Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Regulatory News (PAF)

Share Price Information for Pan African (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 24.00
Bid: 23.80
Ask: 24.05
Change: -0.30 (-1.23%)
Spread: 0.25 (1.05%)
Open: 23.60
High: 24.00
Low: 23.40
Prev. Close: 24.30
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Approval for Barberton Tailings Project

1 Feb 2012 11:12

Pan African Resources plc

(Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000)

Share code on AIM: PAFShare code on JSE: PANISIN: GB0004300496

(`Pan African' or the `company')

Approval granted for Phase One of the Barberton Tailings Retreatment Project

and the acquisition of Harper Tailings Operations

Pan African is pleased to announce that the board of directors has approved Phase One of the Barberton Tailings Retreatment Project ("BTRP") which will recover gold from the retreatment of the gold tailings situated close to the Barberton Gold Mining Operations ("Barberton"). It is anticipated that the BTRP will increase the production profile at Barberton from 95,000oz to 120,000oz per annum.

Highlights

- The BTRP comprises a total resource of ~654koz (13.7Mt @ 1.38g/t) and a reserve of ~248koz (13.7Mt @ 0.56g/t)

- A Capital Cost Estimate ("Capex") of GBP27 million (ZAR325 million) has been approved for Phase One of the BTRP in order to retreat 1.2Mt per annum of gold tailings over a six year life, funded from internal cash flows

- Over the life of Phase One of the project, a total of 160koz will be recovered (which includes 120koz from tailings and another 40koz from current underground arisings to be retreated)

- At a gold price of ZAR400,000 per kilogram the project has a net present value ("NPV") of GBP27 million (ZAR325 million)

- Phase One of the BTRP:

- will increase current production at Barberton by 26% to 120koz per annum

- is expected to produce gold at an operating cash cost of ZAR194,000 per kilogram

- Commissioning of Phase One of the BTRP is expected to commence in April 2013 with full production being achieved during August 2013 (build -up phase)

- The remaining 129koz* of reserve will represent Phase Two of the project and the phasing of this additional production is currently being finalised, which would extend the BTRP from 6 to 12 years

- Harper Tailings Operations acquired for a total consideration of GBP830,000 (ZAR10 million)

\* The 40koz resulting from the retreatment of current underground arisings after gold reclaimed from the BTRP is not included in the BTRP reserve of 248koz.

Jan Nelson, Chief Executive Officer of Pan African commented: "This project will be a further example of the tried and tested approach applied at the Phoenix platinum group metals tailings retreatment project to enhance the production profile at Barberton. The operating cash cost profile from underground production at Barberton is currently below ZAR165,000 per kilogram and this project will further increase the margins resulting in increased cash flow. This should ensure that Pan African can increase its dividend as well as pursue other accretive growth opportunities in the near term."

Project Concept & Locality

During 2010 the main tailings storage facility (referred to as the Bramber tailings storage facility (`BTSF') at the Fairview section of Barberton reached the end of its operational life. The BTSF was commissioned in 1987 and has been the main storage facility for gold tailings from the Fairview section of Barberton. In light of current gold prices and the volume of material the BTSF represents, the Company decided to investigate the financial viability of reclaiming recoverable gold from the BTSF.

The exploration programme to investigate the volume and grade of the BTSF comprised a comprehensive auger drilling campaign on a 20 metre by 20 metre grid which included 308 boreholes for a total of 6,074 metres.

Modelling and geological profiling of the boreholes confirmed two distinct geographical populations across the BTSF. This is the result of historical deposition that took place in two separate compartments, a higher grade BIOX® tail section and a lower grade concentrator/flotation tail section. Geostatistical modelling indicates 74,600oz (758kt @ 3.06g/t in situ) for the BIOX® section and 72,900oz (2.369Mt @ 0.96g/t in situ) for the concentrator/ flotation section. This represents a total resource of 147,500oz (3.130Mt @ 1.47g/t in situ) of which 24% by volume (51% by gold content) of the total Mineral Resource, originated from the BIOX® process. The flotation process produced the balance.

A total of 10 composite samples representative of the tailings material were submitted for metallurgical recovery test work. Initial excess cyanide test work indicated recoveries varying between 45% and 55%. Further Kinetic test work confirmed recoveries of 52%.

The two adjacent Tailings Storage Facilities ("TSFs"), Harper North and Harper South, both older than the BTSF and also originating from the Fairview Mining operation, were subsequently investigated as an additional surface source that could be reclaimed for gold. After successful test work the dumps were purchased from Michael Harper on 15 December 2011 for an aggregate consideration of ZAR10 million (GBP830,000). A total of 52 auger holes were drilled (1,013.5m drilling) and 753 samples taken (composited at 3 metre intervals to produce 463 samples). A total of five composites, representing the dumps, were submitted for metallurgical test work. These resources are included in the resource statement, as tabled below, and were also converted to reserve after stringent metallurgical test work was performed on the material. The Bramber TSF, Harper South TSF and Harper North TSF were included in the BTRP Phase One business case study.

