We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.60
Bid: 3.50
Ask: 3.70
Change: 0.05 (1.41%)
Spread: 0.20 (5.714%)
Open: 3.55
High: 3.60
Low: 3.55
Prev. Close: 3.55
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Outstanding Yangibana Drill Results

13 Oct 2020 11:18

RNS Number : 9366B
Cadence Minerals PLC
13 October 2020
 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence" or "the Company")

 

Hastings Technology Metals (ASX: HAS) - Outstanding Rare Earth Oxide Grades from Frasers North and South Drilling.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Hastings Technology Metals (ASX:HAS) ("Hastings"), Cadence's joint venture partner at the Yangibana Rare Earth Project in the Gascoyne region of Western Australia ("Yangibana" "Yangibana Project"), has announced further drill results as part of the 2020 Exploration Drilling Program, for the Fraser's North and South areas.

The Company has so far received assay results for 30 RC drill holes in these areas since drilling commenced in early June. Numerous significant potentially economic results have been received from 29 out of the 30 holes which include some of the highest grade results yet returned from any drilling at the Yangibana project since 2014.

Highlights:

· Outstanding rare earth oxide grades received from 29 out of 30 drill holes from Fraser's North and South sampling.

· High‐grade and shallow intersections from Fraser's North and South drilling include:

o 3m @ 7.28% TREO from 8m,

§ Including 1m @ 18.57% TREO from 8m,

o 8m @ 3.51% TREO from 31m,

o 2m @ 1.67% TREO from 31m,

o 6m @ 1.42% TREO from 8m, and

o 4m @ 1.36% TREO from 17m.

· Highest grade intersections occur south of the current Fraser's Open Pit (mineral resource of 1.32 million tonnes grading 1.35% TREO including 0.56% Nd2O3+Pr6O111) and extend mineralisation up to 450m in a south easterly direction.

· Drilling results from the North now confirm contiguous new mineralisation up to 250m from the Fraser's Pit limit.

· In the South, all mineralisation remains open down dip and along strike, with surface ironstone outcrops being tracked for up to 1‐ kilometre past last drill locations.

· New results record highest grades to date from Yangibana project, with 1m samples returning grades of up to 18.57% TREO.

· Results from the South come from largely untested areas, highlighting the potential for them to merge into a single large 1.4km long Fraser's Open Pit.

· Results will be included in an updated Fraser's Mineral Resource estimate scheduled for year‐end completion

2020 Exploration Program

Hasting's commenced the 2020 drilling program with a Reverse‐Circulation (RC) drilling rig mobilised to site in mid‐June. The program will continue until 4Q 2020 and has been designed to achieve three goals:

· Validate the existing Bald Hill Mineral Resource Estimates with close spaced grade control drilling;

· Increase the Yangibana Project's Measured and Indicated Mineral Resource; and

· Obtain core samples for additional metallurgical test work and ore characterization studies.

The Company's geological interpretation suggests that there is substantial opportunity to add additional Mineral Resource tonnages in the area Bald Hill ‐ Simon's Find - Fraser's trend. This trend presents the highest opportunity to add Mineral Resources within close proximity to the Processing Plant.

Existing results support and warrant additional drilling, where near‐surface extensions to known mineralisation can be traced and identified. Observations from field mapping continue to provide new insights into the local geology and its structural settings, which conceptually offer the greatest opportunity to host additional resources.

The full HAS release can be found at: https://www.investi.com.au/api/announcements/has/1d62d67f-04b.pdf

Hastings COO Andrew Reid said: "These fantastic results have again exceeded our expectations for the Company's 20,000m 2020 exploration drill program, with almost every drill hole announced today intersecting rare earth grades which Hastings believe could be economic and mineable.

The exceptionally high grades from Fraser's South (up to 18.57%) gives us a lot of confidence that we are in a rare earth zone richly endowed with huge potential, particularly given how little exploration it has seen.

Hastings is now well on its way to achieving its goal of extending mine life through testing our existing geological understanding of the Fraser's deposit. We are now intersecting consistent mineralisation over a wide area and there remains plenty of opportunity to significantly expand the Mineral Resource in the future with open mineralisation along strike and down‐dip requiring further drilling in the future.

The entire Fraser's North to South mineralised trend is emerging as a large consistent zone which is characterised by thick near surface intercepts with grades that would potentially support a large open pit operation".

The drilling at Fraser's South has intercepted the predicted ironstone positions and returned consistent mineralisation results, with some of the best TREO results ever received from Yangibana. Hastings remains confident that this mineralised trend will continue in a south‐easterly direction based on surface mapping and points to the potential of further development of the Mineral Resource within the Fraser's South corridor.

