If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
5.00    -0.05 (-0.99%)
Bid:
4.80
Ask:
5.20
Spread: 0.40 (8.333%)
Market Cap: £20.46m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Drilling Results & Accelerated Drilling Programme

1 Sep 2015 07:03

RNS Number : 5850X
Rare Earth Minerals PLC
01 September 2015
 

01 September 2015

Rare Earth Minerals Plc.

("Rare Earth Minerals", "REM" or "the Company")

Sonora Drilling Results and Accelerated Drilling Programme

Rare Earth Minerals and (LSE AIM: REM) is pleased to announce the mobilisation of a second drilling rig to site and also provides an update on the drilling programme currently being undertaken as part of the pre-feasibility study ("PFS") at the Sonora Lithium Project in Mexico.

A total of nine holes (totaling 1,850 metres) have been completed of the currently planned 18 hole drilling programme (approximately 4,000 metres). As a result of the Company's recent agreement with Tesla Motors, a second rig has been mobilised to site to increase the speed of drilling, with the intention to complete the remaining holes in September 2015.

 

Analyses received from the first four holes from the Fleur concession indicate that weighted averages for lithium content in the Upper Clay is 1,862 ppm Li over 24.15 metres in thickness and the Lower Clay averages 4,871 ppm Li over 24.15 metres. The thickness in metres and grades of the significant lithium intersections are shown in Table 1 as follows:

 

Table 1: Significant Lithium drilling intersections - Sonora Lithium Project (Fleur Concession)

Hole

Unit

From (m)

To (m)

Length (m)

Li ppm

%LCE*1

ES-44

Upper Clay

74.27

105.28

31.01

2,127

1.13

Lower Clay

117.65

133.19

15.54

5,032

2.68

ES-45

Lower Clay

125.73

139.9

14.17

4,503

2.40

ES-46

Upper Clay

129.44

154.18

24.74

1,918

1.02

Lower Clay

162.64

178.62

15.98

4,605

2.45

ES-47

Upper Clay

94.84

111.55

16.71

1,287

0.69

Lower Clay

125.27

150.8

25.53

5,145

2.74

 

Note: N/D means not detected

 

* LCE = lithium carbonate (Li2CO3) Equivalent: determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3 value in percent. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

 

The programme is primarily focused on significantly increasing the Indicated Mineral Resources within the Sonora Lithium Project, as well as testing whether the high grades and near surface mineralisation identified at the La Ventana concession continue into the northern area of the Fleur concession, which immediately adjoins La Ventana to the south. The Company's resource was recently updated by SRK Consulting (UK) Limited ("SRK") to:

· Indicated resources of 1.14 million tonnes ("Mt") lithium carbonate equivalent ("LCE") contained in 95Mt of clay, at lithium ("Li") grade of 2,200 ppm

· Inferred resources of 6.3Mt LCE contained in 500 Mt of clay at a Li grade of 2,300 ppm

For further details, investors are encouraged to reference the Company's press releases dated May 13 and June 26, 2015 and/or the SRK's report that was filed on May 13, 2015 and is accessible on the Company's website.

 

Upon completion of the drill programme and assaying, SRK will deliver an updated resource model for mine design purposes, with an initial focus on the higher grade, open pit resources on the La Ventana and Fleur concessions.

 

The pre-feasibility study ("PFS") for the Sonora Lithium Project in Mexico is ongoing, with metallurgical testwork, mine design and process engineering proceeding according to schedule and due to be reported in Q1, 2016.

 

Details of REM's ownership of the Sonora Lithium Project:

REM owns a direct interest of 16.4% in Bacanora, and through that holds an indirect interest in the La Ventana asset of 16.4%. In addition to the 16.4% in Bacanora, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of Megalit S.A. de CV and Mexalit S.A. de CV of 41.47%.

The Company's Executive Chairman, David Lenigas, commented:

"The positive drilling results received to date coupled with the supply agreement with Tesla announced recently has fueled the drive to accelerate the drilling programme and the mobilisation of a second drill to the Sonora Lithium Project. We look forward to providing further updates from the ongoing drilling programme and other project development activites."

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Ends

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

Notes to Editors:

About Rare Earth Minerals Plc:

Rare Earth Minerals Plc is a London listed company (LSE AIM: REM) with significant interest in the Sonora Lithium Project in northern Mexico, and in the Yangibana Rare Earths Element Project in Western Australia and a new Rare Earths Element early stage exploration project in Greenland.