Furthermore, the Company has completed auger drilling on another 6.8Mt of tailings at the New Consort section of Barberton, which has defined a further 4Mt of reserves (129koz) which would extend the BTRP from approximately 6 to 12 years, comprising Phase Two of the project. The auger holes drilled totalled 48 and equates to 790 metres. A total of 615 samples were taken at 1.5 metre increments that was composited at 3 metre intervals, for a total of 405 combined samples submitted for gold content determination. A total of five composites were submitted for metallurgical test work. Phase Two of the BTRP project is estimated to require a further ZAR55 million (GBP4.6 million). in capital and the phasing of production from this phase is being finalised.

Total Bramber Tailings Dam Resource and Reserve Statement as at 1 June 2011

Harper North and SouthSegalla/ Consort

Project Resource Mass Grade Mineral Recovery Reserve Mineral Category (kt) (g/t) Resource Category Reserves (kt) (g/t) (kg) (koz) (kg) (koz) Bramber Measured 3,130 1.47 4,600 148 51.2% Probable 2,355 76 Tailing Dam Indicated Inferred Total 3,130 1.47 4,600 148 51.2% Total 2,355 76 North 2,693 1.16 3,124 100 21.0% Probable 656 21 South 1,083 1.65 1,787 57 39.7% Probable 709 23 Total 3,776 1.30 4,911 158 1,365 44 est. Calcine 290 5.95 1,726 55 18.2% Probable 314 10 Non - 6,591 1.38 9,096 292 40.9% Probable 3,684 118 calcine Total 6,881 1.57 10,821 348 3,998 129 est. Total Surface 13,787 1.47 20,332 654 7,718 248 Tailings

Project Development Summary

The BTRP plant site will be located on the Barberton property and the planned BTSF extension will be positioned adjacent to the current tailings dam on the Farms Bramber South 349JU and Bramber Central 348JU which are owned by Barberton.

The BTRP has been designed to treat 100,000 tons tailings per month through a Carbon in Leach circuit using electro-winning and smelting to produce a saleable product. Current tailings from the Fairview Concentrator and the Fairview BIOX(R) plant totalling 14,000 tons per month will be routed via a pipeline to the BTRP for treatment and 86,000 tons per month will be reclaimed from the BTSF.

In October 2011, Basil Read-Matomo, which successfully constructed Pan African Phoenix Chrome Tailings Retreatment Plant within budget and two months ahead of schedule, completed the BTRP Feasibility Report and Capex. The total Capex for the BTRP is estimated to be GBP27 million (ZAR325 million) of which GBP10 million (ZAR830,000) will be used to extend the current TSF used at the Fairview operation for tailings disposal over the Life of project.

Basil Read-Matomo has been contracted to design, procure and construct the BTRP. Long lead items that have been identified such as leach tanks and carbon regeneration kiln and are currently being procured. Civil work of the BTRP is planned to commence end March 2012 with mechanical construction commencing in June 2012, and commissioning commencing in March 2013, with full production being achieved during August 2013 (build-up phase). The electric power requirement of 4,522kW to the BTRP will be supplied via an overhead 11kV line from the South African electricity utility, Eskom.

At a gold price of ZAR400,000 per kilogram Phase One of the project indicates an NPV of GBP27 million, at a total cash cost of ZAR194,000 per kilogram (ZAR114 per ton) over the life of the project. Capex is estimated at GBP27 million (ZAR325 million) and a total of 160, 000oz of gold will be produced at an average recovered grade of 0,54g/t. This would increase the annual production profile at Barberton by approximately 20,000 oz per annum.

1 February 2012JohannesburgJSE Sponsor

Macquarie First South Capital (Pty) Limited

For further information on Pan African Resources plc, please visit the website at www.panafricanresources.com

EnquiriesSouth Africa UK Pan African Resources RBC Capital Markets

Jan Nelson, Chief Executive Officer Martin Eales / Peter Barrett-Lennard +27 (0) 11 243 2900 +44 (0) 20 7653 4000

Macquarie First South Capital (Pty) St James's Corporate Services Limited Limited

Phil Dexter Melanie de Nysschen / Annerie Britz /

Yvette Labuschagne +44 (0) 20 7499 3916 +27 (0) 11 583 2000 Vestor Investor Relations Gable Communications Louise Brugman Justine James +27 (0) 11 787 3015 +44 (0) 20 7193 7463 +44(0) 7525 324431 Notes

The resource statement has been compiled in accordance with the South African Code for Reporting of Exploration Results, Mineral Resources and Mineral Reserves ("SAMREC"). The verification and validation of the data and the information contained in this announcement was managed by Mr David Briggs (NHD Pr.Sci.Nat), Director: Geologix MRC (Pty) Limited, who is accredited with the South African Council for Natural Scientific Professions ("SACNASP"). He has consented to the inclusion of the technical information in this announcement in the form and context in which it appears.

