Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
5.50    0.00 (0.00%)
Bid:
5.00
Ask:
6.00
Spread: 1.00 (20.00%)
Market Cap: £22.51m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

EMH Commences Cinovec Drilling Programme

10 Aug 2020 09:49

RNS Number : 6414V
Cadence Minerals PLC
10 August 2020
 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence")

 

European Metals (AIM: EMH) Commences Measured Drilling Programme.

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note the update today from European Metals Holdings Limited ("European Metals" "EMH" or "the Company") that a Measured Resource drilling has commenced at the Cinovec Lithium-Tin Project ("the project" or "Cinovec").

Highlights:

· A total of nineteen resource drill holes will be completed during this campaign for a total of 5,550 m, with the first hole well advanced.

· A further two hydro-geological drill holes and four geotechnical drill holes are planned once resource drilling has been completed.

· The programme will provide approximately 10t of drill core for further metallurgical testing and to generate samples..

EMH confirms that drilling has commenced and that the first hole, CIS-18, is on schedule for completion at 275 metres. The programme commenced following the Company receiving permission from the statutory authorities in the Czech Republic for this year's planned diamond drilling campaign.

Drilling is aimed at converting a sufficient portion of the existing Indicated Mineral Resource to the Measured Resource category and subsequently to a Mineral Reserve, to cover the first two years of the scheduled mining plan and obtaining a sufficient amount of ore samples for the next phase of metallurgical testing. The majority of the material will be utilised in the pilot scale testing for the Front End Engineering Design ("FEED") Study.

A total of nineteen diamond drill holes will be completed for 5,550 metres. A further four geotechnical holes along the planned underground decline route will be drilled and logged subsequent to the completion of the resource drilling. This data will allow final development ready designs to be completed for the declines.

Cadence Minerals Holding in EMH

Cadence holds approximately 15% percent of the equity in European Metals, which, through its wholly owned Subsidiary, Geomet s.r.o. ("Geomet"), controls the mineral exploration licenses awarded by the Czech State over Cinovec.

The full release can be found at: https://www.londonstockexchange.com/news-article/EMH/measured-resource-drilling-commenced/14646754

EMH Executive Chairman Keith Coughlan commented: "It is very pleasing to be able to get back to drilling on the Project. There are no Covid 19 related movement restrictions or limitations and the drilling is progressing well. The aim of the campaign is to convert the initial years mining into Proven Reserves category. Following consultations with potential lenders, we expect that this will assist greatly in the securing of more attractive debt finance for the Project once we enter that stage of operations."

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Sinclair-Ford

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLPMMPTMTIBMIM
Date   Source Headline
10th Feb 202111:24 amRNSBacanora starts Sonora Lithium project site works
10th Feb 202111:05 amRNSSecond Price Monitoring Extn
10th Feb 202111:00 amRNSPrice Monitoring Extension
10th Feb 20219:05 amRNSSecond Price Monitoring Extn
10th Feb 20219:00 amRNSPrice Monitoring Extension
10th Feb 20217:00 amRNSUpdate on the Amapa Iron Ore Project
9th Feb 20217:00 amRNSMacarthur signs MOU with Southern Ports Authority
2nd Feb 20211:04 pmRNSEMH Cinovec Project - Drilling Update
27th Jan 20212:34 pmRNSForm TR1
12th Jan 20211:03 pmRNSExercise of Warrants
8th Jan 20217:00 amRNSResult of AGM
30th Dec 20207:00 amRNSForm TR1
23rd Dec 20202:37 pmRNSExercise of Warrants
14th Dec 20207:00 amRNSNotice of Annual General Meeting
4th Dec 202010:49 amRNSDirector Share Purchases
20th Nov 202012:43 pmRNSDirector Share Purchases
16th Nov 20203:58 pmRNSYangibana Drilling Extends Simons Find
13th Nov 20202:10 pmRNSExercise of Warrants and Conversion of Loan Note
12th Nov 20209:53 amRNSDirector Share Purchases
10th Nov 20206:21 pmRNSAdmission of Shares
10th Nov 20209:31 amRNSDirector Share Purchases
9th Nov 202010:54 amRNSDirector Share Purchases
4th Nov 202010:18 amRNSDirector Share Purchases and Exercise of Options
2nd Nov 20207:06 amRNSEmployee Benefit Trust and Share Incentive Plan
2nd Nov 20207:04 amRNSUpdated Mineral Resource Estimate - Amapa Iron Ore
2nd Nov 20207:00 amRNSAmapa Iron Ore Project - Update
13th Oct 202011:18 amRNSOutstanding Yangibana Drill Results
2nd Oct 20203:48 pmRNSMacarthur Lake Giles Magnetite Mineral Resource
23rd Sep 202010:02 amRNSEuropean Metals Appoints Lead Engineer at Cinovec
21st Sep 20204:41 pmRNSSecond Price Monitoring Extn
21st Sep 20204:36 pmRNSPrice Monitoring Extension
17th Sep 202010:22 amRNSExcellent Drill Results at Yangibana
10th Sep 20209:04 amRNSBacanora Sonora and Lithium Market Update
2nd Sep 20202:42 pmRNSMacarthur Minerals Develops Port Rail Solution
2nd Sep 202012:09 pmRNSAgreement in Principle to Bank Creditor Settlement
28th Aug 20209:38 amRNSInterim Results
26th Aug 202010:34 amRNSHastings Technology Metals Placement Raises $14.6m
26th Aug 20207:00 amRNSUpdate on Investment in the Amapa Iron Ore Project
21st Aug 20201:40 pmRNSMacarthur JV Partner Acquires Iron Ore Project
21st Aug 20207:00 amRNSPlacing to Raise £1.25 million
17th Aug 20204:41 pmRNSSecond Price Monitoring Extn
17th Aug 20204:35 pmRNSPrice Monitoring Extension
14th Aug 20201:04 pmRNSExercise of Warrants
12th Aug 20208:34 amRNSMacarthur Moonshine Magnetite Resource Upgrade
11th Aug 20207:00 amRNSAmapa Update
10th Aug 20209:49 amRNSEMH Commences Cinovec Drilling Programme
29th Jul 20209:40 amRNSYangibana Project Costs Reduced By A$68m Or 13%
29th Jul 20209:35 amRNSA$68m Capex Reduction at Yangibana Project
29th Jul 20207:00 amRNSMacarthur Minerals engages RCR Rail Technology
28th Jul 20202:05 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.