Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.60
Ask: 2.80
Change: 0.00 (0.00%)
Spread: 0.20 (7.692%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.70
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update - Junior Lake

23 Jan 2012 07:01

RNS Number : 9131V
Landore Resources Limited
23 January 2012
 



LANDORE RESOURCES LIMITED

  23rd January 2012

 

DRILLING UPDATE

JUNIOR LAKE NICKEL PROJECT

 B4-7 DEPOSIT

 

Highlights: 

 

·; Drilling down plunge on the B4-7 deposit has intersected massive sulphide mineralization reporting elevated grades of Nickel, Copper, Cobalt and Platinum Group Elements. To date, this lower zone has been delineated along 125 metres and remains open along strike in both directions and down plunge.

 

·; Drilling on the B4-7 hanging wall zone has successfully extended the known mineralization along strike to the east, with drill-hole 0411-360 reporting 2.23 metres at 1.11% Nickel, 2,235ppb Palladium and 340ppb Platinum.

 

·; Previous drill results on the B4-7 hanging wall zone include 12.4 metres at 0.86% Nickel, 0.47% Copper, 0.06% Cobalt, 970ppb Palladium and 250ppb Platinum on drill-hole 0406-93.

 

A drilling program, consisting of 9 diamond core NQ size holes for 4,796 metres, has recently been completed designed to extend the B4-7 deposit down plunge and to further test the sub-parallel hanging wall zone.

 

Mineralised intersections include:

Drill-hole

From

Width

Ni

Cu

Co

Pd

Pt

Au

No

Metres

Metres

%

%

%

ppb

ppb

ppb

0411-358B

362.00

6.45

0.06

0.01

0.00

1,881

298

20

including

366.00

1.00

0.05

0.01

0.00

8,445

908

75

and

436.60

11.60

0.67

0.29

0.06

966

318

45

including

436.60

2.90

0.73

0.34

0.07

1,394

700

31

and

452.48

7.60

0.69

0.25

0.05

885

492

48

including

452.48

3.52

0.89

0.21

0.06

1,521

771

48

0411-360

325.77

2.23

1.11

0.18

0.04

2,235

340

9

0411-361

466.76

2.86

1.20

0.55

0.04

768

95

35

and

480.87

17.35

0.64

0.53

0.05

316

41

91

including

480.87

4.13

0.89

0.55

0.07

311

17

33

0411-363

495.32

1.74

0.84

0.37

0.07

480

155

18

and

516.05

4.00

0.49

1.02

0.05

579

88

63

and

530.00

12.72

0.60

0.56

0.05

272

110

37

including

536.50

3.66

0.91

0.24

0.08

341

135

23

0411-365

461.60

3.30

0.61

0.79

0.09

294

33

15

0411-366

496.45

1.93

0.63

1.09

0.04

2392

39

82

*The actual true thickness of mineralisation is estimated to represent between 75-80% of the intervals shown in the above table.

 

 

 

The Junior Lake property:

 

The Junior Lake property, 100% owned by Landore, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay, and is host to: the VW Nickel deposit; the B4-7 Nickel-Copper-Cobalt-PGEs deposit; the B4-8 prospect and numerous other highly prospective mineral occurrences.

 

The combined resources (Canadian National Instrument (NI) 43-101 compliant) of the VW and B4-7 deposits delineated to date total 48,281 tonnes of nickel equivalent (NiEq), 82 per cent of which is in the Indicated category. Both deposits remain open down dip and along strike to the east and west.

 

In 2008, Landore was granted three Mining leases, which include mining and surface rights, over an area of 3,676 hectares encompassing the VW Nickel deposit and the B4-7 Nickel-Copper-Cobalt-PGEs deposit, each of which was granted for an initial term of 21 years and subsequently renewable for further terms of 21 years.

 

To date, Landore has completed advanced metallurgical and environmental base line studies on the Junior Lake deposits in preparation for commencement of pre-feasibility studies.

 

Landore believes that for the Junior Lake Nickel projects to be economically viable, the above tonnage needs to be increased by 20 to 30 %. Accordingly, Landore's exploration effort during 2011 has been focused on the discovery of additional mineralisation in the vicinity of the two main deposits.

 

B4-7 Nickel-Copper-Cobalt-PGEs deposit (B4-7):

The B4-7 deposit is located in the centre of the above lease area approximately 3 kilometres to the northwest of the VW deposit. The B4-7 deposit mineralisation is hosted within a sub-vertical massive sulphide vein with stringers, net-textured and disseminated sulphides in the immediate hanging wall.

 

In Q1 2010, an NI 43-101 compliant report and resource estimate upgrade for the B4-7 deposit was completed. The resource reported 26,521 tonnes NiEq, at a 0.25% Nickel cut-off.

 

The B4-7 deposit outcrops at surface with the upper 150 metres of the deposit being amenable to lower cost open pit mining. Below 150 metres, the grade improves sufficiently for underground mining.

 

Current metal prices results in an increase in the nickel equivalent grade. This positively impacts the economic viability of the B4-7 deposit and facilitates the advancement of this deposit to development stage.

