Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Regulatory News (PAF)

Share Price Information for Pan African (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 24.00
Bid: 23.80
Ask: 24.05
Change: -0.30 (-1.23%)
Spread: 0.25 (1.05%)
Open: 23.60
High: 24.00
Low: 23.40
Prev. Close: 24.30
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Results of Drilling Programme at Bramber Tailings Dam

9 Jun 2011 08:00

Pan African Resources PLC

(`Pan African' or the 'Company' or the `Group')

Incorporated and registered in England and Wales under Companies Act 1985 with the registered number: 3937466 on 25 February 2000

Share Code on AIM: PAFShare code on JSE: PANISIN: GB0004300496

Encouraging results of drilling programme at Bramber tailings dam at Barberton Mines (Pty) Ltd

Pan African Resources PLC (`Pan African'), the African focused precious metals producer, announces the results of a drilling programme on the Bramber tailings dam at Barberton Mines (Pty) Ltd (`Barberton Mines').

Highlights:

- Indicated mineral resource declared of 148koz (3.130Mt @ 1.47g/t in situ) independently verified at a cut off grade of 0.5g/t

- Initial metallurgical test work indicates recoveries of 45% to 55%

- Order of Magnitude (`OME') study estimates capital for the project for a Carbon-in-Leach plant at ZAR120 million (approximately £11m) to treat 1.2Mt of tailings per annum at Barberton Mines for a period of approximately three years

- An additional 9Mt of dump material is currently being investigated that could increase the life of project (`LOP') from three years to ten years

- If viable this project could increase production at Barberton Mines by another 20koz per annum over the LOP

- Feasibility study on the project will be completed by Q2 of 2011/12 financial year

Jan Nelson, Chief Executive Officer of Pan African, commented: "We are very encouraged by these results that show that the re-treatment of tailings at Barberton Mines is developing into a significant stand alone gold project. Not only could it increase the current production profile of the Company by 20koz per annum but also increase the operating margin and reduce unit costs. The project at a 10% real discount rate yields a net present value of approximately ZAR350 million with an internal rate of return of approximately 85% assuming a gold price of ZAR300,000/kg. We continue to focus on organic growth opportunities within the Group to grow our earnings."

The Bramber tailings dam, which has been used as a tailings storage facility at Barberton Mines since 1986, reached the end of its operational life in January 2011. A new tailings facility was commissioned at that time. Due to the current high gold price and low cost associated with the re-treatment of tailings dams, the Company undertook a drilling programme to evaluate the dam as a source of additional production ounces.

A total of 308 auger drillholes were drilled on a grid of 20 metre x 20 metre representing approximately 6,074 metres. Samples of each hole were taken at 1.5 metres intervals and composited at 3 metres intervals representing a total of 2,344 samples taken for assaying. Modeling and geological profiling of the boreholes confirmed two distinct depositional populations across the tailings dam which is the result of separate historical deposition that took place in two separate compartments, a higher grade BIOX® tail section and a lower concentrator/flotation tail section. Geostatistical modeling indicates 74.6koz (758kt at 3.06g/t in situ) for the BIOX® section and 72.9koz (2.369Mt at 0.96g/ t in situ) for the concentrator/flotation section. This represents a total indicated resource of 148koz (3.130Mt at 1.47g/t in situ).

A total of 10 composite samples representative of the tailings dam were submitted for metallurgical recovery test work. Initial excess cyanide test work indicates recoveries varying between 45% and 55%. Kinetic test work is being done to determine residence time that guides the process flow design for plant optimum configuration to be used in the feasibility study. The feasibility study covering plant design, final process flow design, volume throughput, chemical and reagent consumption, recoveries and capital and operating expenditure will be completed by quarter two of the 2011/12 financial year. If feasible a new plant will be constructed to treat 1.2Mt per annum of tailings for three years. An OME study completed by Matomo Projects (Pty) Ltd (`Matomo') estimates the capital cost of the plant at approximately ZAR120 million (approximately £11m). Plant construction is estimated to take 12 months.

The Company is currently drilling another 9Mt of tailings which if viable could extend the LOP from approximately three to ten years and increase the annual production profile at the mine by approximately 20koz. The drilling programme and associated metallurgical test work applicable to the expansion is expected to be completed within three months.

Bramber Tailings Mineral Inventory

Project Resource Mass Grade Mineral Resource Category (kt) (g/t) (kg) (koz) Surface Tailings Bramber Measured Tailings Dam Indicated 3,130 1.47 4,600 148 Inferred Total 3,130 1.47 4,600 148 Total Surface Tailings 3,130 1.47 4,600 148

Barberton Mines Mineral Inventory

* Inclusive of the Bramber Tailings Mineral Inventory

Barbeton Resource Mass Grade Contained Gold Mines Mineral Category Inventory (kt) (g/t) (kg) (koz) Measured 2,750 8.45 23,300 750 Indicated 7,340 5.50 40,300 1,300 Inferred 2,510 8.01 20,100 650 Total 12,600 6.64 83,700 2,700

Total Measured and Indicated 10,090 6.30 63,600 2,050

Reserve Category Mass Grade Contained Gold (kt) (g/t) (kg) (koz) Proved 1,220 7.27 8,900 290 Probable 2,610 8.48 22,200 710 Total Proved and Probable 3,830 8.12 31,100 1,000Notes:

- Please note differences may occur due to rounding.

