EWT's23 Jul 2018 01:28
IMHO when the PI's who have not fully understood the significance of the RNS are gone and the share price stabilizes, then Zaza will release the extended flow test rates from T45 and Dino. We already have T39's EWT as stated in the RNS:-
On 4 July 2018, Extended Well Testing ("EWT") commenced at T-39 well, by perforation of 21m interval of Zone 19, situated between 2970m and 3000m. After a well clean out, the well started to flow light ( 41.5 API), sweet crude oil together with wet gas and, under natural flow, achieved following production rates: 529 bbls/d of oil and 600,000 scf/d of gas using an 8/64" chock size, 347 bbls/d of oil and 425,000 scf/d of gas using an 7/64" chock size and 250 bbls/d of oil and 350,000 scf/d of gas through 6/64" chock, demonstrating excellent well deliverability. The Company anticipates that production rates from future development wells may be significantly higher.
As T39 is a conventional oil well and didn't need fracking, there are no fissures that require opening as the reservoir is in a porous rock. Also, the greater pressure and the wet gas improve the recharge time.