ARS Live PriceLast checked at - London Stock Exchange

Intraday Asiamet Resources Limited Share Chart

BKM Project - BFS Drilling Advances to Plan

19 Feb 2019 07:00

RNS Number : 4545Q
Asiamet Resources Limited
19 February 2019
 

 

For Immediate Release London AIM

 

19 February 2019 Symbol: ARS

 

 

Asiamet BKM Project - BFS Drilling Advances to Plan

 

Asiamet Resources Limited ("ARS" or the "Company") is pleased to advise that additional Resource evaluation drilling as part of the Bankable Feasibility Study ("BFS") on the Beruang Kanan Main ("BKM") copper deposit in Central Kalimantan, Indonesia continues to intersect broad intervals of copper mineralisation with discrete high grade intervals, at both the Northern and Southern area with individual samples (1-metre intervals) assaying up to 3.99% copper. 

A total 35 holes for 4,898 metres of diamond core drilling have now been completed with five holes including four geotechnical holes are currently in progress. The geotechnical holes are being drilled along the proposed western pit wall to more fully assess the rock properties and structural characteristics in this area with a view to re-evaluating the current pit design and enhancing overall project economics.

 

Highlights from the most recent drilling include:

BKM32540-01 34.75 metres at 0.94% Cu from 1.25m depth

· Including 3.00 metres at 1.58% Cu from 12.00m depth

74.80 metres at 0.43% Cu from 57.20m depth

· Including 2.00 metres at 1.50% Cu from 123.00m depth

· Including 2.00 metres at 1.68% Cu from 128.00m depth

 

BKM32490-01 12.50 metres at 1.26% Cu from 17.00m depth

16.00 metres at 0.57% Cu from 45.50m depth

33.00 metres at 0.61% Cu from 75.00m depth

90.00 metres at 0.98% Cu from 111m depth

· Including 23.00m at 1.56% Cu from 153.00m depth

 

BKM31500-02 49.50 metres at 0.55% Cu from 51m depth

· Including 8.0 metres at 1.44% Cu from 60.00m depth

 

BKM31500-04 24.00 metres at 0.46% Cu from 76.5m depth

 

Holes BKM31500-02, BKM31500-03, BKM41500-04, BKM31500-05, BKM31550-07, BKM31600-07 were drilled in the southern and south-western part of the proposed pit shell area, while holes BKM32490-01 and BKM32540-01 were drilled in the northern and central north-eastern area.

Drilling results from BKM31500-02 and BKM31500-04 at the southern end of the proposed pit design open the possibility that that copper mineralisation may extend south of the existing resource.

Results from BKM32490-01 and BKM32540-01 drilled to 201.00 metres and 150.10 metres respectively, confirmed near-surface high-grade mineralisation associated with strong quartz-chalcocite-covellite veining.

 

 

Peter Bird, Asiamet Chief Executive Officer commented:

 

"Along with these most recent results, Asiamet is pleased to report the drilling programme to enhance geological and geotechnical inputs into the BKM BFS open pit mine design has been progressing extremely well. In line with expectations, wide intervals of shallow high-grade mineralisation have reported in the north of the planned pit shell while moderate intervals of medium grade copper mineralisation have been intersected in the south. Mineralisation continues from surface to depth in the northern part of the proposed pit and infill drilling highlighted potential for modest extensions around the southern margin of the deposit.

Data collected from this limited drilling combined with a rework of the pit design aims to upgrade and capture Inferred Resources currently sitting inside and on the edges of the pit shells into the mine plan. A successful outcome from this work is expected to significantly enhance project economics and the robustness of the BKM BFS ahead of project financing.

With a great deal of the drilling programme now complete, we expect to be reporting further results as they are received and ultimately feeding into the BFS for its completion. In addition to the ongoing technical programme, other environmental and corporate work streams are also being advanced at pace and we look forward to providing further updates as they become available." 

