RE: News13 Feb 2025 09:32
Zrt, there was an update only on Monday for the two workovers already underway - and none too positive either.
Initial Workover Activities
Cambay C-70: Cambay well C-70 was selected as the first workover candidate as a gas producer from the shallow Miocene reservoir. Despite promising initial production of up to c. 190,000 scfd, the well has experienced water influx. A final attempt to re-start the well using compression equipment will be made in the near future.
Cambay C-63: The workover on C-63 targeted oil production from the Eocene reservoir. The well was cleaned out prior to the installation of a sucker rod pump ("SRP"). The SRP was not able to be installed deep enough in the well to avoid "gas blocking" due to an obstruction in the wellbore. The forward plan is to mill out the obstruction so the SRP can be installed below the perforations to avoid gas blocking. Thereafter, contingent on establishing production, the well is a candidate for frac stimulation.