 

During Q4 2011, a drilling campaign, consisting of 9 diamond core NQ size holes for 4,796 metres, was completed on the B4-7 deposit designed to extend it down plunge and to further test the adjacent hanging wall zone. This campaign has proved highly successful, intersecting massive sulphide mineralization of similar grade to the B4-7 resource at depth along 125 metres of strike.

 

The B4-7 deposit, so far delineated over 650 metres of strike, remains open to the east and west along strike and down plunge to the northwest. A previously completed airborne electromagnetic survey suggests the conductive horizon hosting the B4-7 deposit persists for an additional 800 metres to the west.

 

The B4-7 hanging wall zone, consisting of a series of sub-vertical contacts within metamorphosed gabbros is located between 40 and 80 metres to the north and sub-parallel to the main B4-7 massive sulphide vein. The zone contains significant palladium and platinum, in addition to elevated nickel, copper and cobalt.

 

Up to now, there have not been sufficient drill intersections on this zone to allow the definition of a resource for inclusion with the main B4-7 deposit. The recent drilling campaign has been successful at further delineating the hanging wall zone at depth and along 250 metres of strike. This zone remains open along strike in both directions and down plunge.

 

The results of the recent drilling campaign demonstrate that there is the potential to increase the size of the B4-7 deposit and contribute significantly to the overall economic viability of the

Junior Lake Nickel project.

 

2012 Junior Lake Exploration Program:

A 10,000 metre infill drill programme is scheduled to commence on the B4-7 deposit in February 2012. The program has been designed to expand the existing deposit, as well as provide sufficient information and drill density to advance the inferred portions of the deposit to indicated status.

 

Michele Tuomi, (P.Geo., BSc. Geology), a Senior Geologist of Landore Resources Canada Inc. and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

For more information please contact:

 

Bill Humphries, Chairman

Richard Prickett, Chief Executive Officer

Landore Resources Limited

Tel: 07734 681262

Tel: 07775 651421

www.landore.com

Simon Raggett /Angela Peace

Strand Hanson Limited

Nominated Adviser/ Broker

Tel: 020 7409 3494

 

David Bick

Tel: 07831 381201

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAEFEAEAAEFF
Date   Source Headline
5th Jul 201711:00 amRNSAward of Share Options
3rd Jul 201712:14 pmRNSResult of AGM
28th Jun 20177:00 amRNSUpdate on BAM East Gold Project
31st May 20177:00 amRNSFinal Results
17th May 20177:00 amRNSUpdate on BAM East Gold Project
7th Apr 20178:26 amRNSAward & Update on BAM East Gold Deposit
16th Mar 201710:00 amRNSIssue of Equity and Total Voting Rights
13th Mar 201710:20 amRNSHolding(s) in Company
13th Mar 201710:15 amRNSHolding(s) in Company
3rd Mar 201712:50 pmRNSFurther Subscription
3rd Mar 20177:30 amRNSLandore Resources raises C$3.3 million
17th Feb 20177:00 amRNSMAIDEN MINERAL RESOURCE ESTIMATE AND REPORT
23rd Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
12th Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
5th Dec 20167:00 amRNSUpdate on BAM East Gold Prospect
4th Nov 201612:00 pmRNSExercise of Options and Total Voting Rights
4th Nov 20167:00 amRNSNew Corporate Presentation
20th Oct 20167:00 amRNSUpdate on BAM East Gold Prospect
28th Sep 20167:00 amRNSInterim Results
21st Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
5th Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
3rd Aug 20167:00 amRNSUpdate on BAM East Gold Prospect
11th Jul 20167:00 amRNSOption agreement to sell Root Lake Property
23rd Jun 20167:00 amRNSAward of Share Options
21st Jun 201612:00 pmRNSIssue of Shares
21st Jun 201611:52 amRNSResult of AGM
10th Jun 20167:00 amRNSSubscription
17th May 20167:00 amRNSUpdate on BAM East Gold and Junior Lake Lithium
13th May 20167:00 amRNSFinal Results
4th Apr 20167:00 amRNSSignificant Gold Discovery - Junior Lake
14th Mar 20167:00 amRNSJunior Lake Update
18th Feb 20167:00 amRNSDrilling Results
10th Feb 20167:00 amRNSOption agreement to sell Root Lake Property
8th Dec 20157:00 amRNSJunior Lake Update
30th Nov 20157:00 amRNSAdditional Listing
11th Nov 20152:32 pmRNSHolding(s) in Company
30th Oct 20154:08 pmRNSSubscription
12th Oct 20157:00 amRNSJunior Lake - Mineral Potential Investigation
29th Sep 20157:00 amRNSInterim Results
21st Sep 20157:00 amRNSJunior Lake - Geophysics Review
4th Aug 201512:15 pmRNSHolding(s) in Company
7th Jul 20157:00 amRNSJunior Lake - Independent Review
30th Jun 20151:08 pmRNSResult of AGM / Change in Board positions
19th May 20157:00 amRNSFinal Results
13th Apr 20157:00 amRNSDrilling Results
23rd Mar 201511:03 amRNSChange of Broker
4th Mar 20153:40 pmRNSHolding(s) in Company
29th Jan 20157:00 amRNSJunior Lake Nickel-Copper Project Update
19th Dec 201412:02 pmRNSDirector's Dealing
19th Nov 20147:00 amRNSJunior Lake drilling results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.