Qualified Person

Technical data disclosed in this press release have been reviewed and verified by ARS's qualified person, Stephen Hughes, P. Geo, an advisor to the Company and a Qualified Person within the meaning of NI 43-101 and for the purposes of the AIM Rules for Companies.

 

ON BEHALF OF THE BOARD OF DIRECTORS

Peter Bird, Deputy Chairman and CEO

For further information, please contact:

-Ends-

 

Peter BirdDeputy Chairman and CEO, Asiamet Resources LimitedTelephone: +61 3 8644 1300Email: peter.bird@asiametresources.com

 

Tony ManiniExecutive Chairman, Asiamet Resources LimitedTelephone: +61 3 8644 1300Email: tony.manini@asiametresources.com

 

FlowComms Limited

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com 

Asiamet Resources Nominated Adviser

RFC Ambrian Limited

Andrew Thomson / Stephen Allen

Telephone: +61 8 9480 2500

Email: Andrew.Thomson@rfcambrian.com / Stephen.Allen@rfcambrian.com 

 

Berenberg

Matthew Armitt, Detlir Elezi

Telephone: +44 20 3753 3142

Email: Matthew.Armitt@berenberg.com / Detlir.Elezi@berenberg.com 

 

Liberum

Clayton Bush, Kane Collings

Telephone: +44 7773 322679

Email: Clayton.Bush@Liberum.com

 

Optiva Securities Limited

Christian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

 

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014 ("MAR").

 

Table 1: Recent drill intercepts

Hole ID

From (m)

To (m)

Length (m)

Cu (%)

BKM31500-02

51.00

100.50

49.50

0.55

includes

60.00

68.00

8.00

1.44

BKM31500-03

28.50

29.50

1.00

0.33

BKM31500-03

39.50

41.50

2.00

0.25

BKM31500-03

53.50

56.50

3.00

0.83

BKM31500-04

25.00

26.00

1.00

0.27

BKM31500-04

56.00

57.00

1.00

0.80

BKM31500-04

76.50

100.50

24.00

0.46

BKM31500-05

9.00

10.00

1.00

0.37

BKM31550-07

20.00

21.00

1.00

0.21

BKM31550-07

23.00

24.00

1.00

0.56

BKM31550-07

25.00

26.00

1.00

0.32

BKM31600-07

15.50

17.50

2.00

0.25

BKM31600-07

31.50

32.50

1.00

0.36

BKM31600-07

47.50

49.50

2.00

0.85

BKM31600-07

54.50

55.50

1.00

0.97

BKM32490-01

17.00

29.50

12.50

1.26

BKM32490-01

45.50

61.50

16.00

0.57

includes

46.00

48.00

2.00

2.35

BKM32490-01

75.00

108.00

33.00

0.61

BKM32490-01

111.00

201.00

90.00

0.98

includes

153.00

176.00

23.00

1.56

includes

181.00

185.00

4.00

2.07

includes

188.00

194.00

6.00

1.46

BKM32540-01

1.25

36.00

34.75

0.94

includes

12.00

15.00

3.00

1.58

includes

24.00

28.00

4.00

1.36

BKM32540-01

40.00

42.00

2.00

0.70

BKM32540-01

51.00

53.00

2.00

0.27

BKM32540-01

57.20

132.00

74.80

0.43

includes

106.00

108.00

2.00

1.23

includes

115.00

116.00

1.00

1.17

includes

123.00

125.00

2.00

1.50

includes

128.00

130.00

2.00

1.68

BKM32540-01

140.00

141.00

1.00

0.32

 

Figure 1: Map showing drilling locationhttp://www.rns-pdf.londonstockexchange.com/rns/4545Q_1-2019-2-19.pdf

 

 

Glossary of Technical Terms

"anomaly or anomalous"

something in mineral exploration that geologists interpret as deviating from what is standard, normal, or expected.

