Asacha Project Update and Shareholder Loans

19 Apr 2011 07:00

RNS Number : 1374F
Trans-Siberian Gold PLC
19 April 2011
 



 

 

 

Trans-Siberian Gold plc

 

Asacha project update

 

US$4.33 million shareholder loan facilities

 

 

London: 19 April 2011 - Trans-Siberian Gold plc ("TSG" or "the Company") (TSG.L)reports on the progress of construction at the Asacha site.

 

In February 2011 a second shift was arranged at the mine to ensure the mining of high-grade ore by the time of plant commencement by the end of July 2011. 260 metres and more than 2,660 m3 of mine development were completed in February and 281 metres and more than 3,100 m3 in March. The ore stockpile at 31 March 2011 comprised more than 64,000 tonnes.

 

By the beginning of April 2011, the plant building's panel walls and multi-layer roofing with thermal insulation had been completed and its inside concrete walls, concrete flooring and ventilation system were close to completion. Construction of the coarse ore bin and conveyor gallery has commenced and the technological piping and construction of the heating system are also in progress.

Although thick snow caused earth works and geomembrane laying activities at the tailings storage facility to slow, we expect that the facility will be operational when the processing plant is launched by the end of July 2011.

 

The thermally insulated repairs shop building is ready, including the concrete floor and equipment foundations, except for completion of its supply systems which can be set up later. Construction of water, heat supply and sewage networks at the site is in progress. Heat recovery units have been installed at the diesel generators site and electric wiring works are under way.

 

Following obtaining the license and commissioning of the cyanide storage facility in February 2011, the contract for cyanide purchasing has been signed.

 

The total capital cost of the Asacha project prior to commencement of production is now estimated at US$129.3 million, net of US$10.2 million VAT recoveries, compared to the 2 March 2011 estimate of US$128.5 million (net of US$10.2 million VAT recoveries). The total project cost includes pre-commissioning mining and plant costs of US$3.9 million, other pre-operating expenditure of US$37.1 million, "first fill" equipment spares and consumables of US$1.0 million and contingency of US$0.5 million.

 

Actual expenditure on the project up to 28 February 2011 amounted to US$115 million, net of US$8.7 million VAT recovered. The remaining costs prior to the commencement of production are estimated at US$14.3 million, net of further VAT recoveries of US$1.5 million, comprising:

 

 

 

US$ million

Capital expenditure

Mine and mining equipment and facilities

1.1

 

Gold plant, site facilities and tailings storage (1st phase)

6.5

 

Off-site power supply and other infrastructure

2.8

 

Contingency

0.5

 

Total capital

10.9

Other costs

Pre-production mining, spares and consumables and other operating costs

4.9

 

 

15.8

Less: VAT recoveries

 

1.5

 

 

14.3

 

 

A further US$27.5 million of capital expenditure is expected to be incurred after the commencement of production (including US$6.3 million on mine development, US$5.1 million on the plant, tailings storage and solid waste landfill, US$11.6 million for the completion of the external power line and US$4.5 million contingency).

 

Following the US$4 million increase in the pre start up capital cost of the Asacha project reported on 2 March 2011, the Company's major shareholders UFG Asset Management (UFG) and AngloGold Ashanti (AGA) have agreed to provide the Company with loan finance, of US$2 million and US$2.33 million respectively, on commercial terms. As with the existing US$2 million UFG loan facility reported on 1 November 2010, all or part of the loans may be repaid by TSG without penalty at any time before the scheduled repayment in two equal tranches, on the fourth and fifth anniversaries of the commencement of gold production at Asacha.

 

If the Company raises equity during the term of the loan, UFG and AGA may convert any part of their outstanding loans into TSG shares at the same time and price per share as that equity raising. UFG and AGA also have an option, subject to the requisite approval of TSG's shareholders, to convert any part of their outstanding loans into TSG shares at a price equivalent to the volume weighted average price of TSG's shares for the period of 60 business days prior to notice of such conversion.

