58 meters (“m”) @ 20.51% Zinc Equivalent5 Dec 2022 11:40
Bonanza Grades! And part of the Bankable Feasibility Study
As of November 29, Ascendant has completed 23 drill holes (11 Metallurgy holes reported and 12 infill holes) totalling 10,453 meters as part of the overall drill program to support the completion of the Bankable Feasibility Study expected to be completed by the end of Q1/23. Two additional infill holes are currently in progress in the South Zone for a total of 985m. Assays reported today represent full results received as of November 22, 2022 and include three metallurgical holes collared in the North zone: Met_MS_05, Met_MS_06, and Met_MS_07.