"assay"

The laboratory test conducted to determine the proportion of a mineral within a rock or other material. For copper, usually reported as percentage which is equivalent to percentage of the mineral (i.e. copper) per tonne of rock.

"azimuth"

the "compass direction" refers to a geographic bearing or azimuth as measured by a magnetic compass, in true or magnetic north.

"bornite"

Bornite, also known as peacock ore, is a copper sulphide mineral with the formula Cu5FeS4.

"breccia"

Breccia is a rock classification, comprises millimetre to metre-scale rock fragments cemented together in a matrix, there are many sub-classifications of breccias.

"chalcocite"

Chalcocite is a copper sulphide mineral with the formula Cu2S and is an important copper ore mineral. It is opaque and dark-gray to black with a metallic luster.

"chalcopyrite"

Chalcopyrite is a copper sulphide mineral with formula CuFeS2. It has a brassy to golden yellow colour.

"channel sample"

Samples collected across a mineralised rock exposure. The channel is typically orientated such that samples are collected perpendicular to the mineralised structure, if possible.

"chargeability"

Chargeability is a physical property related to conductivity. Chargeability is used to characterise the formation and strength of the induced polarisation within a rock, under the influence of an electric field, suggesting sulphide mineralisation at depth.

"CIM"

The reporting standard adopted for the reporting of the Mineral Resources is that defined by the terms and definitions given in the terminology, definitions and guidelines given in the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Mineral Reserves (December 2005) as required by NI 43-101. The CIM Code is an internationally recognised reporting code as defined by the Combined Reserves International Reporting Standards Committee.

"covellite"

Covellite is a copper sulphide mineral with the formula CuS. This indigo blue mineral is ubiquitous in some copper ores.

"diamond drilling"

A drilling method in which penetration is achieved through abrasive cutting by rotation of a diamond encrusted drill bit. This drilling method enables collection of tubes of intact rock (core) and when successful gives the best possible quality samples for description, sampling and analysis of an ore body or mineralised structure.

"digenite"

Digenite is a copper sulphide mineral with formula Cu9S5. Digenite is a black to dark blue opaque mineral.

"dip"

A line directed down the steepest axis of a planar structure including a planar ore body or zone of mineralisation. The dip has a measurable direction and inclination from horizontal.

"galena"

Galena is the natural mineral form of lead (II) sulphide, with formula PbS. It is the most important ore of lead and an important source of silver. It has a silver colour.

"grab sample"

are samples of rock material collected from a small area, often just a few pieces or even a single piece of rock "grabbed" from a face, dump or outcrop or roughly 2-5kg. These are common types of rock samples collected when conducting mineral exploration. The sample usually consists of material that is taken to be representative of a specific type of rock or mineralisation.

"grade"

The proportion of a mineral within a rock or other material. For copper mineralisation this is usually reported as % of copper per tonne of rock (g/t).

"g/t"

grams per tonne; equivalent to parts per million ('ppm')

"hematite"

Hematite is the mineral form of iron(III) oxide (Fe2O3), one of several iron oxides. Magnetite alteration is also typically associate with porphyry copper systems, at or close to the central core.

"hypogene"

Hypogene ore processes occur deep below the earth's surface, and form deposits of primary minerals, such as chalcopyrite and bornite.

"Indicated Resource"

An "Indicated Mineral Resource" is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics, can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

"Inferred Resource"

An "Inferred Mineral Resource" is that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

"Induced Polarisation Geophysics"

Induced polarisation (IP) is a geophysical survey used to identify the electrical chargeability of subsurface materials, such as sulphides. The survey involves an electric current that is transmitted into the subsurface through two electrodes, and voltage is monitored through two other electrodes.

"intercept"

Refers to a sample or sequence of samples taken across the entire width or an ore body or mineralised zone. The intercept is described by the entire thickness and the average grade of mineralisation.

