RE: Team resolute9 Apr 2022 11:11
AlbertoZ
This is an old dispute. Pre the independence vote a certain number of Frigates were promised after the 2017review the number of that particular class of frigates were reduced. But the number of different types of frigates ordered since means that the number of frigates being built is at the level promised in 2014. However, the number that was reduced by in 2017 from what was promised in 2014 is still used.