The services of the following independent consultants and experts were secured to assist and support this process:

- Sampling and Drilling: Gold Mine Sand and Slime Dams Drillers CC

- Assaying, mineralogy and metallurgical test work: SGS Lakefield Resources Africa (Pty) Limited.

- Geological modelling and data conversion for the resources: Geologix MRC (Pty) Limited, a South African Resources and Geological Consultancy. Mr Briggs is accredited with the South African Council for Natural Scientific Professions (SACNASP).

- ENC Minerals: Eugene Nel is a Professional Engineering technologist registered with the Engineering Council of South Africa (ECSA).

XLON
Date   Source Headline
14th Feb 20247:00 amPRNUnaudited Interim financial results for the six months ended 31 december 2023
2nd Feb 20247:00 amPRNTrading Statement
29th Jan 20243:45 pmPRNHolding(s) in Company
22nd Jan 20247:00 amPRNOperational Update for the Half Year ended 31 December 2023 (H1 FY2024)
7th Dec 202310:00 amPRNHolding(s) in Company
24th Nov 20237:00 amPRNResult of AGM & Salient Dividend Dates
22nd Nov 20237:00 amPRNInterim Production Update for half year ending 31 December 2023
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
8th Nov 20232:45 pmPRNDirector/PDMR Shareholding
7th Nov 20231:30 pmPRNDirector/PDMR Shareholding
31st Oct 20237:00 amPRNNotice of AGM & Abridged Annual Financial Statements for the year ended 30 June 2023
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
13th Sep 20237:00 amPRNProvisional summarised audited results for the year ended 30 June 2023
5th Sep 202311:45 amPRNHolding(s) in Company
1st Sep 20237:00 amPRNTrading Statement for the year ended 30 June 2023
7th Aug 20237:00 amPRNOperational Update for the year ended 30 June 2023
1st Aug 20239:10 amPRNUpdate to Commissioning Date of the Mintails Project
1st Aug 20237:24 amPRNMintails Project Funding Closed and Granting of Integrated Environmental Authorisation
1st Jun 20227:00 amPRNAppointment of Berenberg as Joint Broker
12th Apr 20227:00 amPRNTransaction in Own Shares
11th Apr 20227:00 amPRNHolding(s) in Company
7th Apr 20227:00 amPRNTransaction in Own Shares
4th Apr 20227:07 amPRNTransaction in Own Shares
1st Apr 20227:00 amPRNShare Buyback Programme
14th Mar 20227:00 amPRNGold Exploration Programme in Sudan
7th Mar 20229:30 amPRNHolding(s) in Company
7th Mar 20227:00 amPRNHolding(s) in Company
2nd Mar 20227:00 amPRNHolding(s) in Company
16th Feb 20227:00 amPRNUnaudited Interim Results for 6m to 31 Dec 2021
19th Jan 20227:00 amPRNOperational Update - 31 Dec 2021
17th Jan 202212:45 pmPRNHolding(s) in Company
31st Dec 202112:41 pmRNSSecond Price Monitoring Extn
31st Dec 202112:35 pmRNSPrice Monitoring Extension
15th Dec 20217:00 amPRNAcquisition: Blyvoor Gold Surface Tailings
6th Dec 20219:00 amPRNSecondary Listing on A2X Markets
3rd Dec 20217:00 amPRNRetraction of TR-1 Form
1st Dec 20217:00 amPRNHolding(s) in Company
30th Nov 20217:00 amPRNNew Revolving Credit Facility Becomes Effective
26th Nov 20217:00 amPRNResult of AGM and Salient Dividend Dates
29th Oct 20217:01 amEQSPan African Resources (PAF): Everything falling into place
27th Oct 20218:30 amPRNNotice of AGM & No Change Statement
1st Oct 20211:30 pmPRNDirector/PDMR Shareholding
22nd Sep 20211:00 pmPRNDirector/PDMR Shareholding
21st Sep 20217:00 amPRNDirectorate Change
20th Sep 20212:30 pmPRNCOO Seriously Injured
16th Sep 20211:00 pmPRNDirector/PDMR Shareholding
15th Sep 202112:00 pmPRNDirector/PDMR Shareholding
15th Sep 20217:00 amRNSProvisional summarised audited year end results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.