RE: Come on Angs!-should be higher SP!2 Jun 2018 10:04
Pboo - oh dear.....firstly why haven't you still filtered me after saying you would? Must be a love hate relationship lol
I think firstly your personnel opinion of me is seeping through with every post where my unbiased factual opinion doesn't follow your obvious ramping of the Angus SP, which has been quite evident since you flooded the BB for the past several months.
I deal with facts and achievable timelines for specific operations whereas others including yourself don't. You blocked me from your Wealdoilers Twitter page when I requested a photo of the rig working over X2 and photo of the perforation guns either inside the shipping basket or lying next to it.
You stated in multiple posts that they were installing ESPs to both wells. I found that highly strange considering the low bopd from X1 as it didn�t make economical sense. Then you changed your tune and said it was only for X2 and X1 could be lined up to be a water injector?!?! Coming up with opinions without the facts is highly unhelpful, just as saying with 100% conviction that a blue shipping basket contains perforation guns and then trying to put words in my mouth by stating
�Alan2017, do I take it that you agree that it's more than likely that it's a perforating gun in that long blue container, as to date you have not said that it isn't.
In your opinion what do you think it is going to be used for.??�
You would be better served spending your time reading up on RNS / relevant oil company websites to get up to speed with the current status at various sites instead of posting factually incorrect information which posters like myself or IBug have to then correct.
I am more interested in the operations at Lidsey seeing Angus would have spent circa �150,000 on the rig alone. What have been the results? Yes thats correct�I even know the approximate cost of a workover unit�whereas your contribution on Twitter is doing a cut and paste for the definition of water injection.