- The table above is only with respect to Barberton Mines. The Company is currently updating the Group's Mineral Inventory statement and this will be announced in due course.

- Frans Chadwick, a member of the South African Council for Professional and Technical Surveyors and an employee of Barberton Mines, has signed off on the above Mineral Inventory for Barberton Mines.

- Dave Briggs, a member of South African Council for Natural Scientists and an independent Geological Consultant signed off on the Mineral Inventory for the Bramber Tailings Inventory.

- The above resource is compliant with the South African Mineral Resources Code.

Johannesburg9 June 2011JSE Sponsor:

Macquarie First South Advisers (Pty) Limited

Enquiries:South Africa UK Pan African RBC Capital Markets Jan Nelson, Chief Executive Officer Martin Eales +27 (0) 11 243 2900 +44 (0) 20 7653 4000 Pan African St James's Corporate Services Limited Nicole Spruijt, Public Relations Phil Dexter +27 (0) 11 243 2900 +44 (0) 20 7499 3916 Macquarie First South Advisers (Pty) Gable Communications Ltd Justine James Natalie Di-Sante/Melanie de Nysschen +44 (0)20 7193 7463

+27 (0) 11 583 2000

vendor
Date   Source Headline
14th Feb 20247:00 amPRNUnaudited Interim financial results for the six months ended 31 december 2023
2nd Feb 20247:00 amPRNTrading Statement
29th Jan 20243:45 pmPRNHolding(s) in Company
22nd Jan 20247:00 amPRNOperational Update for the Half Year ended 31 December 2023 (H1 FY2024)
7th Dec 202310:00 amPRNHolding(s) in Company
24th Nov 20237:00 amPRNResult of AGM & Salient Dividend Dates
22nd Nov 20237:00 amPRNInterim Production Update for half year ending 31 December 2023
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
8th Nov 20232:45 pmPRNDirector/PDMR Shareholding
7th Nov 20231:30 pmPRNDirector/PDMR Shareholding
31st Oct 20237:00 amPRNNotice of AGM & Abridged Annual Financial Statements for the year ended 30 June 2023
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
13th Sep 20237:00 amPRNProvisional summarised audited results for the year ended 30 June 2023
5th Sep 202311:45 amPRNHolding(s) in Company
1st Sep 20237:00 amPRNTrading Statement for the year ended 30 June 2023
7th Aug 20237:00 amPRNOperational Update for the year ended 30 June 2023
1st Aug 20239:10 amPRNUpdate to Commissioning Date of the Mintails Project
1st Aug 20237:24 amPRNMintails Project Funding Closed and Granting of Integrated Environmental Authorisation
1st Jun 20227:00 amPRNAppointment of Berenberg as Joint Broker
12th Apr 20227:00 amPRNTransaction in Own Shares
11th Apr 20227:00 amPRNHolding(s) in Company
7th Apr 20227:00 amPRNTransaction in Own Shares
4th Apr 20227:07 amPRNTransaction in Own Shares
1st Apr 20227:00 amPRNShare Buyback Programme
14th Mar 20227:00 amPRNGold Exploration Programme in Sudan
7th Mar 20229:30 amPRNHolding(s) in Company
7th Mar 20227:00 amPRNHolding(s) in Company
2nd Mar 20227:00 amPRNHolding(s) in Company
16th Feb 20227:00 amPRNUnaudited Interim Results for 6m to 31 Dec 2021
19th Jan 20227:00 amPRNOperational Update - 31 Dec 2021
17th Jan 202212:45 pmPRNHolding(s) in Company
31st Dec 202112:41 pmRNSSecond Price Monitoring Extn
31st Dec 202112:35 pmRNSPrice Monitoring Extension
15th Dec 20217:00 amPRNAcquisition: Blyvoor Gold Surface Tailings
6th Dec 20219:00 amPRNSecondary Listing on A2X Markets
3rd Dec 20217:00 amPRNRetraction of TR-1 Form
1st Dec 20217:00 amPRNHolding(s) in Company
30th Nov 20217:00 amPRNNew Revolving Credit Facility Becomes Effective
26th Nov 20217:00 amPRNResult of AGM and Salient Dividend Dates
29th Oct 20217:01 amEQSPan African Resources (PAF): Everything falling into place
27th Oct 20218:30 amPRNNotice of AGM & No Change Statement
1st Oct 20211:30 pmPRNDirector/PDMR Shareholding
22nd Sep 20211:00 pmPRNDirector/PDMR Shareholding
21st Sep 20217:00 amPRNDirectorate Change
20th Sep 20212:30 pmPRNCOO Seriously Injured
16th Sep 20211:00 pmPRNDirector/PDMR Shareholding
15th Sep 202112:00 pmPRNDirector/PDMR Shareholding
15th Sep 20217:00 amRNSProvisional summarised audited year end results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.