Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.40    -0.25 (-3.27%)
Bid:
7.10
Ask:
7.70
Spread: 0.60 (8.451%)
Market Cap: £30.28m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

EMH Commences Cinovec Drilling Programme

10 Aug 2020 09:49

RNS Number : 6414V
Cadence Minerals PLC
10 August 2020
 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence")

 

European Metals (AIM: EMH) Commences Measured Drilling Programme.

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note the update today from European Metals Holdings Limited ("European Metals" "EMH" or "the Company") that a Measured Resource drilling has commenced at the Cinovec Lithium-Tin Project ("the project" or "Cinovec").

Highlights:

· A total of nineteen resource drill holes will be completed during this campaign for a total of 5,550 m, with the first hole well advanced.

· A further two hydro-geological drill holes and four geotechnical drill holes are planned once resource drilling has been completed.

· The programme will provide approximately 10t of drill core for further metallurgical testing and to generate samples..

EMH confirms that drilling has commenced and that the first hole, CIS-18, is on schedule for completion at 275 metres. The programme commenced following the Company receiving permission from the statutory authorities in the Czech Republic for this year's planned diamond drilling campaign.

Drilling is aimed at converting a sufficient portion of the existing Indicated Mineral Resource to the Measured Resource category and subsequently to a Mineral Reserve, to cover the first two years of the scheduled mining plan and obtaining a sufficient amount of ore samples for the next phase of metallurgical testing. The majority of the material will be utilised in the pilot scale testing for the Front End Engineering Design ("FEED") Study.

A total of nineteen diamond drill holes will be completed for 5,550 metres. A further four geotechnical holes along the planned underground decline route will be drilled and logged subsequent to the completion of the resource drilling. This data will allow final development ready designs to be completed for the declines.

Cadence Minerals Holding in EMH

Cadence holds approximately 15% percent of the equity in European Metals, which, through its wholly owned Subsidiary, Geomet s.r.o. ("Geomet"), controls the mineral exploration licenses awarded by the Czech State over Cinovec.

The full release can be found at: https://www.londonstockexchange.com/news-article/EMH/measured-resource-drilling-commenced/14646754

EMH Executive Chairman Keith Coughlan commented: "It is very pleasing to be able to get back to drilling on the Project. There are no Covid 19 related movement restrictions or limitations and the drilling is progressing well. The aim of the campaign is to convert the initial years mining into Proven Reserves category. Following consultations with potential lenders, we expect that this will assist greatly in the securing of more attractive debt finance for the Project once we enter that stage of operations."

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Sinclair-Ford

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLPMMPTMTIBMIM
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.