RE: Twitter28 Aug 2019 12:19
I understand the slight confusion here now. Lol. The drill pipe laying flat will be a few spare singles plus (maybe) some thicker wall pipe. The singles on the ground will be used to add depth to the hole and will be joined one at a time, same as any other rig. The vertical ones currently 'racked back' in the mast are what is required to run back in to the current depth. Because they mast is fairly full, it means that the drill bit is not currently at the bottom of the hole. They may be running back in or pulling out or have pulled out completely to change the BHA, ( bottom hole assembly) amongst other things, the bha includes the drill bit. They may in fact have been coring whilst drilling, hence very slow progress which would tie in with analysis of the structure for future well design. The bit will need to be changed so that more progress can be made until the overlaying cap above the late Cretaceous is reached. Some words via tweet would have been helpful, as all of the ablove could be total fiction. Lol.