Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling Report

22 May 2012 07:00

RNS Number : 7759D
Landore Resources Limited
22 May 2012
 



LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

22nd May 2012

 

DRILLING UPDATE

JUNIOR LAKE NICKEL PROJECT

 B4-7 DEPOSIT

 

Highlights: 

 

·; The recently completed drilling campaign on the eastern section of the B4-7 deposit has significantly enhanced the volume of B4-7 massive sulphide mineralization within the upper 150-metre portion of the deposit along 500 metres of strike.

 

·; Drilling to date has consistently intersected massive sulphide mineralisation, including drill-hole 0412-385 reporting 30.08 metres with grades of 0.74% Nickel, 0.45% Copper, 0.07% Cobalt, 587ppb Palladium, and 174ppb Platinum.

 

·; Drilling continues on the western section of the B4-7, scheduled for completion Q3 2012. The B4-7 remains open down dip and along strike to the east and west.

 

The current drilling campaign, started in February 2012, is aimed at expanding the B4-7 deposit and providing adequate drill density to bring inferred portions of the deposit to indicated status. To date, 56 diamond core NQ size holes and 2 re-entered holes (0412-367 to 0412-422 and 0409-237/238) for 9,772 metres, have been completed. Assays are outstanding for 22 drill-holes and will be reported as they become available.

 

B4-7 mineralised intersections include: 

Drill-hole

From

Width*

Ni

Cu

Co

Pd

Pt

Au

No

Metres

Metres

%

%

%

ppb

ppb

ppb

0412-376

285.00

8.80

0.85

0.72

0.07

497

216

93

0412-380

116.35

4.68

0.90

0.30

0.06

478

32

17

0412-381

256.51

13.17

0.79

0.57

0.06

633

142

13

0412-382

145.11

7.90

0.91

0.55

0.07

541

95

15

0412-383

96.65

5.40

0.75

0.51

0.05

598

82

25

0412-384

201.97

6.14

0.83

0.38

0.07

673

202

19

0412-385

139.00

30.08

0.74

0.45

0.07

587

174

21

0412-386

20.48

20.17

0.65

0.62

0.07

703

155

39

0412-387

109.24

11.50

0.62

0.43

0.07

825

268

30

0412-388

44.90

8.41

0.91

0.48

0.07

535

159

24

0412-390

26.40

6.46

0.89

0.70

0.09

749

188

25

0412-393

56.00

11.78

0.53

0.51

0.07

616

194

36

0412-394

33.00

3.39

0.55

0.89

0.26

232

133

76

0412-395

78.24

9.71

0.44

0.31

0.04

412

207

23

0412-396

79.36

11.34

0.63

0.38

0.05

356

162

45

0412-397

115.00

9.10

0.52

0.29

0.04

564

128

18

0412-398

88.00

16.40

0.50

0.25

0.04

749

226

18

*The actual true thickness of mineralisation is estimated to represent between 75-80% of the intervals shown in the above table.

 

This campaign is also targeting the adjacent polymetallic zone (Alpha zone) located up to 70 metres to the north of the B4-7 main mineralized zone at 75W and merging with the main zone at approximately 350E. The Alpha zone consists of a series of sub-vertical contacts within metamorphosed gabbros andcontains significant palladium and platinum, in addition to elevated nickel, copper and cobalt. Previously there were insufficient intersections of the Alpha zone for its inclusion into the resource. However the current drilling is successfully establishing continuity along strike.

 

Polymetallic alpha zone mineralised intersections include:

Drill-hole

From

Width*

Pd

Pt

Ni

Cu

Co

Au

No

Metres

Metres

ppb

ppb

%

%

%

ppb

0409-384

65.00

2.17

1,610

280

0.47

0.09

0.03

2

0409-385

74.38

1.07

2,910

441

0.66

0.45

0.04

5

0412-387

49.50

4.39

1,379

222

0.41

0.18

0.03

6

0412-391

68.46

2.94

3,636

579

0.74

0.11

0.04

6

0412-393

12.76

1.04

1,405

906

0.21

0.14

0.02

6

0412-397

106.68

0.83

2,830

926

0.30

0.27

0.03

22

0412-398

91.79

0.98

8,120

2,240

0.84

0.09

0.05

61

*The actual true thickness of mineralisation is estimated to represent between 75-80% of the intervals shown in the above table.

 

The Junior Lake property:

The Junior Lake property, 100% owned by Landore, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay, and is host to; the VW Nickel deposit; the B4-7 Nickel-Copper-Cobalt-PGMs deposit; the B4-8 prospect and numerous other highly prospective mineral occurrences.

 

The combined resources (Canadian National Instrument (NI) 43-101 compliant) of the VW and B4-7 deposits delineated to date, total 48,281 tonnes of nickel equivalent (NiEq), 82 per cent of which is in the Indicated category. Both deposits remain open down dip and along strike to the east and west.

 

Landore believes that for the Junior Lake Nickel projects to be economically viable, the above tonnage needs to be increased by 20 to 30 %. Accordingly, Landore's exploration effort is now focused on the discovery of additional mineralisation in the vicinity of the two main deposits.

