RE: Rig13 Sep 2019 18:53
It was only a week ago that the mast was seen to be up, give em a chance. Set it all up, do a bit of a dry run, make sure there are back up stock of various drilling tools, mud system, tanks, pumps, casing, drill pipe, bop testy, all needs checking and measuring..again before re-entering.
It would be no surprise to find out on Monday that the well was re-entered over the weekend. End of Oct roughly and the well, together with revised completion design will be chuffing out oil. This well is up-dip, not sure whether that equates to a potentially larger oil column ( if the bottom of the formation is the same depth as 16az) or that it is the same potential column but at a shallower depth. Anyhow, kick off very soon I would say.