The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.50
Ask: 2.90
Change: -0.40 (-12.90%)
Spread: 0.40 (16.00%)
Open: 3.05
High: 3.05
Low: 2.45
Prev. Close: 3.10
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update - Junior Lake

23 Jan 2012 07:01

RNS Number : 9131V
Landore Resources Limited
23 January 2012
 



LANDORE RESOURCES LIMITED

  23rd January 2012

 

DRILLING UPDATE

JUNIOR LAKE NICKEL PROJECT

 B4-7 DEPOSIT

 

Highlights: 

 

·; Drilling down plunge on the B4-7 deposit has intersected massive sulphide mineralization reporting elevated grades of Nickel, Copper, Cobalt and Platinum Group Elements. To date, this lower zone has been delineated along 125 metres and remains open along strike in both directions and down plunge.

 

·; Drilling on the B4-7 hanging wall zone has successfully extended the known mineralization along strike to the east, with drill-hole 0411-360 reporting 2.23 metres at 1.11% Nickel, 2,235ppb Palladium and 340ppb Platinum.

 

·; Previous drill results on the B4-7 hanging wall zone include 12.4 metres at 0.86% Nickel, 0.47% Copper, 0.06% Cobalt, 970ppb Palladium and 250ppb Platinum on drill-hole 0406-93.

 

A drilling program, consisting of 9 diamond core NQ size holes for 4,796 metres, has recently been completed designed to extend the B4-7 deposit down plunge and to further test the sub-parallel hanging wall zone.

 

Mineralised intersections include:

Drill-hole

From

Width

Ni

Cu

Co

Pd

Pt

Au

No

Metres

Metres

%

%

%

ppb

ppb

ppb

0411-358B

362.00

6.45

0.06

0.01

0.00

1,881

298

20

including

366.00

1.00

0.05

0.01

0.00

8,445

908

75

and

436.60

11.60

0.67

0.29

0.06

966

318

45

including

436.60

2.90

0.73

0.34

0.07

1,394

700

31

and

452.48

7.60

0.69

0.25

0.05

885

492

48

including

452.48

3.52

0.89

0.21

0.06

1,521

771

48

0411-360

325.77

2.23

1.11

0.18

0.04

2,235

340

9

0411-361

466.76

2.86

1.20

0.55

0.04

768

95

35

and

480.87

17.35

0.64

0.53

0.05

316

41

91

including

480.87

4.13

0.89

0.55

0.07

311

17

33

0411-363

495.32

1.74

0.84

0.37

0.07

480

155

18

and

516.05

4.00

0.49

1.02

0.05

579

88

63

and

530.00

12.72

0.60

0.56

0.05

272

110

37

including

536.50

3.66

0.91

0.24

0.08

341

135

23

0411-365

461.60

3.30

0.61

0.79

0.09

294

33

15

0411-366

496.45

1.93

0.63

1.09

0.04

2392

39

82

*The actual true thickness of mineralisation is estimated to represent between 75-80% of the intervals shown in the above table.

 

 

 

The Junior Lake property:

 

The Junior Lake property, 100% owned by Landore, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay, and is host to: the VW Nickel deposit; the B4-7 Nickel-Copper-Cobalt-PGEs deposit; the B4-8 prospect and numerous other highly prospective mineral occurrences.

 

The combined resources (Canadian National Instrument (NI) 43-101 compliant) of the VW and B4-7 deposits delineated to date total 48,281 tonnes of nickel equivalent (NiEq), 82 per cent of which is in the Indicated category. Both deposits remain open down dip and along strike to the east and west.

 

In 2008, Landore was granted three Mining leases, which include mining and surface rights, over an area of 3,676 hectares encompassing the VW Nickel deposit and the B4-7 Nickel-Copper-Cobalt-PGEs deposit, each of which was granted for an initial term of 21 years and subsequently renewable for further terms of 21 years.

 

To date, Landore has completed advanced metallurgical and environmental base line studies on the Junior Lake deposits in preparation for commencement of pre-feasibility studies.

 

Landore believes that for the Junior Lake Nickel projects to be economically viable, the above tonnage needs to be increased by 20 to 30 %. Accordingly, Landore's exploration effort during 2011 has been focused on the discovery of additional mineralisation in the vicinity of the two main deposits.

 

B4-7 Nickel-Copper-Cobalt-PGEs deposit (B4-7):

The B4-7 deposit is located in the centre of the above lease area approximately 3 kilometres to the northwest of the VW deposit. The B4-7 deposit mineralisation is hosted within a sub-vertical massive sulphide vein with stringers, net-textured and disseminated sulphides in the immediate hanging wall.

 

In Q1 2010, an NI 43-101 compliant report and resource estimate upgrade for the B4-7 deposit was completed. The resource reported 26,521 tonnes NiEq, at a 0.25% Nickel cut-off.

 

The B4-7 deposit outcrops at surface with the upper 150 metres of the deposit being amenable to lower cost open pit mining. Below 150 metres, the grade improves sufficiently for underground mining.

 

Current metal prices results in an increase in the nickel equivalent grade. This positively impacts the economic viability of the B4-7 deposit and facilitates the advancement of this deposit to development stage.