Additional future work will include step out exploration drilling along strike and drilling down dip, where the mineralisation to date has only been tested to 40m below the surface."

Cadence CEO Kiran Morzaria commented: "We are pleased to note today's exceptional set of drilling results from Fraser North and South. These results provide a positive read-over into the value and future potential of our joint venture with Hastings. We look forward to further developments."

Cadence Minerals Yangibana Holding:

Cadence owns 30% of 3 Mining Leases, 6 Exploration Licences which form part of the Yangibana Rare Earth Deposit. Hastings Technology Metals owns the remaining 70% ("Hastings"). Further details of our ownership the mineral resources and reserves on our jointly held leases can be found at:

https://www.cadenceminerals.com/projects/yangibana-rare-earth-project-2/

The current mine plan anticipates production to start from our joint venture areas (Yangibana and Yangibana North) in year 6 and continue to the end of mine life (year 13). Further details can be found in the Hastings 2019 Annual Report

 

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Sinclair-Ford

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLBGBDGSBBDGGX
Date   Source Headline
18th Apr 20247:00 amRNSFurther Progress at the Amapa Iron Ore Project
11th Apr 202410:01 amRNSEuropean Metals Holdings - Cinovec Lithium Project
9th Apr 20248:59 amRNSCorporate Update - Evergreen Lithium
5th Apr 20241:23 pmRNSPlacing to raise £500,000 & Issue of Warrants
28th Mar 20249:59 amRNSUpdate on Amapá Project investment & Equity Stake
27th Mar 202410:25 amRNSEuropean Metals Holdings - Cinovec Project Update
22nd Mar 20247:00 amRNSOptimisation Study Delivers Savings at Amapá
14th Mar 20249:18 amRNSCorporate Update - Evergreen Lithium
7th Mar 20247:00 amRNSProgress at the Amapá Project & Corporate Update
29th Jan 202410:05 amRNSCorporate Update
29th Jan 20249:53 amRNSEMH - Cinovec Exploration Licenses
22nd Jan 20248:56 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
22nd Dec 20238:15 amRNSCorporate Update – European Metals Holdings
30th Nov 20239:06 amRNSCorporate Update - Evergreen Lithium
22nd Nov 202311:39 amRNSCorporate Update - Hastings Technology Metals
16th Nov 20237:00 amRNSSonora Lithium Investment Update
9th Nov 20239:12 amRNSCorporate Update - European Metals Holdings
31st Oct 20237:00 amRNSDirector Share Purchases
30th Oct 20237:00 amRNSStrategic Development and Financing
29th Sep 20239:53 amRNSInterim Results
18th Sep 20238:43 amRNSCorporate Update - Evergreen Lithium
12th Sep 20239:10 amRNSCorporate Update - Hastings Technology Metals
11th Sep 20239:44 amRNSAmapá Iron Ore Project Update
31st Aug 20237:52 amRNSSonora Lithium Investment Update
16th Aug 202311:52 amRNSResult of AGM
4th Aug 20238:55 amRNSCorporate Update - Hastings Technology Metals
25th Jul 202312:25 pmRNSNotice of AGM
21st Jul 202310:12 amRNSCorporate Update – European Metals Holdings
28th Jun 20239:11 amRNSCorporate Update - Evergreen Lithium ANT Analysis
27th Jun 20237:00 amRNSAnnual Results for the year ended 31 December 2022
13th Jun 20239:49 amRNSCorporate Update - Hastings Technology Metals
9th Jun 202311:46 amRNSUpdate EMH Land secured for Cinovec lithium plant
1st Jun 20239:01 amRNSCorporate Update - Evergreen Lithium
31st May 202312:52 pmRNSCorporate Update - Hastings Technology Metals
26th May 20232:48 pmRNSAmapa Project Update & Loan Financing
25th May 20231:43 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
25th May 20238:42 amRNSEMH Announcement: Outstanding Lithium Recoveries
10th May 202312:12 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
3rd May 20235:17 pmRNSCorporate Update - Hastings Technology Metals
13th Apr 20238:56 amRNSNotice of Substantial Shareholder in Evergreen
1st Mar 20237:00 amRNSCorporate Update
30th Jan 202311:47 amRNSEuropean Metals Announcement: Just Transition Fund
26th Jan 20238:26 amRNSListing of Evergreen Lithium on the ASX
25th Jan 20238:35 amRNSCompletion of Sale of Yangibana JV Interest
10th Jan 20232:05 pmRNSSecond Price Monitoring Extn
10th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSDirector Share Purchases
3rd Jan 20237:00 amRNSCompletion of PFS on Amapá Iron Ore Project
30th Dec 20227:00 amRNSCorporate Update
31st Oct 20229:00 amRNSInvestment Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.