Block 825 Sep 2023 09:05
Looks like they are well advanced at Block 8 wells and ready to test. Rigs, manpower and cash had been diverted to Block 8 which has obviously affected the operational effort at Caspian. Our KO continues to add assets into Caspian and we’ll soon see results to see if this was the right strategy.
The Block 8 contract area extends over 2,823 km2 with The Block 8 contract area extends over 2,823 km2 with three identified structures and production from two existing wells. It was previously owned by LG International the Korean conglomerate, which in 2006 began the acquisition of 3D seismic data over approximately 456 km2. In recent years two deep wells have been drilled to depths of 4,203 meters and 3,449 meters respectively, from which oil has flowed at rates of up to 800 bopd.
Current production from Block 8 is approximately 110 bopd, with oil transported to the same treatment and pumping station used by BNG.
Drilling at Deep Well AKD-4 has reached its planned total depth of 3,922 meters and preparations are underway to test the well.
Drilling at Deep Well T-2D, which has a planned total depth of 3,500 meters, has reached 3,408 meters. After the remaining 92 meters are completed the well will be prepared for testing.
From interims -;
The acquisition of Block 8 will bring a second flagship asset into the Group. Either BNG or Block 8 will then have the ability to transform the value of the Group in the event of successful deep drilling.three identified structures and production from two existing wells. It was previously owned by LG International the Korean conglomerate, which in 2006 began the acquisition of 3D seismic data over approximately 456 km2. In recent years two deep wells have been drilled to depths of 4,203 meters and 3,449 meters respectively, from which oil has flowed at rates of up to 800 bopd.
Current production from Block 8 is approximately 110 bopd, with oil transported to the same treatment and pumping station used by BNG.
Drilling at Deep Well AKD-4 has reached its planned total depth of 3,922 meters and preparations are underway to test the well.
Drilling at Deep Well T-2D, which has a planned total depth of 3,500 meters, has reached 3,408 meters. After the remaining 92 meters are completed the well will be prepared for testing.
The acquisition of Block 8 will bring a second flagship asset into the Group. Either BNG or Block 8 will then have the ability to transform the value of the Group in the event of successful deep drilling.