RE: Risk and reward23 Jan 2022 15:32
I think it will stop at the planned TD 650m and the reason is the drill is angled north ie away from GRS and away from the feeder zone. Think of a book standing vertically at 60 degree angle, the drill was designed to hit the middle, to go through the thickness and then deeper so any DHEM can get a good look at the structure. One of the key things to look out for on the results other than Cu, Ni, PGE, Au(?) and any grades, is the true thickness of the structure which is a measure of deposition; a few meters thickness isn’t great, +10m commercial, 40-50m bonanza. I’m ignoring the feeder zone and GRS Proterozoic until they drill later in the year.