Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Operations Update

16 Feb 2012 11:00

RNS Number : 5473X
Jubilee Platinum PLC
16 February 2012
 



AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN GB0031852162 16 February 2012

Jubilee Platinum PLC

("Jubilee" or the "Company")

Update

Jubilee, the AIM and JSE quoted mine to metal specialist is pleased to report an update on its Middelburg ferroalloy smelting operation (70% owned by Jubilee Smelting and Refining (Pty) Ltd.) and development on its Leinster nickel tailings project (the "Nickel Tailings Project" or "Project") in Western Australia.

HIGHLIGHTS

·; Middelburg smelter achieved record 774 tonnes ferroalloy production in January 2012, with continued ramp up of its new furnace;

 

·; Jubilee Smelting and Refining (Pty) Ltd ("JSR") received its environmental permitting to implement both the ConRoast smelting process as well as the refining of the produced PGM (platinum group metal) alloy at its Middelburg Smelting facility; and

 

·; Jubilee's Australian subsidiary, Braemore Nickel (Pty) Ltd ("Braemore") concluded a drilling program on the Leinster nickel sulphide tailings to obtain fresh samples for testwork at Mintek South Africa, in order to refine the scoping flowsheet on the Nickel Tailings Project.

Leon Coetzer, CEO of Jubilee Platinum commented: "We are pleased with the continued improved performance at our Middelburg smelting operation. We have met our set throughput targets for January and will continue to ramp up production through this quarter as we target full production. We have continued acquiring PGM containing feed material as we migrate our smelter capacity from ferroalloy smelting to PGM smelting. 

"With regard to our Australian nickel tailings project, we are pleased to have reached this stage on the project and look forward to the outcome of the confirmation testwork at Mintek with a view towards the potential development of the tailings".

Middelburg Smelter

JSR ramped up production from its new 5MW AC furnace with a record total 774 tonnes of ferroalloy output for January for the smelter operation.

 JSR remains focussed, in the short term, on ramping up the new furnace to its planned combined ferroalloy production of 1,100 tonnes per month in order to maximise cash flow. The extended ramp-up of the furnace was due mainly to initial refractory lining concerns and the nature of the stainless steel material, which prevented running the furnace at full capacity. This has now been resolved.

The Department of Economic Development, Environment and Tourism issued JSR with an Atmospheric Emission Licence in respect of its current and submitted new planned operations. JSR's smelter operation is now fully permitted for the implementation of the ConRoast process and associated refining of the PGM containing alloy. This, together with maximising cash flow from the ferroalloy smelting process, significantly advances JSR's medium term mission for the implementation of the complete ConRoast platinum smelting process and further strengthens its position in negotiations in sourcing PGM-rich chromite tailings.

Nickel Tailings Project

Braemore drilled and obtained fresh samples in January this year from the tailings in Western Australia ("Tailings") for further testwork. The samples have been despatched to Mintek, South Africa's national mineral research organisation, which has been contracted to carry out the testwork. This testwork is towards completion of an Engineering Study and Economic Evaluation (ESEE) of the Project, currently being carried out by Bateman Engineering Projects of South Africa ("Bateman").

Bateman's technical-economic review of the Project recommended testwork comprising pre concentration of the Tailings using a combination of classification and flotation methods in order to refine the Project scoping flowsheet and demonstrate from the ESEE the potential of the Project to meet the criteria stipulated in the Tailings Supply Agreement ("TSA Criteria"). Should the testwork and the ESEE demonstrate the potential to meet the TSA Criteria, the Company would anticipate progressing to a Definitive Feasibility Study on the Project thereafter.

