Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Share Price Information for Pan African Resources (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 24.75
Bid: 24.60
Ask: 24.70
Change: -0.80 (-3.13%)
Spread: 0.10 (0.407%)
Open: 25.65
High: 25.65
Low: 24.30
Prev. Close: 25.55
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Barberton Tailings Retreatment Plant.

4 Apr 2012 10:00

4thApril 2012 Pan African Resources PLC (`Pan African' or the `Company')

Incorporated and registered in England and Wales under Companies Act 1985 with

registered number 3937466 on 25 February 2000 AIM: PAF/JSE: PAN ISIN: GB0004300496

Ground-breaking eventmarks the start of construction of Pan African'sBarberton Tailings Retreatment Plant.

Pan African has today commenced bulk earthworks for the construction of its Barberton Tailings Retreatment Plant ("BTRP"), to be constructed on the Barberton Property, adjacent to the current Bramber tailings dam.

The commencement of bulk earthworks marks the start of the civil work that will entail bulk excavations for creating the terracing of the BTRP which will become the foundation for the mechanical construction of the Carbon-in-Leach tanks, scheduled to commence in June 2012.

Management contractor firm, Basil Read-Matoma, which designed the plant and will procure and construct it, has established itself on site with a temporary office. The team will be on site for the next two years, until the commissioning of the plant, which is scheduled for April 2013, ramping up to full production in August 2013.

Jan Nelson CEO of Pan African Resources was on site to break ground and noted: "The beginning of construction on this plantresemblesa mirror image of our successful Phoenix platinum project. The BTRP is no more complex than Phoenix but isa much larger scaledproject and will enable 100 tons of feed an hour, compared to the current 30 tons an hour at Phoenix. We have the same highly skilled team from BasilRead-Matoma dedicated to this projectwho willworktogether with our management team at Barberton. I am therefore confident of the same outcome for a successful commissioning in April 2013."

ENDS

About the project

The BTRP comprises a total resource of ~654koz (13.7Mt @ 1.38g/t) and a reserve of ~248koz (13.7Mt @ 0.56g/t)

The BTRP has been designed to treat 100,000 tons tailings per month through a Carbon in Leach circuit using electro-winning and smelting to produce a saleable product. Current tailings from the Fairview Concentrator and the Fairview BIOX( ®) plant totalling 14,000 tons per month will be routed via a pipeline to the BTRP for treatment and 86,000 tons per month will be reclaimed from the Bramber tailings storage facility .

The electric power requirement of 6000kW to the BTRP will be supplied via an overhead 11kV line from the South African electricity utility, Eskom.

At a gold price of ZAR400,000 per kilogram Phase One of the project indicates an NPV of GBP27 million, at a total cash cost of ZAR194,000 per kilogram (ZAR114 per ton) over the life of the project. Capex is estimated at GBP27 million (ZAR325 million) over a three year period. Phase One is expected to retreat 1.2 Mt of gold tailings per annum, with a total life of project production of 160, 000oz of gold at an average recovered grade of 0,54g/t. This would increase the annual production profile at Barberton by approximately 20,000 oz per annum.

EnquiriesSouth Africa UK Pan African Resources RBC Capital Markets

Jan Nelson, Chief Executive Officer Martin Eales / James Kelly

+27 (0) 11 243 2900 +44 (0) 20 7029 7881 One Capital, JSE Sponsor St James's Corporate Services Limited Sholto Simpson / Megan Young / Nicholas Tyler Phil Dexter +27 (0) 11 550 5000 +44 (0) 20 7499 3916 Vestor Investor Relations Gable Communications Louise Brugman Justine James +27 (0) 11 787 3015 +44 (0) 20 7193 7463

XLON
Date   Source Headline
14th Mar 20082:00 pmPRNDirector/PDMR Shareholding
10th Mar 20087:00 amPRNFurther re Manica Gold Project, Mozambique
29th Feb 20082:00 pmPRNDirector/PDMR Shareholding
21st Feb 20087:00 amPRNInteirm Results & Directorship Change
20th Feb 20087:00 amPRNStatement re Earn-in Agreement
29th Jan 20087:00 amPRNManica Gold Project, Mozambique - Drilling Update
18th Jan 200812:32 pmPRNResult of AGM
20th Dec 20077:00 amPRNFinal Results For the period ended 30 June 2007
27th Nov 20077:00 amPRNDrilling Update
19th Nov 20077:00 amPRNDrilling Update - Manica Project, Mozambique
29th Oct 20076:00 amPRNStatement re Corporate Presentation
8th Oct 20077:00 amPRNDirectorate Change
21st Sep 20077:01 amRNSCorporate Presentation
19th Sep 20077:01 amRNSIssue of Equity
11th Sep 200712:09 pmRNSCorporate Presentation
10th Sep 200710:17 amRNSResource Upgrade
7th Sep 20072:03 pmRNSHolding(s) in Company
30th Aug 200712:43 pmRNSIssue of Shares
20th Aug 20074:51 pmRNSAIM Rule 26
31st Jul 20072:29 pmRNSRe-Admission to Trading
31st Jul 20078:00 amRNSCancel - Pan African Res
27th Jul 20074:11 pmRNSResults of EGM
27th Jul 20077:01 amRNSNotification of Voting Rights
17th Jul 20077:00 amRNSDirector/PDMR Shareholding
11th Jul 200710:26 amRNSSchedule 1 - Pan African
28th Jun 20077:04 amRNSAcquisition
26th Jun 20077:02 amRNSBarberton Update
24th May 20077:15 amRNSInterim Results
11th May 20074:17 pmRNSIssue of Shares
27th Dec 20067:01 amRNSInterim Results
22nd Dec 20069:34 amRNSTotal Voting Rights
20th Dec 20068:39 amRNSSuspension-Pan African
20th Dec 20067:30 amRNSProposed Acquisition
14th Nov 20067:02 amRNSManica: independent valuation
2nd Oct 20068:36 amRNSManica metallurgical results
27th Jul 200612:15 pmRNSResult of AGM
30th Jun 20061:37 pmRNSFinal Results
20th Jun 20067:00 amRNSManica Resource Upgade
17th May 200612:23 pmRNSProject Update
20th Apr 20069:35 amRNSManica Drill Results -Replace
20th Apr 20068:44 amRNSManica Drill Results
7th Apr 20064:55 pmRNSHolding(s) in Company
5th Apr 20067:01 amRNSPan African raises GBP 1.7m
13th Mar 20067:01 amRNSNew CAR Exploration Licences
6th Mar 20067:02 amRNSCAR Project Update
2nd Feb 200612:04 pmRNSVerification of 1Moz Resource
26th Jan 20068:57 amRNSUpdate of Exploration Results
12th Jan 20067:01 amRNSDrilling Programme Commences
9th Jan 20069:18 amRNSAcquisition Manica Project
23rd Dec 20057:01 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.