RE: NEXT ASSAULT ON 2p19 May 2021 10:30
Angoose, this is going to trade in a range until there are further drilling results (which will shift it either way depending on how good they are), anticipation of results (upward push), apathy/ boredom (slow downward trend) or new license or project announcements (upwards push).
just a case of waiting and being patient, Until the next news/update it's likely to be lower trade numbers daily and a slow drift up and down.
Still chuckling at the Alan Green Kirkland link which is very tenuous at best (unless he has some inside info).
With two drills running and the anticline and CresWick new target underway then the next move should be (hopefully) worth waiting for.
If you are looking to JV in to Creswick and 7km of the DMS you would surely want more than 300m of the resource proven up, even with excellent technical DD .....the second drill site 2.5km down the DMS makes perfect sense.