Contacts

Jubilee Platinum plc

Colin Bird/Leon Coetzer

Tel +44 (0) 20 7584 2155 / Tel +27 (0)11 465 1913

Andrew Sarosi

Tel +44 (0) 1752 221937

finnCap Ltd

Matthew Robinson/Rose Herbert - corporate finance

Joanna Weaving - corporate broking

Tel +44 (0) 20 7600 1658 

Shore Capital Stockbrokers Limited (Joint Broker)

Jerry Keen/ Edward Mansfield

Tel: +44 (0) 20 7 408 4090

Sasfin Capital

Leonard Eiser /Sharon Owens

Tel +27 (0) 11 809 7500

Bishopsgate Communications Ltd

Nick Rome/Shabnam Bashir

Tel +44 (0) 20 7562 3350

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDMGMZGVDGZZM
Date   Source Headline
29th May 20267:00 amRNSNotice of General Meeting
28th May 20262:10 pmRNSStrategic Investment to Support Copper Growth
6th May 20267:00 amRNSOperational and Production Update 9m FY2026
29th Apr 20267:00 amRNSCapital Reduction Court Approval
20th Apr 20264:05 pmRNSHolding(s) in Company
8th Apr 20262:57 pmRNSResults of GM & Proposed Capital Reduction
31st Mar 20267:01 amRNSImplementation of Mine Plan at Molefe
31st Mar 20267:00 amRNSFinancial report for 6 months to end-December 2025
25th Mar 20267:05 amRNSMolefe Mine Phase 1 Drilling Results
24th Mar 20267:00 amRNSMolefe Mine Phase 1 Drilling Results delayed
23rd Mar 202610:05 amRNSReduction of Share Premium Account & Notice of GM
23rd Mar 20267:00 amRNSReduction of Share Premium Account & Notice of GM
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
27th Feb 20267:00 amRNSShareholder update and Dealing in securities
19th Feb 20267:00 amRNSOperational and Projects update H1 FY2026
23rd Jan 20267:00 amRNSChanges to the Board
14th Jan 20262:19 pmRNSResults of Annual General Meeting
6th Jan 20267:00 amRNSReceipt of US$10 million in funds from SA sale
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
17th Dec 20257:00 amRNSAudited Results for FY2025 & Notice of AGM
28th Nov 20257:00 amRNSMolefe Mine Co-Operation and Development Agreement
21st Nov 20257:00 amRNSOperational Update Zambia Q1 FY2026
17th Nov 20257:00 amRNSCompetition Tribunal Approval
17th Oct 20257:00 amRNSOperational Update South Africa Q1 FY2026
6th Oct 20256:06 pmRNSTR-1: notification of major holdings
6th Oct 20257:00 amRNSZambia Copper Strategy and SA Disposal Update
8th Sep 20257:00 amRNSDealing in securities
28th Aug 20252:05 pmRNSResults of General Meeting
12th Aug 20257:00 amRNSPosting of Circular & Notice of General Meeting
6th Aug 20257:00 amRNSZambia Copper and SA Business Proposed Sale Update
21st Jul 20257:00 amRNSQ4 Operational Update - South Africa
10th Jul 20257:00 amRNSChange of Broker and Proposed Disposal Update
19th Jun 20257:00 amRNSDirectorate Change
5th Jun 20257:00 amRNSProposed Disposal of Chrome and PGM Operations
28th May 20257:02 amRNSZambia Projects Update & Issue of equity
30th Apr 20257:40 amRNSZambia Progress Update
16th Apr 20257:00 amRNSOperational Update Q3 FY2025
14th Apr 20257:00 amRNSDirectorate Change
9th Apr 20257:00 amRNSTransaction on Surplus PGM Feed Material
3rd Apr 20257:00 amRNSJubilee Transaction on Large Waste Project
31st Mar 20257:00 amRNSInterim Financial Report 6 Months to December 2024
14th Feb 20257:00 amRNSRoan Commences High Grade Copper Production
6th Feb 20257:00 amRNSZambia Projects Update
21st Jan 20257:00 amRNSAdditional power supply secured for Roan re-start
13th Jan 20257:00 amRNSOperational Update H1 FY2025
24th Dec 20247:00 amRNSHolding(s) in Company
16th Dec 20247:00 amRNSZambia Operations Update and Exercise of Options
21st Nov 20247:00 amRNSTR-1: notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.