2.90 5.16 12.3
incl. 162.8 164.3 1.50 8.43 21.7
MEW6600-02 -50 176.0 180.0 4.00 0.92 0.8
MEW6600-02 -50 185.0 186.0 1.00 1.36 0.8
MEW6600-02 -50 200.0 215.0 15.00 0.37 0.4
incl. 209.0 213.0 4.00 0.83 0.5
MEW6600-03 -70 No Significant Assays
MEW6700-01 -65 No Significant Assays
SEM6700-01 -45 No Significant Assays
SEM5700-01 -45 Assays Pending
NYA5900-01 -45 Assays Pending
NYA6225-01 Drilling in Progress

Drill intercept lengths only are reported in the tabulations; it is estimated that true width will be less than the reported drill intercept length.

Figure 1: Jelai IUP, showing TRM drill hole locations

To view Figure 1, click onto the link below or copy and paste into your browser:http://www.usetdas.com/maps/kalimantan/klgsept17003.jpg

Figure 2: Jelai IUP, showing prospect locations

To view Figure 2, click onto the link below or copy and paste into your browser:http://www.usetdas.com/maps/kalimantan/klgsept17004.jpg

Community Programs

The current Corporate & Social Responsibility ("CSR") livelihood activities of KLG include three main activities - vegetable gardens, fish ponds and rubber seedling nurseries - for which interest groups have been established. These are based in the villages of Bunau and Terindak. Each village has made an annual development plan and elected a management group to implement the plan.

The vegetable group has been harvesting produce from the plot and selling into the local market. The success of this is attracting others to join in the activity. The ponds have been stocked with catfish fingerlings that are growing well and being managed by each village. The two rubber groups in each village have established a nursery plot and planted rootstock for grafting. Experts from this village have begun providing training to the rubber groups.

In Mewet village, close to the exploration camp, the CSR program is also supporting the provision of mother and child care by the subdistrict health clinic. Malnutrition and tuberculosis are serious concerns and this is the first time they have had access to professional health care.

All data, as disclosed in this press release, has been reviewed and verified by the Company's Qualified Person for the Jelai Project, Dr. Peter Pollard, who acts as a technical consultant to KLG and is a consulting economic geologist with over 20 years experience.

About Kalimantan Gold

Kalimantan Gold Corporation Limited is a junior exploration company listed on both the TSX Venture Exchange in Canada and on AIM in London. The Company has two exploration projects in Kalimantan: the Jelai epithermal gold project in East Kalimantan (which is optioned to Tigers Realm Metals Pty Ltd) and the KSK Contract of Work in Central Kalimantan with multiple porphyry copper and gold prospects. For further information please visit www.kalimantan.com

To view Figure 3, click onto the link below or copy and paste into your browser:http://www.usetdas.com/maps/kalimantan/klgsept17005.jpg

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

Kalimantan GoldFaldi IsmailDeputy Chairman and CEOMobile: +61 (0) 423 206 324faldi.ismail@kalimantan.com\orCorporate Development (UK)Gerald Cheyne, +44 (0) 2077311806Mobile: +44 (0) 7717473168gerald.cheyne@kalimantan.comorVSA Capital LimitedNick Redfern / Peter Damouni, +44 20 3005 5005 / +44 20 3005 5007pdamouni@vsacapital.comorKLG's Nominated AdviserRFC Ambrian LimitedStuart Laing, +61 8 9480 2506stuart.laing@rfcambrian.com

Copyright Business Wire 2012

Date   Source Headline
9th May 202411:45 amRNS2023 Annual Report & Financial Statements
17th Apr 20247:00 amRNSBKM High Grade Copper Rock Sample Results
28th Mar 20247:00 amRNSBKM Project Engineering Design & Execution Update
27th Mar 20247:00 amRNSSustainable Power Solution for BKM Copper Project
1st Mar 20247:04 amRNSCorporate Update
28th Dec 20237:00 amRNSEnd of Year Project Status Update
20th Dec 20232:30 pmRNSShare Purchase by CEO
15th Nov 20237:00 amRNSStrategic c.US$4.0 million Financing
30th Oct 20237:05 amRNSCorporate Update
30th Oct 20237:05 amRNSBoard Changes
6th Oct 20237:00 amRNSCorporate Update
27th Sep 20238:15 amRNS2023 Interim Report & Financial Statements
22nd Sep 20237:00 amRNSBoard Changes
1st Sep 20237:00 amRNSChange of Nominated Adviser
11th Aug 20231:46 pmRNSCorrection - Director Fees and Employee Payments
8th Aug 20238:10 amRNSCorporate Update – Project Financing
13th Jul 20233:00 pmRNSDirectors Fees and Employee Incentive Payments
27th Jun 20237:45 amRNSNotification of Major Shareholding
23rd Jun 20237:10 amRNSExecutive Chairman IGTV Interview
13th Jun 20233:55 pmRNSResult of AGM
12th Jun 20237:15 amRNSCorporate Update - Advisors Appointed
19th May 20238:25 amRNSShare Purchase by CEO
12th May 20235:00 pmRNSNotice of Annual General Meeting
10th May 202310:30 amRNSUpdated BKM FS Delivers Excellent Economics
10th May 202310:30 amRNSUpdated BKM Ore Reserve
27th Apr 20233:58 pmRNS2022 Annual Report & Financial Statements
6th Apr 202311:30 amRNSCEO Podcast – Feasibility Study progress
29th Mar 202311:06 amRNS121 Conference Hong Kong Investor Presentation
20th Mar 20237:00 amRNSBKM Copper Project Update - Capital Cost Estimate
10th Feb 20237:00 amRNSBKM Copper Project FS Activities Update
13th Jan 20232:05 pmRNSSecond Price Monitoring Extn
13th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSMoU signed with BGRIMM Technology Group
30th Dec 20227:00 amRNSBusiness Update & 2022 Overview
9th Dec 202212:45 pmRNSShare Purchase by CEO
30th Nov 20222:15 pmRNSShare Purchase by CEO
25th Nov 20223:16 pmEQSAsiamet Resources CEO talks latest work on updated feasibility study for BKM copper project
18th Nov 202210:00 amRNSMines and Money Conference and Investor Evening
18th Nov 20227:00 amRNS2022 FS Update Life of Mine Production Physicals
15th Nov 20221:40 pmRNSHolding(s) in Company
14th Nov 20227:00 amRNSPositive Results for Key Inputs to 2022 FS Update
7th Nov 20229:30 amRNSPT Delta Dunia Makmur Increases Strategic Stake
20th Oct 20227:00 amRNSBKM Copper Project Power Solution Progressing
26th Sep 20229:39 amRNSCEO Video Presentation
24th Aug 202211:11 amRNSCEO Video Presentation – Feasibility Study Update
17th Aug 202210:45 amRNSInterim Report & Financial Statements
25th Jul 20222:15 pmRNS2021 Directors Fees
13th Jul 20226:00 pmRNSResult of AGM
6th Jul 20227:00 amRNSAnnual General Meeting – Update
29th Jun 20227:00 amRNSDOID Diligence for BKM Copper Project Complete

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.