Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders

Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders

Share Price Information for Pan African Resources (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 25.55
Bid: 25.50
Ask: 25.60
Change: -0.60 (-2.29%)
Spread: 0.10 (0.392%)
Open: 26.20
High: 26.20
Low: 25.50
Prev. Close: 26.15
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Barberton Tailings Retreatment Plant.

4 Apr 2012 10:00

4thApril 2012 Pan African Resources PLC (`Pan African' or the `Company')

Incorporated and registered in England and Wales under Companies Act 1985 with

registered number 3937466 on 25 February 2000 AIM: PAF/JSE: PAN ISIN: GB0004300496

Ground-breaking eventmarks the start of construction of Pan African'sBarberton Tailings Retreatment Plant.

Pan African has today commenced bulk earthworks for the construction of its Barberton Tailings Retreatment Plant ("BTRP"), to be constructed on the Barberton Property, adjacent to the current Bramber tailings dam.

The commencement of bulk earthworks marks the start of the civil work that will entail bulk excavations for creating the terracing of the BTRP which will become the foundation for the mechanical construction of the Carbon-in-Leach tanks, scheduled to commence in June 2012.

Management contractor firm, Basil Read-Matoma, which designed the plant and will procure and construct it, has established itself on site with a temporary office. The team will be on site for the next two years, until the commissioning of the plant, which is scheduled for April 2013, ramping up to full production in August 2013.

Jan Nelson CEO of Pan African Resources was on site to break ground and noted: "The beginning of construction on this plantresemblesa mirror image of our successful Phoenix platinum project. The BTRP is no more complex than Phoenix but isa much larger scaledproject and will enable 100 tons of feed an hour, compared to the current 30 tons an hour at Phoenix. We have the same highly skilled team from BasilRead-Matoma dedicated to this projectwho willworktogether with our management team at Barberton. I am therefore confident of the same outcome for a successful commissioning in April 2013."

ENDS

About the project

The BTRP comprises a total resource of ~654koz (13.7Mt @ 1.38g/t) and a reserve of ~248koz (13.7Mt @ 0.56g/t)

The BTRP has been designed to treat 100,000 tons tailings per month through a Carbon in Leach circuit using electro-winning and smelting to produce a saleable product. Current tailings from the Fairview Concentrator and the Fairview BIOX( ®) plant totalling 14,000 tons per month will be routed via a pipeline to the BTRP for treatment and 86,000 tons per month will be reclaimed from the Bramber tailings storage facility .

The electric power requirement of 6000kW to the BTRP will be supplied via an overhead 11kV line from the South African electricity utility, Eskom.

At a gold price of ZAR400,000 per kilogram Phase One of the project indicates an NPV of GBP27 million, at a total cash cost of ZAR194,000 per kilogram (ZAR114 per ton) over the life of the project. Capex is estimated at GBP27 million (ZAR325 million) over a three year period. Phase One is expected to retreat 1.2 Mt of gold tailings per annum, with a total life of project production of 160, 000oz of gold at an average recovered grade of 0,54g/t. This would increase the annual production profile at Barberton by approximately 20,000 oz per annum.

EnquiriesSouth Africa UK Pan African Resources RBC Capital Markets

Jan Nelson, Chief Executive Officer Martin Eales / James Kelly

+27 (0) 11 243 2900 +44 (0) 20 7029 7881 One Capital, JSE Sponsor St James's Corporate Services Limited Sholto Simpson / Megan Young / Nicholas Tyler Phil Dexter +27 (0) 11 550 5000 +44 (0) 20 7499 3916 Vestor Investor Relations Gable Communications Louise Brugman Justine James +27 (0) 11 787 3015 +44 (0) 20 7193 7463

XLON
Date   Source Headline
4th Apr 201210:00 amPRNBarberton Tailings Retreatment Plant.
3rd Apr 20127:00 amPRNAdditional Listing
30th Mar 20122:45 pmPRNDealings by an Associate of an Non-Executive Director
13th Mar 20128:30 amPRNChange of JSE Sponsor
12th Mar 20127:07 amPRNFurther Cautionary Announcement
22nd Feb 20128:00 amPRNStatement re Results Presentation by Pan African
22nd Feb 20127:00 amPRNInterim Results for the 6 months ended 31 December 2011
1st Feb 201211:12 amPRNApproval for Barberton Tailings Project
31st Jan 20127:48 amPRNPresentation re acqusition of Evander on website
30th Jan 20122:04 pmPRNStatement re acquisition of Evander Gold Mine
30th Jan 20122:01 pmPRNAcquisition of Evander Gold Mine
30th Jan 20128:06 amPRNJoint briefing by Pan African and Wits Gold
25th Jan 20127:00 amPRNTrading Statement
30th Dec 201112:40 pmRNSSecond Price Monitoring Extn
30th Dec 201112:35 pmRNSPrice Monitoring Extension
29th Dec 20117:00 amPRNRenewal of Cautionary Announcement
14th Dec 201112:30 pmPRNChanges to the Board of Directors
13th Dec 20111:00 pmPRNHolding(s) in Company
1st Dec 20119:00 amPRNTotal Voting Rights
29th Nov 20117:11 amPRNFirst production at Phoenix
24th Nov 20119:00 amPRNIssue of Equity
17th Nov 201112:00 pmPRNCautionary Announcement
2nd Nov 20113:56 pmPRNDealings by an Associate of an Non-Executive Director
1st Nov 20113:52 pmPRNResult of AGM
1st Nov 20112:46 pmPRNDealings by an Associate of a Non-executive Director
28th Oct 20117:00 amPRNIssue of Equity
17th Oct 20117:00 amPRNCold commissioning commences at Phoenix Platinum
28th Sep 20111:50 pmPRNCorrection to Annual Report and Dividend dates
28th Sep 20118:30 amRNSAnnual Report, AGM & Dividend notification
22nd Sep 20112:09 pmPRNHolding(s) in Company
22nd Sep 20111:48 pmPRNNominated Adviser Change of Registered Name
12th Sep 20117:00 amPRNFinal Results
19th Aug 20117:00 amPRNListing of Manica as a Separate Entity
15th Aug 20117:00 amPRNNotice of Results
27th Jul 20118:51 amPRNWage Negotiations Concluded
20th Jul 20111:00 pmPRNDirectorate Change
1st Jul 201112:32 pmPRNCorrection : Statement re Phoenix Platinum Project
1st Jul 201112:01 pmPRNStatement re Phoenix Platinum Project
22nd Jun 20117:00 amPRNResource Upgrade at Manica and Group Resource Upgrade
9th Jun 20118:00 amPRNResults of Drilling Programme at Bramber Tailings Dam
31st May 20119:20 amPRNStatement re Conference Presentation
31st May 20119:15 amPRNStatement re Barberton Mines Resource Upgrade
3rd May 20118:58 amPRNStatement re Revolving Credit Facility
4th Apr 20117:00 amPRNMozambique Govt Awards Mining Licence on Manica Project
23rd Mar 20117:00 amPRNPan African Commences Bulk Earthworks at Phoenix Plat
22nd Feb 20117:00 amPRNInterim results for the six months ended 31 Dec 2010
10th Feb 20117:00 amPRNStatement re Site Visit to Barberton Mines
3rd Feb 20112:00 pmPRNTrading Update
4th Jan 201112:00 pmPRNTotal Voting Rights
31st Dec 20108:00 amPRNHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.