If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
5.00    -0.05 (-0.99%)
Bid:
4.80
Ask:
5.20
Spread: 0.40 (8.333%)
Market Cap: £20.46m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Drilling Results & Accelerated Drilling Programme

1 Sep 2015 07:03

RNS Number : 5850X
Rare Earth Minerals PLC
01 September 2015
 

01 September 2015

Rare Earth Minerals Plc.

("Rare Earth Minerals", "REM" or "the Company")

Sonora Drilling Results and Accelerated Drilling Programme

Rare Earth Minerals and (LSE AIM: REM) is pleased to announce the mobilisation of a second drilling rig to site and also provides an update on the drilling programme currently being undertaken as part of the pre-feasibility study ("PFS") at the Sonora Lithium Project in Mexico.

A total of nine holes (totaling 1,850 metres) have been completed of the currently planned 18 hole drilling programme (approximately 4,000 metres). As a result of the Company's recent agreement with Tesla Motors, a second rig has been mobilised to site to increase the speed of drilling, with the intention to complete the remaining holes in September 2015.

 

Analyses received from the first four holes from the Fleur concession indicate that weighted averages for lithium content in the Upper Clay is 1,862 ppm Li over 24.15 metres in thickness and the Lower Clay averages 4,871 ppm Li over 24.15 metres. The thickness in metres and grades of the significant lithium intersections are shown in Table 1 as follows:

 

Table 1: Significant Lithium drilling intersections - Sonora Lithium Project (Fleur Concession)

Hole

Unit

From (m)

To (m)

Length (m)

Li ppm

%LCE*1

ES-44

Upper Clay

74.27

105.28

31.01

2,127

1.13

Lower Clay

117.65

133.19

15.54

5,032

2.68

ES-45

Lower Clay

125.73

139.9

14.17

4,503

2.40

ES-46

Upper Clay

129.44

154.18

24.74

1,918

1.02

Lower Clay

162.64

178.62

15.98

4,605

2.45

ES-47

Upper Clay

94.84

111.55

16.71

1,287

0.69

Lower Clay

125.27

150.8

25.53

5,145

2.74

 

Note: N/D means not detected

 

* LCE = lithium carbonate (Li2CO3) Equivalent: determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3 value in percent. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

 

The programme is primarily focused on significantly increasing the Indicated Mineral Resources within the Sonora Lithium Project, as well as testing whether the high grades and near surface mineralisation identified at the La Ventana concession continue into the northern area of the Fleur concession, which immediately adjoins La Ventana to the south. The Company's resource was recently updated by SRK Consulting (UK) Limited ("SRK") to:

· Indicated resources of 1.14 million tonnes ("Mt") lithium carbonate equivalent ("LCE") contained in 95Mt of clay, at lithium ("Li") grade of 2,200 ppm

· Inferred resources of 6.3Mt LCE contained in 500 Mt of clay at a Li grade of 2,300 ppm

For further details, investors are encouraged to reference the Company's press releases dated May 13 and June 26, 2015 and/or the SRK's report that was filed on May 13, 2015 and is accessible on the Company's website.

 

Upon completion of the drill programme and assaying, SRK will deliver an updated resource model for mine design purposes, with an initial focus on the higher grade, open pit resources on the La Ventana and Fleur concessions.

 

The pre-feasibility study ("PFS") for the Sonora Lithium Project in Mexico is ongoing, with metallurgical testwork, mine design and process engineering proceeding according to schedule and due to be reported in Q1, 2016.

 

Details of REM's ownership of the Sonora Lithium Project:

REM owns a direct interest of 16.4% in Bacanora, and through that holds an indirect interest in the La Ventana asset of 16.4%. In addition to the 16.4% in Bacanora, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of Megalit S.A. de CV and Mexalit S.A. de CV of 41.47%.

The Company's Executive Chairman, David Lenigas, commented:

"The positive drilling results received to date coupled with the supply agreement with Tesla announced recently has fueled the drive to accelerate the drilling programme and the mobilisation of a second drill to the Sonora Lithium Project. We look forward to providing further updates from the ongoing drilling programme and other project development activites."

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Ends

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

Notes to Editors:

About Rare Earth Minerals Plc:

Rare Earth Minerals Plc is a London listed company (LSE AIM: REM) with significant interest in the Sonora Lithium Project in northern Mexico, and in the Yangibana Rare Earths Element Project in Western Australia and a new Rare Earths Element early stage exploration project in Greenland.

