RE: Gone blue12 Aug 2023 10:44
If jet pump installation starts Monday maybe finished by the following Monday the 21st. At least 10 days, probably longer, to establish the new flow rate. That takes us to the end of the month, minimum. Then a week or two, for a jv to be announced in principle. As always, we can hope for sooner, but I would say mid September, if we are lucky, for the SP to shift up significantly.