If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
5.25    0.15 (2.94%)
Bid:
5.00
Ask:
5.50
Spread: 0.50 (10.00%)
Market Cap: £21.49m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Drilling Results & Accelerated Drilling Programme

1 Sep 2015 07:03

RNS Number : 5850X
Rare Earth Minerals PLC
01 September 2015
Β 

01 September 2015

Rare Earth Minerals Plc.

("Rare Earth Minerals", "REM" or "the Company")

Sonora Drilling Results and Accelerated Drilling Programme

Rare Earth Minerals and (LSE AIM: REM) is pleased to announce the mobilisation of a second drilling rig to site and also provides an update on the drilling programme currently being undertaken as part of the pre-feasibility study ("PFS") at the Sonora Lithium Project in Mexico.

A total of nine holes (totaling 1,850 metres) have been completed of the currently planned 18 hole drilling programme (approximately 4,000 metres). As a result of the Company's recent agreement with Tesla Motors, a second rig has been mobilised to site to increase the speed of drilling, with the intention to complete the remaining holes in September 2015.

Β 

Analyses received from the first four holes from the Fleur concession indicate that weighted averages for lithium content in the Upper Clay is 1,862 ppm Li over 24.15 metres in thickness and the Lower Clay averages 4,871 ppm Li over 24.15 metres. The thickness in metres and grades of the significant lithium intersections are shown in Table 1 as follows:

Β 

Table 1: Significant Lithium drilling intersections - Sonora Lithium Project (Fleur Concession)

Hole

Unit

From (m)

To (m)

Length (m)

Li ppm

%LCE*1

ES-44

Upper Clay

74.27

105.28

31.01

2,127

1.13

Lower Clay

117.65

133.19

15.54

5,032

2.68

ES-45

Lower Clay

125.73

139.9

14.17

4,503

2.40

ES-46

Upper Clay

129.44

154.18

24.74

1,918

1.02

Lower Clay

162.64

178.62

15.98

4,605

2.45

ES-47

Upper Clay

94.84

111.55

16.71

1,287

0.69

Lower Clay

125.27

150.8

25.53

5,145

2.74

Β 

Note: N/D means not detected

Β 

* LCE = lithium carbonate (Li2CO3) Equivalent: determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3 value in percent. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

Β 

The programme is primarily focused on significantly increasing the Indicated Mineral Resources within the Sonora Lithium Project, as well as testing whether the high grades and near surface mineralisation identified at the La Ventana concession continue into the northern area of the Fleur concession, which immediately adjoins La Ventana to the south. The Company's resource was recently updated by SRK Consulting (UK) Limited ("SRK") to:

Β· Indicated resources of 1.14 million tonnes ("Mt") lithium carbonate equivalent ("LCE") contained in 95Mt of clay, at lithium ("Li") grade of 2,200 ppm

Β· Inferred resources of 6.3Mt LCE contained in 500 Mt of clay at a Li grade of 2,300 ppm

For further details, investors are encouraged to reference the Company's press releases dated May 13 and June 26, 2015 and/or the SRK's report that was filed on May 13, 2015 and is accessible on the Company's website.

Β 

Upon completion of the drill programme and assaying, SRK will deliver an updated resource model for mine design purposes, with an initial focus on the higher grade, open pit resources on the La Ventana and Fleur concessions.

Β 

The pre-feasibility study ("PFS") for the Sonora Lithium Project in Mexico is ongoing, with metallurgical testwork, mine design and process engineering proceeding according to schedule and due to be reported in Q1, 2016.

Β 

Details of REM's ownership of the Sonora Lithium Project:

REM owns a direct interest of 16.4% in Bacanora, and through that holds an indirect interest in the La Ventana asset of 16.4%.Β In addition to the 16.4% in Bacanora, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of Megalit S.A. de CV and Mexalit S.A. de CV of 41.47%.

The Company's Executive Chairman, David Lenigas, commented:

"The positive drilling results received to date coupled with the supply agreement with Tesla announced recently has fueled the drive to accelerate the drilling programme and the mobilisation of a second drill to the Sonora Lithium Project. We look forward to providing further updates from the ongoing drilling programme and other project development activites."

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Ends

For further information please contact:Β 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

Β 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

Notes to Editors:

About Rare Earth Minerals Plc:

Rare Earth Minerals Plc is a London listed company (LSE AIM: REM) with significant interest in the Sonora Lithium Project in northern Mexico, and in the Yangibana Rare Earths Element Project in Western Australia and a new Rare Earths Element early stage exploration project in Greenland.

