Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Operations Update

16 Feb 2012 11:00

RNS Number : 5473X
Jubilee Platinum PLC
16 February 2012
 



AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN GB0031852162 16 February 2012

Jubilee Platinum PLC

("Jubilee" or the "Company")

Update

Jubilee, the AIM and JSE quoted mine to metal specialist is pleased to report an update on its Middelburg ferroalloy smelting operation (70% owned by Jubilee Smelting and Refining (Pty) Ltd.) and development on its Leinster nickel tailings project (the "Nickel Tailings Project" or "Project") in Western Australia.

HIGHLIGHTS

·; Middelburg smelter achieved record 774 tonnes ferroalloy production in January 2012, with continued ramp up of its new furnace;

 

·; Jubilee Smelting and Refining (Pty) Ltd ("JSR") received its environmental permitting to implement both the ConRoast smelting process as well as the refining of the produced PGM (platinum group metal) alloy at its Middelburg Smelting facility; and

 

·; Jubilee's Australian subsidiary, Braemore Nickel (Pty) Ltd ("Braemore") concluded a drilling program on the Leinster nickel sulphide tailings to obtain fresh samples for testwork at Mintek South Africa, in order to refine the scoping flowsheet on the Nickel Tailings Project.

Leon Coetzer, CEO of Jubilee Platinum commented: "We are pleased with the continued improved performance at our Middelburg smelting operation. We have met our set throughput targets for January and will continue to ramp up production through this quarter as we target full production. We have continued acquiring PGM containing feed material as we migrate our smelter capacity from ferroalloy smelting to PGM smelting. 

"With regard to our Australian nickel tailings project, we are pleased to have reached this stage on the project and look forward to the outcome of the confirmation testwork at Mintek with a view towards the potential development of the tailings".

Middelburg Smelter

JSR ramped up production from its new 5MW AC furnace with a record total 774 tonnes of ferroalloy output for January for the smelter operation.

 JSR remains focussed, in the short term, on ramping up the new furnace to its planned combined ferroalloy production of 1,100 tonnes per month in order to maximise cash flow. The extended ramp-up of the furnace was due mainly to initial refractory lining concerns and the nature of the stainless steel material, which prevented running the furnace at full capacity. This has now been resolved.

The Department of Economic Development, Environment and Tourism issued JSR with an Atmospheric Emission Licence in respect of its current and submitted new planned operations. JSR's smelter operation is now fully permitted for the implementation of the ConRoast process and associated refining of the PGM containing alloy. This, together with maximising cash flow from the ferroalloy smelting process, significantly advances JSR's medium term mission for the implementation of the complete ConRoast platinum smelting process and further strengthens its position in negotiations in sourcing PGM-rich chromite tailings.

Nickel Tailings Project

Braemore drilled and obtained fresh samples in January this year from the tailings in Western Australia ("Tailings") for further testwork. The samples have been despatched to Mintek, South Africa's national mineral research organisation, which has been contracted to carry out the testwork. This testwork is towards completion of an Engineering Study and Economic Evaluation (ESEE) of the Project, currently being carried out by Bateman Engineering Projects of South Africa ("Bateman").

Bateman's technical-economic review of the Project recommended testwork comprising pre concentration of the Tailings using a combination of classification and flotation methods in order to refine the Project scoping flowsheet and demonstrate from the ESEE the potential of the Project to meet the criteria stipulated in the Tailings Supply Agreement ("TSA Criteria"). Should the testwork and the ESEE demonstrate the potential to meet the TSA Criteria, the Company would anticipate progressing to a Definitive Feasibility Study on the Project thereafter.

