RE: Bluewater awards FPSO modifications contracts2 Nov 2020 20:39
In its half-year results in September, Hurricane discussed the possibility of starting water injection on the Lancaster field to increase production, which would require Aoka Mizu to be modified.
The tie-back of a well in the Greater Warwick Area to Aoka Mizu would also call for modifications to the vessel, but an investment decision is yet to be made on such a development.
Derek Mitchell, managing director of Global E&C, said: ‘We’re delighted to have been selected by Bluewater. Global E&C is fully committed to applying our extensive experience in brownfield engineering to support Bluewater with executing modifications on their asset in the most efficient and cost-effective manner possible.
“Our extensive engineering capability, flexible delivery model and wider integrated EPC service offering were key in our ability to secure this critical contract with Bluewater.
“This contract maintains our position as a leading provider of modifications and engineering services in the UKCS, demonstrating our ability to support the varying assets in our offshore industry, both fixed and floating production.”