 

B4-7 Nickel-Copper-Cobalt-PGEs deposit:

The B4-7 deposit is located approximately 3 kilometres to the northwest of the VW deposit. The B4-7 deposit mineralisation is hosted within a sub-vertical massive sulphide vein with stringers, net-textured and disseminated sulphides in the immediate hanging wall. In Q1 2010, an NI 43-101 compliant report and resource estimate upgrade for the B4-7 deposit was completed. The resource reported 26,521 tonnes NiEq, at a 0.25% Nickel cut-off.

 

2012 Planned Works:

The results of the current drilling campaign on the B4-7 deposit are highly encouraging having significantly increased the potential tonnage amenable to open pit development. Landore will utilize these drilling results to produce an updated resource estimate, anticipated for completion in Q3 2012. Pre-feasibility studies on the combined B4-7 and the VW deposits will be initiated in Q4 2012.

 

Michele Tuomi, (P.Geo., BSc. Geology), a Senior Geologist of Landore Resources Canada Inc. and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

 

 

For more information please contact:

 

Bill Humphries, Chairman

Richard Prickett, Chief Executive Officer

Landore Resources Limited

Tel: 07734 681262

Tel: 07775 651421

www.landore.com

Simon Raggett /Angela Hallett

Strand Hanson Limited

Nominated Adviser/ Broker

Tel: 020 7409 3494

 

David Bick

Tel: 07831 381201

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLXFLFLLEFEBBQ
Date   Source Headline
4th Jun 20267:00 amRNS-RCorporate Presentation and Newsletter
3rd Jun 20267:00 amRNSFinal Results for the Year Ended 31 December 2025
7th May 20267:00 amRNSCorporate Update and 2026 Field Programme
5th May 20267:00 amRNSAppointment of Nominated Adviser and Joint Broker
1st May 20267:00 amRNSDirectorate change
31st Mar 20267:06 amRNS-RAwarded OJEP Grant
16th Feb 20267:00 amRNSCompletion of Storm Option Agreement
22nd Jan 20267:30 amRNSRestoration - Landore Resources Limited
22nd Jan 20267:00 amRNSUpdated Mineral Resource Estimates for Junior Lake
21st Jan 20267:00 amRNSUpdate re Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
11th Dec 20253:31 pmRNSTemporary Suspension of Trading on AIM
11th Dec 202512:59 pmRNSSuspension - Landore Resources Limited
3rd Dec 20257:00 amRNSStorm Enters Agreement to Sell Miminiska Project
10th Nov 20257:00 amRNSAmalgamation of Landore Canada and Lamaune
27th Oct 20257:00 amRNS£1,465,000 Equity Fundraise
17th Oct 20254:39 pmRNSExercise of Warrants and Issue of Equity
16th Oct 20257:00 amRNSAppointment of Alexander Shaw to Storm Board
29th Sep 20258:52 amRNSInterim Results
5th Aug 20254:11 pmRNSResult of Annual General Meeting
27th Jun 20256:10 pmRNSFinal Results and Notice of Annual General Meeting
18th Jun 20257:00 amRNSPositive Drill Campaign Results at BAM
6th May 20257:00 amRNSDrilling Campaign at BAM Gold Project Completed
25th Apr 20257:58 amRNSCompletion of BAM Mineral Rights Acquisition
4th Apr 20251:08 pmRNSDirector’s Dealing
26th Mar 20257:00 amRNSAcquisition of Additional BAM Mineral Rights
24th Mar 20257:00 amRNSReceipt of Option Payment from Storm
17th Mar 20257:00 amRNSDrilling Programme Commences on BAM
3rd Mar 20257:00 amRNSDrill Core Sampling Identifies Gold Upside
3rd Mar 20257:00 amRNSExercise of Warrants and Issue of Equity
12th Feb 20257:00 amRNSSampling Programme Identifies New Gold Anomalies
19th Dec 20247:00 amRNSAppointment of Joint Broker
13th Nov 20247:00 amRNSReceipt of Option Payment from Storm
30th Sep 20247:00 amRNSInterim Results to 30 June 2024
16th Sep 20247:00 amRNSBAM Gold Project Update
19th Aug 20247:00 amRNSUpdate on Option Agreement
17th Jul 20247:00 amRNSNotification of Major Holdings
16th Jul 202412:21 pmRNSCORRECTION: Notification of Major Holdings
16th Jul 20247:00 amRNSNotification of Major Holdings
12th Jul 20243:03 pmRNSNotification of Major Holdings
8th Jul 20241:23 pmRNSRESULT OF AGM, DIRECTORATE CHANGE & TVR
3rd Jul 20243:30 pmRNSOPTION AGREEMENT ON MIMINISKA LAKE & KEEZHIK LAKE
24th Jun 202412:30 pmRNSPosting of 2023 Annual Report and Notice of AGM
21st Jun 20242:30 pmRNSHolding(s) in Company
17th Jun 20247:00 amRNSFinal Results and Notice of AGM
12th Jun 20247:00 amRNSFundraise, Proposed CEO Appointment & Board Change
28th May 20247:00 amRNSStorm Option Agreement and Corporate Updates
15th Feb 20247:00 amRNS2023 Soil Sampling Identifies New Gold Trends
8th Feb 20246:09 pmRNSFurther Amendment to Storm Option Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.