"lbs"

Pounds (measure of weight)

"Mlbs"

Million pounds (measure of weight)

"magnetite"

Magnetite is main iron ore mineral, with chemical formula Fe3O4. Magnetite is ferromagnetic, and it is attracted to a magnet and can be magnetised to become a permanent magnet itself.

"massive"

In a geological sense, refers to a zone of mineralisation that is dominated by sulphide minerals. The sulphide-mineral-rich material can occur in centimetre-scale, metre-scale or in tens of metres wide veins, lenses or sheet-like bodies containing sphalerite, galena, and / or chalcopyrite etc.

"Measured Resource"

A "Measured Mineral Resource" is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.

"Mineral Resource"

A "Mineral Resource" is a concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilised organic material including base and precious metals, coal, and industrial minerals in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge.

"mineralisation"

In geology, mineralisation is the deposition of economically important metals (copper, gold, lead, zin etc) that in some cases can be in sufficient quantity to form mineral ore bodies.

"open pit mining"

A method of extracting minerals from the earth by excavating downwards from the surface such that the ore is extracted in the open air (as opposed to underground mining).

"outcrop"

A section of a rock formation or mineral vein that appears at the surface of the earth. Geologists take direct observations and samples from outcrops, used in geologic analysis and creating geologic maps. In situ (in place) measurements are critical for proper analysis of the geology and mineralisation of the area under investigation.

"polymetallic"

three or more metals that may occur in magmatic, volcanogenic, or hydrothermal environments; common base and precious metals include copper, lead, zinc, silver and gold.

"polymict"

A geology term, often applied to breccias or conglomerates, which identifies the composition as consisting of fragments of several different rock types.

"porphyry"

Porphyry copper deposits are copper +- gold +- molybdenum orebodies that are formed from hydrothermal fluids that originate from a voluminous magma chamber below the deposit itself.

"Preliminary Economic Assessment"

NI 43-101 defines a PEA as "a study, other than a pre-feasibility study or feasibility study, which includes an economic analysis of the potential viability of mineral Resources".

"propylitic alteration"

Propylitic alteration is the chemical alteration of minerals within a rock, caused by hydrothermal fluids. This style of alteration typically results in epidote-chlorite+-albite alteration and veining or fracture filling, commonly altering biotite or amphibole minerals within the rock groundmass. It typically occurs along with pyrite.

"sediments"

Sedimentary rocks formed by the accumulation of sediments. There are three types, Clastic, Chemical and Organic sedimentary rocks.

"sequential assays"

Sequential copper analysis is a technique to semi-quantitatively define the zonations associated with some copper deposits. The method is based on the partial dissolution behaviour displayed by the prevalent copper minerals to solutions containing sulphuric acid and sodium cyanide. Results from sequential analyses can theoretically determine the amounts of leachable oxide minerals, leachable secondary sulphide minerals, and primary copper minerals, respectively.

"sphalerite"

Sphalerite is a zinc sulphide in crystalline form but almost always contains variable iron, with formula (Zn,Fe)S. It can have a yellowish to honey brown or black colour.

"supergene"

Supergene ore processes occur near surface, and form deposits of secondary minerals, such as malachite, azurite, chalcocite, covellite, digenite, etc.

"surface rock chip samples"

Rock chip samples approximately 2kg in size that are typically collected from surface outcrops exposed along rivers and mountain ridgelines.

"veins"

A vein is a sheet-like or anastomosing fracture that has been infilled with mineral ore (chalcopyrite, covellite etc) or mineral gangue (quartz, calcite etc) material, within a rock. Veins form when minerals carried by an aqueous solution within the rock mass are deposited through precipitation and infill or coat the fracture faces.

"volcanics"

Volcanic rock such as andesite or basalt that is formed from magma erupted from a volcano, or hot clastic material that erupts from a volcano and is deposited as volcaniclastic or pyroclastics.

