Potential Future Production Stage
Should the borehole flow testing and pressure monitoring works reveal that there are hydrocarbon reserves that could viably be extracted in the future, then after stage 1 has been completed the borehole would be temporarily suspended, whilst a new planning application was prepared and submitted for the production stage. During this period all plant and machinery would be removed from the site and the land would effectively lie dormant pending the outcome of the planning application.
3.6 Programme
3,6.1 The borehole flow testing and pressure monitoring data will require analysis. The analysis will enable Cuadrilla to decide whether or not to seek the necessary planning, permitting and other approvals required to take the site forward as a production site. This analysis and assessment process will take approximately six to nine months to complete after the flow testing and pressure monitoring has finished and the data been collected. In the event that the assessment concludes that a future production phase would be commercially viable, then an additional 18 months would be required to apply for and secure the necessary planning, environmental permitting and other permissions required for production operations. The borehole will be safely suspended during any such application period.
No production will take place at Balcombe, as it�s a new field and requires OGA approval ..this will take circa 2 years.
Fantastic flow test results from Balcombe will push the SP northwards,