Contacts

Jubilee Platinum plc

Colin Bird/Leon Coetzer

Tel +44 (0) 20 7584 2155 / Tel +27 (0)11 465 1913

Andrew Sarosi

Tel +44 (0) 1752 221937

finnCap Ltd

Matthew Robinson/Rose Herbert - corporate finance

Joanna Weaving - corporate broking

Tel +44 (0) 20 7600 1658 

Shore Capital Stockbrokers Limited (Joint Broker)

Jerry Keen/ Edward Mansfield

Tel: +44 (0) 20 7 408 4090

Sasfin Capital

Leonard Eiser /Sharon Owens

Tel +27 (0) 11 809 7500

Bishopsgate Communications Ltd

Nick Rome/Shabnam Bashir

Tel +44 (0) 20 7562 3350

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDMGMZGVDGZZM
Date   Source Headline
6th Aug 20207:00 amRNSFurther Copper Tailings Resource Secured in Zambia
13th Jul 20207:00 amRNSSix Month Operations Update
18th Jun 20207:00 amRNSLarge Copper Tailings Resources in Zambia Secured
19th May 202011:30 amRNSRelocation of chrome plant to maximise earnings
7th May 20202:00 pmRNSOperations Update in South Africa and Zambia
17th Apr 20209:15 amRNSUpdate: Operations during lockdown in South Africa
26th Mar 202010:10 amRNSUnaudited interim results
24th Mar 202011:33 amRNSSOUTH AFRICAN 21-DAY LOCKDOWN UPDATE
23rd Mar 20204:41 pmRNSSecond Price Monitoring Extn
23rd Mar 20204:37 pmRNSPrice Monitoring Extension
20th Mar 20204:47 pmRNSSecond Price Monitoring Extn
20th Mar 20204:42 pmRNSPrice Monitoring Extension
20th Mar 20202:05 pmRNSSecond Price Monitoring Extn
20th Mar 20202:00 pmRNSPrice Monitoring Extension
16th Mar 20204:42 pmRNSSecond Price Monitoring Extn
16th Mar 20204:37 pmRNSPrice Monitoring Extension
21st Feb 202010:10 amRNSDirector Dealing
28th Jan 20208:15 amRNSSix Monthly Operations Update
6th Dec 201912:45 pmRNSResults of AGM
3rd Dec 20197:00 amRNSDirector Dealing
25th Nov 20192:24 pmRNSTR-1: notification of major holdings
14th Nov 20191:15 pmRNSEquity Placing to Support Targeted Growth
14th Nov 20197:36 amRNSResults for year ended 30 June 2019 & AGM Notice
5th Nov 20198:30 amRNSAcquisition of all chrome rights at Hernic
24th Oct 20193:11 pmRNSAcquisition at Hernic: Transforming Operations
24th Sep 20197:00 amRNSNew Corporate Presentation
17th Sep 20197:00 amRNSKabwe Multi-Metal Processing Project Update
5th Sep 20198:00 amRNSWindsor PGM Project - Full Operational Status
23rd Aug 201910:15 amRNSCompletion of Acquisition in Kabwe & Joint Broker
5th Aug 20199:00 amRNSSix Monthly Operations Update
11th Jul 20197:00 amRNSProjects Update
5th Jun 20191:45 pmRNSProjects Update
9th May 20197:00 amRNSQuarterly Operations Update Q1 2019
3rd May 201912:30 pmRNSTR-1: notification of major holdings
23rd Apr 20197:00 amRNSPrice Monitoring Extension
5th Apr 20192:05 pmRNSSecond Price Monitoring Extn
5th Apr 20192:00 pmRNSPrice Monitoring Extension
4th Apr 20194:41 pmRNSTR-1: notification of major holdings
3rd Apr 20192:26 pmRNSTR-1 NOTIFICATION OF CHANGE IN MAJOR HOLDINGS
2nd Apr 20194:40 pmRNSSecond Price Monitoring Extn
2nd Apr 20194:35 pmRNSPrice Monitoring Extension
29th Mar 20191:35 pmRNSVoting Rights and Capital
29th Mar 201910:38 amRNSTR-1: Form for notification of major holdings
28th Mar 20197:00 amRNSUnaudited interim results
21st Mar 201910:58 amRNSFunding secured for Kabwe Project and Acquisition
20th Mar 20194:18 pmRNSGeneral Operations and Projects Update
17th Jan 20198:30 amRNSQuarterly Operations Update Q4 2018
18th Dec 201812:38 pmRNSTR-1: Notification of major holdings
18th Dec 20188:30 amRNSTR-1: notification of major holdings
17th Dec 20187:00 amRNSCommissioning of fine chrome operation commences

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.