 

During Q4 2011, a drilling campaign, consisting of 9 diamond core NQ size holes for 4,796 metres, was completed on the B4-7 deposit designed to extend it down plunge and to further test the adjacent hanging wall zone. This campaign has proved highly successful, intersecting massive sulphide mineralization of similar grade to the B4-7 resource at depth along 125 metres of strike.

 

The B4-7 deposit, so far delineated over 650 metres of strike, remains open to the east and west along strike and down plunge to the northwest. A previously completed airborne electromagnetic survey suggests the conductive horizon hosting the B4-7 deposit persists for an additional 800 metres to the west.

 

The B4-7 hanging wall zone, consisting of a series of sub-vertical contacts within metamorphosed gabbros is located between 40 and 80 metres to the north and sub-parallel to the main B4-7 massive sulphide vein. The zone contains significant palladium and platinum, in addition to elevated nickel, copper and cobalt.

 

Up to now, there have not been sufficient drill intersections on this zone to allow the definition of a resource for inclusion with the main B4-7 deposit. The recent drilling campaign has been successful at further delineating the hanging wall zone at depth and along 250 metres of strike. This zone remains open along strike in both directions and down plunge.

 

The results of the recent drilling campaign demonstrate that there is the potential to increase the size of the B4-7 deposit and contribute significantly to the overall economic viability of the

Junior Lake Nickel project.

 

2012 Junior Lake Exploration Program:

A 10,000 metre infill drill programme is scheduled to commence on the B4-7 deposit in February 2012. The program has been designed to expand the existing deposit, as well as provide sufficient information and drill density to advance the inferred portions of the deposit to indicated status.

 

Michele Tuomi, (P.Geo., BSc. Geology), a Senior Geologist of Landore Resources Canada Inc. and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

For more information please contact:

 

Bill Humphries, Chairman

Richard Prickett, Chief Executive Officer

Landore Resources Limited

Tel: 07734 681262

Tel: 07775 651421

www.landore.com

Simon Raggett /Angela Peace

Strand Hanson Limited

Nominated Adviser/ Broker

Tel: 020 7409 3494

 

David Bick

Tel: 07831 381201

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAEFEAEAAEFF
Date   Source Headline
23rd Sep 20147:00 amRNSInterim Results
15th Sep 20147:00 amRNSDrilling Results
19th Aug 20147:00 amRNSDrilling Update
22nd Jul 20147:00 amRNSGrant of Options
17th Jul 201412:00 pmRNSHolding(s) in Company
7th Jul 20147:00 amRNSOversubscribed Placing and Subscription
2nd Jul 20143:33 pmRNSResult of AGM
28th May 20143:53 pmRNSChange of Broker
20th May 201412:18 pmRNSPosting of Annual Report
15th May 20147:00 amRNSFinal Results
15th May 20147:00 amRNSAmendment to Loan Agreement with Lamaune Iron Inc.
23rd Apr 20147:00 amRNSJunior Lake Nickel-Copper Project Update
24th Mar 20147:00 amRNSProgress Update
18th Feb 20147:00 amRNS3D Geophysics Survey Complete
4th Feb 20147:00 amRNSCommencement of 3D Survey
13th Jan 20147:00 amRNSJunior Lake Geophysics Survey
25th Nov 20134:30 pmRNSGrant of Options
25th Oct 201311:19 amRNSHolding(s) in Company
15th Oct 20137:00 amRNSSubscription
30th Sep 20137:00 amRNSUpdate - Junior Lake Nickel-Copper Property
19th Sep 20137:00 amRNSHalf Yearly Report
1st Jul 201311:22 amRNSGrant of Options
20th Jun 201311:30 amRNSResult of AGM
14th May 20137:00 amRNSFinal Results
8th May 20137:00 amRNSChange of Adviser
8th Apr 20137:00 amRNSDrilling Update - Junior Lake Nickel Project
11th Mar 20137:00 amRNSSubscription
17th Jan 20137:00 amRNSResource Update - Junior Lake
12th Dec 20127:00 amRNSDrilling and Geophysical Survey Update
16th Oct 20127:00 amRNSDrilling, Geophysics Survey - Junior Lake
26th Sep 20122:45 pmRNSGrant of Options
20th Sep 201211:04 amRNSTotal Voting Rights
19th Sep 201210:14 amRNSAppointment of Broker
12th Sep 20127:00 amRNSSubscription
3rd Sep 20127:00 amRNSDrilling Update - Junior Lake Project
21st Aug 20127:00 amRNSHalf Yearly Report
25th Jul 20127:00 amRNSDrilling Report
12th Jul 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
20th Jun 20123:11 pmRNSResult of AGM
20th Jun 20127:00 amRNSHolding(s) in Company
29th May 201211:26 amRNSFinal Results
22nd May 20127:00 amRNSDrilling Report
18th Apr 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
21st Mar 20124:37 pmRNSGrant of options
13th Mar 201211:15 amRNSHolding(s) in Company
28th Feb 20127:00 amRNSAdditional Listing
21st Feb 201210:42 amRNSSubscription
23rd Jan 20127:01 amRNSDrilling Update - Junior Lake
3rd Nov 201111:36 amRNSDirector Declaration
2nd Sep 20117:00 amRNSInterim Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.