If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
5.00    -0.05 (-0.99%)
Bid:
4.80
Ask:
5.20
Spread: 0.40 (8.333%)
Market Cap: £20.46m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Drilling Results & Accelerated Drilling Programme

1 Sep 2015 07:03

RNS Number : 5850X
Rare Earth Minerals PLC
01 September 2015
 

01 September 2015

Rare Earth Minerals Plc.

("Rare Earth Minerals", "REM" or "the Company")

Sonora Drilling Results and Accelerated Drilling Programme

Rare Earth Minerals and (LSE AIM: REM) is pleased to announce the mobilisation of a second drilling rig to site and also provides an update on the drilling programme currently being undertaken as part of the pre-feasibility study ("PFS") at the Sonora Lithium Project in Mexico.

A total of nine holes (totaling 1,850 metres) have been completed of the currently planned 18 hole drilling programme (approximately 4,000 metres). As a result of the Company's recent agreement with Tesla Motors, a second rig has been mobilised to site to increase the speed of drilling, with the intention to complete the remaining holes in September 2015.

 

Analyses received from the first four holes from the Fleur concession indicate that weighted averages for lithium content in the Upper Clay is 1,862 ppm Li over 24.15 metres in thickness and the Lower Clay averages 4,871 ppm Li over 24.15 metres. The thickness in metres and grades of the significant lithium intersections are shown in Table 1 as follows:

 

Table 1: Significant Lithium drilling intersections - Sonora Lithium Project (Fleur Concession)

Hole

Unit

From (m)

To (m)

Length (m)

Li ppm

%LCE*1

ES-44

Upper Clay

74.27

105.28

31.01

2,127

1.13

Lower Clay

117.65

133.19

15.54

5,032

2.68

ES-45

Lower Clay

125.73

139.9

14.17

4,503

2.40

ES-46

Upper Clay

129.44

154.18

24.74

1,918

1.02

Lower Clay

162.64

178.62

15.98

4,605

2.45

ES-47

Upper Clay

94.84

111.55

16.71

1,287

0.69

Lower Clay

125.27

150.8

25.53

5,145

2.74

 

Note: N/D means not detected

 

* LCE = lithium carbonate (Li2CO3) Equivalent: determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3 value in percent. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

 

The programme is primarily focused on significantly increasing the Indicated Mineral Resources within the Sonora Lithium Project, as well as testing whether the high grades and near surface mineralisation identified at the La Ventana concession continue into the northern area of the Fleur concession, which immediately adjoins La Ventana to the south. The Company's resource was recently updated by SRK Consulting (UK) Limited ("SRK") to:

· Indicated resources of 1.14 million tonnes ("Mt") lithium carbonate equivalent ("LCE") contained in 95Mt of clay, at lithium ("Li") grade of 2,200 ppm

· Inferred resources of 6.3Mt LCE contained in 500 Mt of clay at a Li grade of 2,300 ppm

For further details, investors are encouraged to reference the Company's press releases dated May 13 and June 26, 2015 and/or the SRK's report that was filed on May 13, 2015 and is accessible on the Company's website.

 

Upon completion of the drill programme and assaying, SRK will deliver an updated resource model for mine design purposes, with an initial focus on the higher grade, open pit resources on the La Ventana and Fleur concessions.

 

The pre-feasibility study ("PFS") for the Sonora Lithium Project in Mexico is ongoing, with metallurgical testwork, mine design and process engineering proceeding according to schedule and due to be reported in Q1, 2016.

 

Details of REM's ownership of the Sonora Lithium Project:

REM owns a direct interest of 16.4% in Bacanora, and through that holds an indirect interest in the La Ventana asset of 16.4%. In addition to the 16.4% in Bacanora, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of Megalit S.A. de CV and Mexalit S.A. de CV of 41.47%.

The Company's Executive Chairman, David Lenigas, commented:

"The positive drilling results received to date coupled with the supply agreement with Tesla announced recently has fueled the drive to accelerate the drilling programme and the mobilisation of a second drill to the Sonora Lithium Project. We look forward to providing further updates from the ongoing drilling programme and other project development activites."

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Ends

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

Notes to Editors:

About Rare Earth Minerals Plc:

Rare Earth Minerals Plc is a London listed company (LSE AIM: REM) with significant interest in the Sonora Lithium Project in northern Mexico, and in the Yangibana Rare Earths Element Project in Western Australia and a new Rare Earths Element early stage exploration project in Greenland.

 

About the Sonora Lithium Project:

The Sonora Lithium Project, which consists of ten mining concession areas covering approximately 100 thousand hectares, is located in the northeast of Sonora State 105 miles from the USA border. Sonora Lithium Project, through drilling and exploration work to date, has established an NI 43-101 compliant Indicated Mineral Resource of 1.14 million tonnes LCE contained in 95 million tonnes of clay at a lithium grade of 2,200 parts per million and an Inferred Mineral Resource of 6.3 million tonnes LCE contained in 500 million tonnes of clay at a lithium grade of 2,300 parts per million. The operational base of the Sonora Lithium Project is in Hermosillo in northern Mexico where it has built and operates a lithium pilot processing plant.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLWGUBCRUPAPPG
Date   Source Headline
30th Jun 20087:00 amRNSInterim Results
12th May 20089:17 amRNSHolding(s) in Company
9th May 20089:38 amRNSResult of AGM
7th May 20082:30 pmRNSHolding(s) in Company
7th May 20082:28 pmRNSHolding(s) in Company
7th May 20082:25 pmRNSHolding(s) in Company
31st Mar 20081:21 pmRNSAnnual Report and Accounts
28th Mar 200812:04 pmRNSFinal Results
18th Feb 20083:52 pmRNSCompletion of Disposal
18th Feb 200812:15 pmRNSBoard Changes
15th Feb 20087:00 amRNSHolding(s) in Company
13th Feb 200810:39 amRNSResult of General Meeting
28th Jan 20087:30 amRNSDisposal
17th Aug 20072:00 pmRNSAIM Rule 26 Information
15th Aug 200710:11 amRNSDirectorate Change
28th Jun 20077:00 amRNSInterim Results
19th Jun 20077:01 amRNSSettlement Re: Warranties
8th May 20071:36 pmRNSDirectorate Change
4th May 200711:51 amRNSAGM Statement
23rd Apr 200712:39 pmRNSFurther re. Director Holding
20th Apr 20074:24 pmRNSDirector/PDMR Shareholding
11th Apr 20077:01 amRNSDirectorate Change
5th Apr 20077:01 amRNSNotice of AGM
30th Mar 20073:39 pmRNSFinal Results
6th Mar 20074:18 pmRNSHolding(s) in Company
12th Dec 20069:03 amRNSTotal Voting Rights
29th Jun 20067:02 amRNSInterim Results
27th Jun 20068:24 amRNSDirectorate Change
22nd May 200612:58 pmRNSDirectorate Change
31st Mar 20067:02 amRNSGreensleeves Acquisition
30th Mar 20063:54 pmRNSEGM Statement
7th Mar 20068:21 amRNSSch 1 - Zest Group PLC
7th Mar 20067:04 amRNSFinal Results
7th Mar 20067:04 amRNSAcquisition of Greensleeves
5th Sep 20054:41 pmRNSIssue of Equity
29th Jun 20057:01 amRNSInterim Results
24th Mar 20058:00 amRNSAdmission to AIM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.