 

About the Sonora Lithium Project:

The Sonora Lithium Project, which consists of ten mining concession areas covering approximately 100 thousand hectares, is located in the northeast of Sonora State 105 miles from the USA border. Sonora Lithium Project, through drilling and exploration work to date, has established an NI 43-101 compliant Indicated Mineral Resource of 1.14 million tonnes LCE contained in 95 million tonnes of clay at a lithium grade of 2,200 parts per million and an Inferred Mineral Resource of 6.3 million tonnes LCE contained in 500 million tonnes of clay at a lithium grade of 2,300 parts per million. The operational base of the Sonora Lithium Project is in Hermosillo in northern Mexico where it has built and operates a lithium pilot processing plant.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLWGUBCRUPAPPG
Date   Source Headline
31st May 20177:00 amRNSResults for the year ended 31 December 2016
25th May 20179:23 amRNSUpdate on Cinovec Lithium/Tin Project
23rd May 20172:29 pmRNSMacarthur Minerals Update
22nd May 20179:22 amRNSYangibana Update
16th May 20179:14 amRNSYangibana Update
15th May 20179:19 amRNSBacanora Minerals update
15th May 20178:40 amRNSAuroch Minerals Update
9th May 20173:00 pmRNSMacarthur Minerals Update
8th May 20172:23 pmRNSHolding(s) in Company
3rd May 20179:20 amRNSMacarthur Minerals Update
2nd May 20179:27 amRNSBacanora Minerals Update
2nd May 20178:17 amRNSUpdate on Cinovec Lithium/Tin Project
2nd May 20178:09 amRNSAuroch Minerals Update
19th Apr 20178:18 amRNSPFS estimates a $540m NPV at the Cinovec Project
11th Apr 20171:34 pmRNSMacarthur Minerals update
10th Apr 20179:31 amRNSBacanora Minerals Update
3rd Apr 201710:18 amRNSYangibana Update
27th Mar 20177:05 amRNSAuroch Minerals update
27th Mar 20177:00 amRNSChange of Name
22nd Mar 20179:46 amRNSAuroch Minerals Update
20th Mar 201712:33 pmRNSMacarthur Minerals update
20th Mar 20179:31 amRNSYangibana Update and Change of Name
17th Mar 20171:34 pmRNSDepository Receipts Virtual Investor Conference
16th Mar 20171:05 pmRNSAuroch Minerals Update
23rd Feb 20173:23 pmRNSMacarthur Minerals Update
21st Feb 20178:59 amRNSBacanora Acquires 50% Interest in Lithium Asset
20th Feb 20177:00 amRNSIncrease in Indicated Resource at Cinovec
14th Feb 20174:49 pmRNSMacarthur Minerals Update
10th Feb 20177:42 amRNSFinal Drilling Results from Cinovec Project
3rd Feb 20178:40 amRNSUpdate on Cinovec Lithium/Tin Project
31st Jan 20177:00 amRNSConversion of Loan Note
26th Jan 20177:00 amRNSBacanora Minerals Board Changes
17th Jan 20171:09 pmRNSYangibana Resource Update
16th Jan 20179:08 amRNSUpdate on Cinovec Lithium/Tin Project
11th Jan 20178:49 amRNSStrategic Investment In Macarthur Minerals
20th Dec 20167:00 amRNSBacanora Minerals Update
16th Dec 20165:03 pmRNSMacarthur Minerals Update
13th Dec 20167:30 amRNSBattery Grade Lithium Produced at Cinovec Project
2nd Dec 20167:00 amRNSStrategic Stake Purchased in Auroch Minerals
24th Nov 20169:44 amRNSUpdate on Further Investment in Cinovec Project
24th Nov 20167:00 amRNSBacanora Board Changes and Corporate Update
23rd Nov 20167:57 amRNSIndicated Lithium Resource at Cinovec Increased
23rd Nov 20167:00 amRNSIndicated Lithium Resource at Cinovec Increased
16th Nov 20168:56 amRNSDrill Programme Update at Cinovec Project
11th Nov 20168:51 amRNSSonora Lithium Project Update
8th Nov 201610:32 amRNSUpdate on Cinovec Lithium-Tin Project
7th Nov 201611:57 amRNSMacarthur Minerals update
3rd Nov 201610:35 amRNSConversion of Loan Note
1st Nov 20167:09 amRNSNew Exploration Licence Awarded at Cinovec Project
31st Oct 20167:00 amRNSUpdate on Macarthur Minerals

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.