 

 

 

 

 

 

 

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLGGUGCPUPBUQB
Date   Source Headline
26th May 20265:30 pmRNS2025 Annual Report & Financial Statements
12th Mar 20267:25 amRNSRegulatory Approval Received for KSK Transaction
12th Mar 20267:25 amRNSRegulatory Approval Received for KSK Transaction
29th Jan 20261:30 pmRNSResults of General Meeting
27th Jan 20265:30 pmRNSUpdate on Proposed Sale of Indokal (KSK Project)
17th Dec 20256:08 pmRNSUS$3.1 million Subscription
9th Dec 20251:55 pmRNSResults of Annual General Meeting
27th Nov 202512:45 pmRNSPDMR Dealing
14th Nov 202510:00 amRNSPDMR Dealing
12th Nov 20259:30 amRNSPDMR Dealing
10th Nov 20257:00 amRNSNotice of Annual General Meeting
6th Nov 202510:13 amRNSSale of Asiamet’s Interest in the KSK Project
6th Oct 202510:00 amRNSLong Term Incentive Programme
17th Sep 20257:00 amRNSDirector’s Fees and Employee Share-Based Payments
15th Sep 20257:00 amRNSBKM Copper Project Limestone Drilling Update
29th Aug 20257:00 amRNSInterim Results for Six Months Ended 30 June 2025
15th Aug 20257:00 amRNSLimestone Resource Drilling at BKM Copper Project
11th Aug 20257:00 amRNSAppointment of Project Director for BKM
18th Jul 20257:00 amRNSAppointment of Grant Samuel
15th Jul 20254:00 pmRNSCompletion of Subscription
9th Jul 20257:00 amRNSAppointment of Shore Capital as Corporate Broker
9th Jun 20255:15 pmRNSTR-1: Notification of major holdings
5th Jun 20257:00 amRNSCommencement of BKM Project Financing Process
29th May 20257:21 amRNSUS$2.5 million Subscription
29th May 20257:07 amRNS2024 Annual Report & Financial Statements
20th May 20257:00 amRNS-RBKM Stage 1 OFS – Investor Presentation and Q&A
15th May 20257:00 amRNSCompletion of BKM Feasibility Study ITE Report
7th May 20257:00 amRNSBKM Copper Project Optimised Feasibility Study
2nd May 202512:15 pmRNSUpdated Ore Reserve for BKM Stage 1
24th Apr 20257:00 amRNSPower Study Completes Inputs for Feasibility Study
28th Mar 20257:00 amRNSBKM Optimised Feasibility Study Near Completion
23rd Dec 20243:00 pmRNSBKM Capital Cost Estimate Reduced by US$58 Million
17th Dec 202410:00 amRNSDirector’s Fees and Employee Incentive Payments
26th Nov 202411:30 amRNSAppointment of Head of Corporate Finance
14th Nov 20247:00 amRNSBKM Copper Project Optimisation Works Update
18th Oct 20245:00 pmRNSSuccessful Completion of US$3.55 million Raise
15th Oct 20242:30 pmRNSRetail Offer
15th Oct 20242:25 pmRNSUS$3.3 million Subscription
7th Oct 20247:05 amRNSBoard Changes
30th Sep 202412:00 pmRNSInterim Results for Six Months Ended 30 June 2024
22nd Aug 202411:30 amRNSMaterial Capex Reductions for BKM Copper Project
26th Jun 20244:30 pmRNSResult of AGM
25th Jun 20247:00 amRNSBKM Copper Project Optimisation
3rd Jun 202410:00 amRNSNotice of Annual General Meeting
14th May 20247:00 amRNSBKM Heap Leach Facility Earthworks Optimisation
9th May 202411:45 amRNS2023 Annual Report & Financial Statements
17th Apr 20247:00 amRNSBKM High Grade Copper Rock Sample Results
28th Mar 20247:00 amRNSBKM Project Engineering Design & Execution Update
27th Mar 20247:00 amRNSSustainable Power Solution for BKM Copper Project
1st Mar 20247:04 amRNSCorporate Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.