Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.30    -0.35 (-4.58%)
Bid:
7.10
Ask:
7.50
Spread: 0.40 (5.634%)
Market Cap: £29.88m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Drilling Results & Accelerated Drilling Programme

1 Sep 2015 07:03

RNS Number : 5850X
Rare Earth Minerals PLC
01 September 2015
 

01 September 2015

Rare Earth Minerals Plc.

("Rare Earth Minerals", "REM" or "the Company")

Sonora Drilling Results and Accelerated Drilling Programme

Rare Earth Minerals and (LSE AIM: REM) is pleased to announce the mobilisation of a second drilling rig to site and also provides an update on the drilling programme currently being undertaken as part of the pre-feasibility study ("PFS") at the Sonora Lithium Project in Mexico.

A total of nine holes (totaling 1,850 metres) have been completed of the currently planned 18 hole drilling programme (approximately 4,000 metres). As a result of the Company's recent agreement with Tesla Motors, a second rig has been mobilised to site to increase the speed of drilling, with the intention to complete the remaining holes in September 2015.

 

Analyses received from the first four holes from the Fleur concession indicate that weighted averages for lithium content in the Upper Clay is 1,862 ppm Li over 24.15 metres in thickness and the Lower Clay averages 4,871 ppm Li over 24.15 metres. The thickness in metres and grades of the significant lithium intersections are shown in Table 1 as follows:

 

Table 1: Significant Lithium drilling intersections - Sonora Lithium Project (Fleur Concession)

Hole

Unit

From (m)

To (m)

Length (m)

Li ppm

%LCE*1

ES-44

Upper Clay

74.27

105.28

31.01

2,127

1.13

Lower Clay

117.65

133.19

15.54

5,032

2.68

ES-45

Lower Clay

125.73

139.9

14.17

4,503

2.40

ES-46

Upper Clay

129.44

154.18

24.74

1,918

1.02

Lower Clay

162.64

178.62

15.98

4,605

2.45

ES-47

Upper Clay

94.84

111.55

16.71

1,287

0.69

Lower Clay

125.27

150.8

25.53

5,145

2.74

 

Note: N/D means not detected

 

* LCE = lithium carbonate (Li2CO3) Equivalent: determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3 value in percent. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

 

The programme is primarily focused on significantly increasing the Indicated Mineral Resources within the Sonora Lithium Project, as well as testing whether the high grades and near surface mineralisation identified at the La Ventana concession continue into the northern area of the Fleur concession, which immediately adjoins La Ventana to the south. The Company's resource was recently updated by SRK Consulting (UK) Limited ("SRK") to:

· Indicated resources of 1.14 million tonnes ("Mt") lithium carbonate equivalent ("LCE") contained in 95Mt of clay, at lithium ("Li") grade of 2,200 ppm

· Inferred resources of 6.3Mt LCE contained in 500 Mt of clay at a Li grade of 2,300 ppm

For further details, investors are encouraged to reference the Company's press releases dated May 13 and June 26, 2015 and/or the SRK's report that was filed on May 13, 2015 and is accessible on the Company's website.

 

Upon completion of the drill programme and assaying, SRK will deliver an updated resource model for mine design purposes, with an initial focus on the higher grade, open pit resources on the La Ventana and Fleur concessions.

 

The pre-feasibility study ("PFS") for the Sonora Lithium Project in Mexico is ongoing, with metallurgical testwork, mine design and process engineering proceeding according to schedule and due to be reported in Q1, 2016.

 

Details of REM's ownership of the Sonora Lithium Project:

REM owns a direct interest of 16.4% in Bacanora, and through that holds an indirect interest in the La Ventana asset of 16.4%. In addition to the 16.4% in Bacanora, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of Megalit S.A. de CV and Mexalit S.A. de CV of 41.47%.

The Company's Executive Chairman, David Lenigas, commented:

"The positive drilling results received to date coupled with the supply agreement with Tesla announced recently has fueled the drive to accelerate the drilling programme and the mobilisation of a second drill to the Sonora Lithium Project. We look forward to providing further updates from the ongoing drilling programme and other project development activites."

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Ends

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

Notes to Editors:

About Rare Earth Minerals Plc:

Rare Earth Minerals Plc is a London listed company (LSE AIM: REM) with significant interest in the Sonora Lithium Project in northern Mexico, and in the Yangibana Rare Earths Element Project in Western Australia and a new Rare Earths Element early stage exploration project in Greenland.

 

About the Sonora Lithium Project:

The Sonora Lithium Project, which consists of ten mining concession areas covering approximately 100 thousand hectares, is located in the northeast of Sonora State 105 miles from the USA border. Sonora Lithium Project, through drilling and exploration work to date, has established an NI 43-101 compliant Indicated Mineral Resource of 1.14 million tonnes LCE contained in 95 million tonnes of clay at a lithium grade of 2,200 parts per million and an Inferred Mineral Resource of 6.3 million tonnes LCE contained in 500 million tonnes of clay at a lithium grade of 2,300 parts per million. The operational base of the Sonora Lithium Project is in Hermosillo in northern Mexico where it has built and operates a lithium pilot processing plant.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLWGUBCRUPAPPG
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.