 

As UFG is a substantial shareholder in the Company, and pursuant to AIM Rule 13, the UFG loan is deemed to be a related party transaction. The Company's Board (except for Florian Fenner, Dmitry Khilov and Charles Ryan who are connected to UFG) consider, having consulted with TSG's Nominated Adviser, Seymour Pierce Limited, that the terms of the UFG loan are fair and reasonable insofar as the shareholders of TSG are concerned. On the basis of this advice the Board has approved the UFG loan.

 

- Ends -

 

Contacts:

 

TSG

+44 (0) 1480 811871

Simon Olsen

 

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDKFDKOBKDOQD
Date   Source Headline
1st Feb 20123:56 pmRNSConversion of Debt & Total Voting Rights
31st Jan 20127:00 amRNSExercise of conversion options
30th Jan 20127:00 amRNSAsacha mining and production update
20th Dec 20117:00 amRNSAsacha mining and production update
1st Dec 20117:00 amRNSApproval of Rodnikova reserves and First repayment
14th Nov 20117:00 amRNSFirst sale of Asacha gold
2nd Nov 20117:00 amRNSFurther shipments of Asacha gold
19th Oct 20117:00 amRNSFirst shipment of Asacha gold
14th Oct 20117:00 amRNSProposed exercise of conv. option re. debt & GM
12th Oct 20117:00 amRNSProposed exercise of conversion option re. debt
12th Oct 20117:00 amRNSProposed exercise of conversion option re. debt
3rd Oct 20117:00 amRNSProposed exercise of conversion option re. debt
29th Sep 20117:00 amRNSNew Shareholder Loan Facilities
29th Sep 20117:00 amRNSHalf Yearly Report
30th Aug 20118:45 amRNSAsacha Project Update
8th Aug 20117:00 amRNSAsacha Project Update
28th Jun 201112:33 pmRNSAsacha Project Update
28th Jun 20117:00 amRNSAGM Presentation
10th Jun 20117:00 amRNSAsacha Project update
3rd Jun 20111:14 pmRNSNotice of AGM
31st May 20117:00 amRNSFinal Results for the year ended 31 December 2010
19th Apr 20117:00 amRNSAsacha Project Update and Shareholder Loans
2nd Mar 20117:00 amRNSAsacha Project Update
26th Jan 20117:00 amRNSAsacha Project Update
15th Dec 20107:00 amRNSAsacha project update
15th Nov 20107:00 amRNSFirst drawdown of US$18 million Asacha loan
11th Nov 20101:01 pmRNSHolding(s) in Company
1st Nov 20109:00 amRNSNew loan facilities and project update
29th Sep 20107:00 amRNSHalf Yearly Report
13th Aug 20108:09 amRNSPurchase of minority interest in Asacha project
29th Jun 20104:49 pmRNSResult of AGM
26th May 20107:00 amRNSNotice of AGM
25th May 20107:00 amRNSFinal Results
23rd Mar 201011:31 amRNSResult of GM/Conversion and Placing of Shares
1st Mar 20107:00 amRNSIssue of Equity
16th Nov 20097:00 amRNSAppointment of Chairman
19th Oct 20097:00 amRNSDirectorate Change
30th Sep 20097:00 amRNSHalf Yearly Report
28th Jul 200912:10 pmRNSResult of AGM
27th Jul 20097:00 amRNSDirectorate Change and Grant of Options
30th Jun 20097:00 amRNSAnnual Report & Accounts
23rd Jun 20098:27 amRNSFinal Results
29th May 20099:05 amRNSFunding Update
7th May 20097:00 amRNSAsacha project and funding update
27th Apr 200912:05 pmRNSDirectorate Change
16th Dec 200811:32 amRNSTrading Statement
24th Nov 200812:22 pmRNSDirectorate Change
29th Sep 20087:00 amRNSInterim Results
18th Aug 20084:00 pmRNSEGM Statement
28th Jul 20087:00 amRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.