 

About the Sonora Lithium Project:

The Sonora Lithium Project, which consists of ten mining concession areas covering approximately 100 thousand hectares, is located in the northeast of Sonora State 105 miles from the USA border. Sonora Lithium Project, through drilling and exploration work to date, has established an NI 43-101 compliant Indicated Mineral Resource of 1.14 million tonnes LCE contained in 95 million tonnes of clay at a lithium grade of 2,200 parts per million and an Inferred Mineral Resource of 6.3 million tonnes LCE contained in 500 million tonnes of clay at a lithium grade of 2,300 parts per million. The operational base of the Sonora Lithium Project is in Hermosillo in northern Mexico where it has built and operates a lithium pilot processing plant.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLWGUBCRUPAPPG
Date   Source Headline
24th Sep 20137:00 amRNSUnaudited Interim Results
19th Sep 20137:30 amRNSBoard Changes and Appointment of CEO
18th Sep 20137:41 amRNSInvestment
17th Sep 201311:33 amRNSAppointment of Joint Broker and Financial PR
17th Sep 20137:00 amRNSInvestments
16th Sep 20137:21 amRNSInvestments
13th Sep 20137:00 amRNSMexico Lithium Project Update
10th Sep 20135:49 pmRNSExercise of Warrants
10th Sep 20137:00 amRNSREM Granted Greenland Exploration Licence
9th Sep 20137:00 amRNSREM Closes Part of Equity Swap for £2.16 million
5th Sep 20137:00 amRNSCOMPLETION OF PLACING AND JOINT VENTURE STAGE 2
4th Sep 20137:00 amRNSMexico Lithium Joint Venture Update
30th Aug 20133:40 pmRNSExercise of Option in Mexico Lithium Project
29th Aug 20132:42 pmRNSExercise of Warrants
29th Aug 20137:00 amRNSMexico Lithium Project Maiden Resource Estimate
28th Aug 20132:37 pmRNSStatement re: JV Partner Trading Halt in Canada
27th Aug 20137:00 amRNSIncrease in ownership of Mexico Lithium Project
23rd Aug 20137:00 amRNSPlacement of Equity
21st Aug 20137:00 amRNSFinal Drill Results Mexico Lithium Project
14th Aug 201310:51 amRNSUpdate on Mexico Lithium Project
13th Aug 20132:10 pmRNSStatement re: Mexico Lithium Project Update
16th Jul 20134:08 pmRNSResult of AGM
25th Jun 201312:53 pmRNSFinal Results
24th Jun 20137:00 amRNSInitial Drill Results On Sonora Lithium Project
17th Jun 20137:00 amRNSMexico Drilling Update and Placing
7th Jun 20137:00 amRNSDrilling Update
4th Jun 20137:00 amRNSDrilling Update - Mexican Lithium Joint Venture
23rd May 20137:00 amRNSFarm-In Finalised and Drilling Commences
11th Apr 20137:09 amRNSUpdate on Lithium Joint Venture, Mexico
25th Mar 20137:00 amRNSField Work Commences on the Bacanora
11th Mar 20132:59 pmRNSCompletion of Placing
6th Mar 20134:31 pmRNSEquity Placement
14th Feb 20137:00 amRNSREM signs Lithium farm-in deal in Northern Mexico
4th Feb 20137:00 amRNSREM applies for Greenland Rare Earth Licence
14th Dec 20125:33 pmRNSAmendment to Options
13th Dec 20123:21 pmRNSIssue of Options
6th Dec 20127:00 amRNSCompletion of Placing
30th Nov 20122:49 pmRNSTR1 - Notification of major interest in shares
28th Nov 201210:59 amRNSEquity Placement
20th Nov 20122:07 pmRNSTR1 - Notification of major interest in shares
19th Nov 20124:59 pmRNSTR1 - Notification of major interestin shares
2nd Nov 201212:08 pmRNSResult of AGM
9th Oct 201211:05 amRNSNotice of AGM
24th Sep 20124:23 pmRNSInterim Results
7th Sep 20123:03 pmRNSResignation of Director
25th Jul 20128:29 amRNSAward of Greenland Exploration Licences
16th Apr 20121:33 pmRNSDirectorate Change
2nd Apr 20127:00 amRNSReplacement : Final Results
30th Mar 20127:00 amRNSFinal Results
29th Mar 201212:55 pmRNSYangibana Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.