Β 

About the Sonora Lithium Project:

The Sonora Lithium Project, which consists of ten mining concession areas covering approximately 100 thousand hectares, is located in the northeast of Sonora State 105 miles from the USA border. Sonora Lithium Project, through drilling and exploration work to date, has established an NI 43-101 compliant Indicated Mineral Resource of 1.14 million tonnes LCE contained in 95 million tonnes of clay at a lithium grade of 2,200 parts per million and an Inferred Mineral Resource of 6.3 million tonnes LCE contained in 500 million tonnes of clay at a lithium grade of 2,300 parts per million. The operational base of the Sonora Lithium Project is in Hermosillo in northern Mexico where it has built and operates a lithium pilot processing plant.

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLWGUBCRUPAPPG
Date   Source Headline
10th Feb 202111:24 amRNSBacanora starts Sonora Lithium project site works
10th Feb 202111:05 amRNSSecond Price Monitoring Extn
10th Feb 202111:00 amRNSPrice Monitoring Extension
10th Feb 20219:05 amRNSSecond Price Monitoring Extn
10th Feb 20219:00 amRNSPrice Monitoring Extension
10th Feb 20217:00 amRNSUpdate on the Amapa Iron Ore Project
9th Feb 20217:00 amRNSMacarthur signs MOU with Southern Ports Authority
2nd Feb 20211:04 pmRNSEMH Cinovec Project - Drilling Update
27th Jan 20212:34 pmRNSForm TR1
12th Jan 20211:03 pmRNSExercise of Warrants
8th Jan 20217:00 amRNSResult of AGM
30th Dec 20207:00 amRNSForm TR1
23rd Dec 20202:37 pmRNSExercise of Warrants
14th Dec 20207:00 amRNSNotice of Annual General Meeting
4th Dec 202010:49 amRNSDirector Share Purchases
20th Nov 202012:43 pmRNSDirector Share Purchases
16th Nov 20203:58 pmRNSYangibana Drilling Extends Simons Find
13th Nov 20202:10 pmRNSExercise of Warrants and Conversion of Loan Note
12th Nov 20209:53 amRNSDirector Share Purchases
10th Nov 20206:21 pmRNSAdmission of Shares
10th Nov 20209:31 amRNSDirector Share Purchases
9th Nov 202010:54 amRNSDirector Share Purchases
4th Nov 202010:18 amRNSDirector Share Purchases and Exercise of Options
2nd Nov 20207:06 amRNSEmployee Benefit Trust and Share Incentive Plan
2nd Nov 20207:04 amRNSUpdated Mineral Resource Estimate - Amapa Iron Ore
2nd Nov 20207:00 amRNSAmapa Iron Ore Project - Update
13th Oct 202011:18 amRNSOutstanding Yangibana Drill Results
2nd Oct 20203:48 pmRNSMacarthur Lake Giles Magnetite Mineral Resource
23rd Sep 202010:02 amRNSEuropean Metals Appoints Lead Engineer at Cinovec
21st Sep 20204:41 pmRNSSecond Price Monitoring Extn
21st Sep 20204:36 pmRNSPrice Monitoring Extension
17th Sep 202010:22 amRNSExcellent Drill Results at Yangibana
10th Sep 20209:04 amRNSBacanora Sonora and Lithium Market Update
2nd Sep 20202:42 pmRNSMacarthur Minerals Develops Port Rail Solution
2nd Sep 202012:09 pmRNSAgreement in Principle to Bank Creditor Settlement
28th Aug 20209:38 amRNSInterim Results
26th Aug 202010:34 amRNSHastings Technology Metals Placement Raises $14.6m
26th Aug 20207:00 amRNSUpdate on Investment in the Amapa Iron Ore Project
21st Aug 20201:40 pmRNSMacarthur JV Partner Acquires Iron Ore Project
21st Aug 20207:00 amRNSPlacing to Raise £1.25 million
17th Aug 20204:41 pmRNSSecond Price Monitoring Extn
17th Aug 20204:35 pmRNSPrice Monitoring Extension
14th Aug 20201:04 pmRNSExercise of Warrants
12th Aug 20208:34 amRNSMacarthur Moonshine Magnetite Resource Upgrade
11th Aug 20207:00 amRNSAmapa Update
10th Aug 20209:49 amRNSEMH Commences Cinovec Drilling Programme
29th Jul 20209:40 amRNSYangibana Project Costs Reduced By A$68m Or 13%
29th Jul 20209:35 amRNSA$68m Capex Reduction at Yangibana Project
29th Jul 20207:00 amRNSMacarthur Minerals engages RCR Rail Technology
28th Jul 20202:05 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.